Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/29/2026 |
ENGR Engineering Final
|
|
Not Ready |
Disturbed dirt area where trailers, Connexs and material was placed at Southwest corner of site-This dirt needs to be cleaned up and stabilized with either DG or Hydro seed. Water harvesting infiltration area adjacent to pad 4 refuge enclosures needs to be completed, and the basin top needs to be fixed. Dead trees need to be replaced. |