Permit: T22CM06325

Parcel: 14043013B

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Interior Shear Bracing 

Permit Number - T22CM06325

Inspection Description - COT - HCBU - Interior Shear Bracing 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/03/2023 COT - HCBU - Interior Shear Bracing  Partial Pass Room L0500, second vestibule wall. Column K-6 room to have the big picture. D0300 west and south walls, Corridor B0510. Corridor D0600
01/10/2023 COT - HCBU - Interior Shear Bracing  Partial Pass North wall of G0600. Second layer
01/18/2023 COT - HCBU - Interior Shear Bracing  Partial Pass Room D0620 and D0605. B0500 north and east wall second layer
01/24/2023 COT - HCBU - Interior Shear Bracing  Partial Pass Room B0500, second layer room B0500 N. walls. Room D0605 & D 0610 second layer, room D0310, south wall.
01/29/2023 COT - HCBU - Interior Shear Bracing  Partial Pass Room see 0555, C0550, B0505, second layer
02/02/2023 COT - HCBU - Interior Shear Bracing  Partial Pass Room C0555
02/08/2023 COT - HCBU - Interior Shear Bracing  Partial Pass Corridor G0550
02/14/2023 COT - HCBU - Interior Shear Bracing  Partial Pass Rue de 0300, second layer east and north walls. B0500 second layer west and north walls..
02/17/2023 COT - HCBU - Interior Shear Bracing  Partial Pass room D0605
03/22/2023 COT - HCBU - Interior Shear Bracing  Partial Pass
11/09/2022 COT - HCBU - Interior Shear Bracing  Partial Pass 10/28/2022. sheet rock in room L0500, 8 feet up from floor to ceiling.

11/09/2022. sheet rock, 2nd layer in room G0600, south corridor section 90% complete of 2nd layer. 10 feet up to ceiling.

room G0500 interior conference room, south wall 95% complete of second layer floor to ceiling
11/22/2022 COT - HCBU - Interior Shear Bracing  Partial Pass second layer of drywall floor to ceiling, room G0500.
11/29/2022 COT - HCBU - Interior Shear Bracing  Partial Pass 2nd layer drywall for G0500 west side
12/05/2022 COT - HCBU - Interior Shear Bracing  Partial Pass Second layer for interior room L0500.
second layer for interior room G0500.
second layer for exterior room L0500.
12/09/2022 COT - HCBU - Interior Shear Bracing  Partial Pass Rooms G0505, G0510, G0515, H0500, H0505, F0500. L0505, L0510, L0515, L0520, K0505. 2 layers of drywall.
12/16/2022 COT - HCBU - Interior Shear Bracing  Partial Pass Corredor A0500 second layer
12/21/2022 COT - HCBU - Interior Shear Bracing  Partial Pass Corridor wall E0600, corridor wall G0550, east side, second layer. Room G0505, second layer. Room G0600 west wall. Room J0600. Room L0505, second layer