Permit: TC-COM-1223-02914

Parcel: 126191910


Addresses:

4431 E 22ND ST

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Building Progress

Date Description Inspector Results Comments
02/10/2025 COT - HCBU - Building Progress Partial Pass 1st lift at elevator.
02/12/2025 COT - HCBU - Building Progress Not Ready Wanted Pre-grout.
02/13/2025 COT - HCBU - Building Progress Not Ready wanted pre-grout.
02/18/2025 COT - HCBU - Building Progress Partial Pass Elevator shaft at 28’ - 32’. OK to grout progress areas.
05/01/2025 COT - HCBU - Building Progress Partial Pass Level #2’ corridor ceilings; second layer of sheet rock. Ok to tape progress areas.
05/29/2025 COT - HCBU - Building Progress Partial Pass 5/29/25 Rooms on East side 1st floor-pass
06/02/2025 COT - HCBU - Building Progress Partial Pass Level #1; Room units 113 - 124.
06/12/2025 COT - HCBU - Building Progress Re-inspection required Obtain installation instructions from stucco manufacturer to verify whether wire is continuous through expansion joints and if certification is needed for installing personnel.
06/13/2025 COT - HCBU - Building Progress Partial Pass Exterior lath at Exterior walls of Room 101 - 109. Contractor unable to obtain any installation materials as requested by R. Chandler. Contractor will continue at own risk.
06/16/2025 COT - HCBU - Building Progress Partial Pass Stucco mesh for exterior walls at rooms 111 - 122: progress at own risk until manufacture information for expansion joints is provided. Level #2, corridor from,room 201 - 209: Fire caulking and rock wool. Ok to sheet rock walls.
06/17/2025 COT - HCBU - Building Progress Passed Exterior walls (lathe) at Room units #111 - 122. Ok to brown coat progress areas. Level #2 interior corridor walls at,Room,units,201 - 209. Ok to tape progress areas.