Inspection Status: Canceled
Inspection History: COT - HCME - Mechanical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/05/2026 |
COT - HCME - Mechanical Final |
|
Canceled |
1-5-26: canceled by contractor. |
| 01/15/2026 |
COT - HCME - Mechanical Final |
|
Re-inspection required |
1-15-26: lower unisex restroom mirror to 40" to the reflective surface, adjust restroom door to 5 pounds, label receptacle at south wall of business side, install bollard to protect water heater-have architect submit a letter to with installation details, water chlorination in progress-unable to check water, install drinking fountain faceplate, seal all penetrations above ceiling at warehouse side, install locking mechanism at restroom door, provide pictures of labeling of junction boxes at warehouse side, and paint exterior roof drain plastic. |
| 01/20/2026 |
COT - HCME - Mechanical Final |
|
Passed |
1-20-26: mechanical final approved. |