Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Minor site work will begin on Monday. Regular construction work will begin the following Monday on the 16th. |