Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 02/01/2024 |
COT - HCBU - Building Above Ceiling |
|
Re-inspection required |
2/1/24: above ceiling in drop ceiling area need corrections made. Seismic wire making contact with Copper piping needs to be taped off, hangers for copper piping need to be coated or piping needs to be tapped in order to stop dissimilar material from making contact, j-boxes must be made up and labeled. |
| 02/06/2024 |
COT - HCBU - Building Above Ceiling |
|
Passed |
Approved, corrections addressed, okay to cover progress areas |