Date Description Inspector Results Comments
04/23/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 4-23-26: okay for concrete placement at B-Decking/2nd level from classroom 202- 209.
Note: Submit all related special inspection reports for mentioned above areas to the city for review.
08/25/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 8/22/25: Reinforcement and Footer depth and width per approved plans at building footers.
08/26/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 8-26-25: verified reinforcement per S400 detail 412 for elevator shaft retaining wall at 4'. Okay to pour.
08/28/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 8-28-25: reinforcement/depth/width on column & stair footings verified per plans. Okay for concrete placement at progress areas.
09/08/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/8/25: reinforcement per approved plans at Stem wall ok to proceed with concrete placement.
09/19/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9-19-25: vapor barrier/reinforcement for slab on grade verified per plans. Okay for concrete placement at progress areas.
10/16/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 10/16/25: First lift at 4' approved. Reinforcement per approved plans. Ok to proceed with grout at columns and walls,
10/23/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 10-23-25: reinforcement on cmu wall verified per,plans. Only to grout 2nd lift at 8'.