Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - RSPL - Plumbing Final 

Date Description Inspector Results Comments
05/13/2026 COT - RSPL - Plumbing Final  Partial Pass 5/13/2026
Not ready. Called in sewer connection since not available. Sewer line is holding under test with green tracer from building drain to HCS - okay to backfill with shading.
06/11/2026 COT - RSPL - Plumbing Final  Re-inspection required 6-11-26: missing cover plate at kitchen counter top , add R3 insulation to hot side of water heaters, missing air grill cover plate at entryway of unit 1, bedroom sill height is 44 1/2"- max height is 44" AFF, provide high loop at dishwashers at kitchen sinks, paint & tighten loose exterior clean out caps, provide ladder for roof access, label panel located on west side, arch fault breakers are required for all habitable areas to include, kitchens, bedrooms, hallways, living room. Have a set of approved plan on site-Stopped inspection-additional items may be noted.
06/15/2026 COT - RSPL - Plumbing Final  Not Ready
06/16/2026 COT - RSPL - Plumbing Final  Passed 06/16/2026
Corrections made to condensate and whips, verified painted exposed plastic.