Inspection History Details
Inspection Status: Not Ready
Inspection History: Final inspection to ensure all landscape and water harvesting SITE
Permit Number - TD-DEV-0323-00170
Inspection Description - Final inspection to ensure all landscape and water harvesting SITE
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | Final inspection to ensure all landscape and water harvesting SITE | Not Ready | Several ares are and have been built wrong. There is confusion on who was responsible for implementing the WH so the final grade in these areas we're never completed correctly. | |
| 05/22/2025 | Final inspection to ensure all landscape and water harvesting SITE | Not Ready | Several water harvesting areas are not graded properly. Front parking area is 16 to 20 inches high and needs to be lowered to meet plan specs. West side of the west driveway also needs to be lowered to meet the plan specs. This will be from the asphalt driveway at the front going all the way back to the end of the building. | |
| 06/04/2025 | Final inspection to ensure all landscape and water harvesting SITE | Not Ready | Water harvesting in the parking lot are adjacent to the ADA spaces is still not correct. Water harvesting off the center location of the concrete lot and to the east is holding water longer than the 12 hour requirement at 3 days holding. | |
| 06/23/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed |