Inspection History Details
Inspection Status: Partial Pass
Inspection History: Pool/Spa - Electric
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | Pool/Spa - Electric | Partial Pass | 6/2/25: electrical underground and rough in passed. |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | Pool/Spa - Electric | Partial Pass | 6/2/25: electrical underground and rough in passed. |