Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2025 |
COT - HCPL - Plumbing Final |
|
Partial Pass |
9-25-25: pending water meter installation. |
| 09/30/2025 |
COT - HCPL - Plumbing Final |
|
Re-inspection required |
9-30-25: complete installing all can lights outside of fire pump room at covered awning,and all exterior lights above doors located on southside of building, missing light switch covers at electrical room/fire pump room, call for a drywall nailing inspection prior to tape & texture at south covered awning, provide 3rd party report for outdoor lighting or provide all documentation regarding exterior lights to compare with approved plans, water meter must be installed by the city before closing out plumbing final for shell. |
| 11/04/2025 |
COT - HCPL - Plumbing Final |
|
Passed |
11-4-25: plumbing final approved. |