Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | ENGR Engineering Final | Passed | ||
| 12/16/2025 | ENGR Engineering Final | Not Ready | 12/16/25 Canopy height not to plan. It is lower than 16'-7" dimension in revised plan. Concrete Piers are not at finished above grade with slope away from column per plan. As is columns are submerged in the side of the basin. Correct or provide letter from EOR that clearance and piers are acceptable. |