Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/07/2025 |
ENGR Engineering Final
|
|
Not Ready |
Walls look good and 3rd party inspection will be posted to site portal. Interior of switching yard will be reinspected next Friday for a partial pass on one side. TCO4 will be needed and approved for just that side. |
| 01/29/2025 |
ENGR Engineering Final
|
|
Passed |
Wall is and has been completed as per the stamped plans and its requirements. |