Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Canceled
Inspection History: COT - HCBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/05/2026 |
COT - HCBU - Building Final |
|
Canceled |
1-5-26: canceled by contractor. |
| 01/15/2026 |
COT - HCBU - Building Final |
|
Re-inspection required |
1-15-26: lower unisex restroom mirror to 40" to the reflective surface, adjust restroom door to 5 pounds, label receptacle at south wall of business side, install bollard to protect water heater-have architect submit a letter to with installation details, water chlorination in progress-unable to check water, install drinking fountain faceplate, seal all penetrations above ceiling at warehouse side, install locking mechanism at restroom door, provide pictures of labeling of junction boxes at warehouse side, and paint exterior roof drain plastic. |
| 01/20/2026 |
COT - HCBU - Building Final |
|
Passed |
1-20-26: building final approved. |