Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
Permit Number - TC-COM-0523-01382
Inspection Description - COT - HCEL - Electrical Underground
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/07/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/7/24: partial for under ground electric | |
COT - HCEL - Electrical Underground | Partial Pass | 2/14/24: partial for under ground electric east of building okay to backfill trench | ||
02/23/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/23/24: dock opening 1-4 okay to cover 3/4 conduit in wall | |
02/28/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/28/24: main electric room, east side of building column line 4 panel feeders okay to cover | |
03/07/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/7/24: partial for under ground electric 2/14/24: partial for under ground electric east of building okay to backfill trench 2/23/24: dock opening 1-4 okay to cover 3/4 conduit in wall 2/28/24: main electric room, east side of building column line 4 panel feeders okay to cover 3/7/24: main electric room electrical underground complete. Ok to backfill. |
|
09/18/2024 | COT - HCEL - Electrical Underground | Partial Pass | Secondary feeders for Transformer 1 and 2. Cam locks for portable generators and permanent generator. Okay to backfill. Shading required. 9/18/2024 | |
10/07/2024 | COT - HCEL - Electrical Underground | Partial Pass | 9/25/24: okay to back fill trenches on east side of building for ev chargers, guard shack, pump house and sight lighting. | |
10/08/2024 | COT - HCEL - Electrical Underground | Partial Pass | X4 1” schedule 40 at 30” depth. 1 is for fire alarm and the three are for spares. X1 1 1/4” remainder of tie in feeding electrical panel at fire house. X1 1” for fiber pipe northwest of building for camera and light pole. Stubbed to server room. (IDF room) okay to backfill progress areas. 10/8/2024 |
|
10/20/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/7/24: partial for under ground electric 2/14/24: partial for under ground electric east of building okay to backfill trench 2/23/24: dock opening 1-4 okay to cover 3/4 conduit in wall 2/28/24: main electric room, east side of building column line 4 panel feeders okay to cover 3/7/24: main electric room electrical underground complete. Ok to backfill. 9/18/2024 Secondary feeders for Transformer 1 and 2. Cam locks for portable generators and permanent generator. Okay to backfill. Shading required. 9/18/2024 9/25/24: okay to back fill trenches on east side of building for ev chargers, guard shack, pump house and sight lighting. X4 1” schedule 40 at 30” depth. 1 is for fire alarm and the three are for spares. X1 1 1/4” remainder of tie in feeding electrical panel at fire house. X1 1” for fiber pipe northwest of building for camera and light pole. Stubbed to server room. (IDF room) okay to backfill progress areas. 10/8/2024 10/18/24: Electrical underground for light pole bases at East side of project per plans. Pending inspection on light pole reinforcement and grounding. Ok to backfill progress area. |
|
10/25/2024 | COT - HCEL - Electrical Underground | Partial Pass | 10/25/24: Electrical underground for light poles and gate controls on south side of project under main road is installed. Okay to shade conduit and backfill/compact trench. |