Inspection History Details
Inspection Status: Approved
Inspection History: SIGN INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2021 | SIGN INSPECTION | Approved | )APPROVED | |
| 08/17/2021 | SIGN INSPECTION | Partial Approval | PARTIAL. THE MONUMENTS ON THE EAST SIDE DID NOT HAVE A TIMER RINS OF OF BUILDING # 6 . | |
| 08/12/2021 | SIGN INSPECTION | Continued | CN I CAN’T GET IN THE ELECTRICAL BOX .NEED TO RESCHEDULE. |