Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | ENGR Engineering Final | Partial Pass | building two is ready for level two for TCO |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | ENGR Engineering Final | Partial Pass | building two is ready for level two for TCO |