Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 04/27/2026 |
|
|
Partial Pass |
12" HDPE drain pipe on North side from trench drain to stormwater basin is installed (not yet punched through wall or connected to trench drain) at proper depth and slope, already backfilled. |
| 05/14/2026 |
|
|
Partial Pass |
OK to backfill the 8 inch roof drain 20 feet |
| 06/04/2026 |
|
|
Partial Pass |
OK to pour the concrete at the loading dock area around the storm drain |
| 08/13/2026 |
|
|
Re-inspection required |
Scuppers in sidewalk on West side of main entrance drive from Old Vail: inverts are too high, approximately 4 inches higher than the pavement/curbcut. Scupper invert needs to be lower than pavement height per plans. See attached photos showing scupper higher than pavement and refer to plans for spot elevations of pavement and scuppers. |