Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Canceled
Inspection History: COT - HCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 05/05/2026 |
COT - HCPL - Plumbing Intermediate |
|
Canceled |
5-5-26: canceled by contractor. |
| 05/06/2026 |
COT - HCPL - Plumbing Intermediate |
|
Re-inspection required |
5-6-26: total of 7 roof drains-classroom 103 roof drain not under test, add 10 mil tape at 1st floor restrooms where copper lines are in contact with metal framing, add 10 mil tape at classrooms 104/105 to copper lines in contact with metal framing, place domestic copper lines to 80 psi min, add Boca plates to protect copper lines where installed closer than 1 1/4" from edges. Plates are to extend min of 2" at top, bottom, and sides of domestic. Hot Copper lines 3/4" and larger will require a minimum of R3 insulation. |
| 05/11/2026 |
COT - HCPL - Plumbing Intermediate |
|
Partial Pass |
5/11/26: Plumbing intermediate in-wall approved in rooms 101,102,107,108 and 109 |
| 05/15/2026 |
COT - HCPL - Plumbing Intermediate |
|
Re-inspection required |
5-15-26: classroom's 201-206- secure DWV within 4' intervals vertically (see marked areas) and secure clamps at marked areas, add plastic bushings where DWV penetrates decking and is in contact with metal framing, add 10 mil tape to copper lines in contact with metal framing. |
| 05/18/2026 |
COT - HCPL - Plumbing Intermediate |
|
Partial Pass |
5/18/2026 all corrections were made from previous inspection. Okay to proceed progress areas. |