Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2025 | ENGR - Drainage Structures | Not Ready | There are just to many items to list on an inspection report. Everything has issues in different locations. |