Inspection Status: Re-inspection required
Inspection History: COT - HCPL - Plumbing Roof Drains
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2025 |
COT - HCPL - Plumbing Roof Drains |
|
Re-inspection required |
6-6-25: arrived in the am and were not ready. I returned at approximately 2:27pm and did not locate point of contact. Left site at 240pm. |
| 06/10/2025 |
COT - HCPL - Plumbing Roof Drains |
|
Partial Pass |
6-10-25: 3-8" & 4-6" roof drains verified under test. Also verified a 3" copper water line under test at 60 psi. Remainder of roof drains to be inspected will be rescheduled at a later date. |
| 06/11/2025 |
COT - HCPL - Plumbing Roof Drains |
|
Partial Pass |
6-11-25: 4-8" plumbing roof drains together with a 2" DWV located on south end verified under test. |
| 06/24/2025 |
COT - HCPL - Plumbing Roof Drains |
|
Partial Pass |
6/24/2025 Roof drains on grid line I column 2, grid line E column 2, grid line C column 2, Grid line E column 8. Approved. Okay to proceed progress areas. |
| 09/25/2025 |
COT - HCPL - Plumbing Roof Drains |
|
Passed |
9-25-25: approved. |