Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel141390310
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Airport Environs Zone

NCZ-A Davis Monthan AEZ Paddle

Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Street & Route

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Special Development Requests & Requirements

Date - 04/06/2026 11:31 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Type Description
T20SA00182 Approved N/A Master Sign Program (MSP 20-006) to increase total sign area to 108 square feet, from 50 square feet for apartments. Proposal shows 4 monument signs, each at 27 square feet in area, along Valencia Road, Two driveways, a sign is shown placed on both sides of each driveway. ** Director's Notice of Decision - approval with condition, issued 07/23/2020 - appeal period is until 8/06/2020.**
T21SA00325 Complete N/A

Permits

Parcel Number - 141390310
Date - 04/06/2026 11:31 a.m.
Total Number Of Permits - (738)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0223-00752 Complete 02/02/2023 08/28/2023 BLDG 1 Right-of-Way (ROW) - Utility TRENCH 2' ,BORE 98' and pull thru existing 1140'' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
TC-COM-0623-01520 Complete 06/16/2023 05/18/2024 Commercial Building Electric Vehicle Charging Station install
TC-COM-0623-01520 Complete 06/16/2023 05/18/2024 BLDG 8 Commercial Building Electric Vehicle Charging Station install
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 10 UNIT 10208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14301 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14302 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14303 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14304 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14305 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14306 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14307 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 14 UNIT 14308 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15301 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15302 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15303 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15304 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15305 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15306 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15307 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 15 UNIT 15308 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16301 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16302 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16303 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16304 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16305 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16306 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16307 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 16 UNIT 16308 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 17 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 18 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-ROW-0623-00888 Complete 06/20/2023 08/09/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project
TR-UTL-0724-01289 Complete 07/10/2024 10/23/2024 BLDG 1 Right-of-Way (ROW) - Utility TRENCH 4' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
DP18-0184 Complete 07/30/2018 03/09/2022 Development Package SITE/GRADING/SWPPP - Encantada at Rita Ranch.
TR-UTL-0923-02409 Complete 09/01/2023 03/11/2024 BLDG 1 Right-of-Way (ROW) - Utility Old permit : TR-UTL-0223-00752 TRENCH 2' , BORE 98' and 1140' pull thru TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 17 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 18 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 100 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 110 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 112 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 118 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 120 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 124 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 130 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 136 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 140 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 142 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 150 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 160 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 166 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 172 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 178 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 184 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 188 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 196 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1223-01449 Complete 12/13/2023 06/05/2024 BLDG 1 Right-of-Way (ROW) Installation of new 12inch water main to tie in new COT well site will be crossing valencia
T19CM04762 Final 07/03/2019 03/15/2022 COMBO PARKING SHADE STRUCTURE
T19CM05403 C of o 07/30/2019 03/07/2022 #17 COMBO NEW CLUB HOUSE
T19CM05408 C of o 07/30/2019 03/09/2022 #18 COMBO NEW MAINTENANCE BUILDING
T19CM05409 L of c 07/30/2019 03/12/2022 COMBO NEW POOL RAMADA & PLAYGROUND RAMADA
T19FC00774 Final 09/24/2019 12/27/2021 #01 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00777 Final 09/24/2019 11/28/2021 #02 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00778 Final 09/24/2019 02/09/2022 #03 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00779 Final 09/24/2019 10/24/2021 #04 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00780 Final 09/24/2019 10/10/2021 #05 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00781 Final 09/24/2019 02/16/2022 #06 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00782 Final 09/24/2019 02/09/2022 #07 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00783 Final 09/24/2019 01/18/2022 #08 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00784 Final 09/24/2019 01/09/2022 #09 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00785 Final 09/24/2019 07/19/2021 #10 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00786 Final 09/24/2019 08/11/2021 #11 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00787 Final 09/24/2019 08/25/2021 #12 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00788 Final 09/24/2019 05/30/2021 #13 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00789 Final 09/24/2019 04/14/2021 #14 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00790 Final 09/24/2019 07/06/2021 #15 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00791 Final 09/24/2019 09/21/2021 #16 FIRECONS NEW SPRINKLER SYSTEM TO 5-0 OUT
T19FC00883 Final 10/24/2019 07/05/2020 #01 FIRECONS UNDERGROUND FIRELINE.
T19FC00884 Final 10/24/2019 07/05/2020 #02 FIRECONS UNDERGROUND FIRELINE.
T19FC00885 Final 10/24/2019 07/11/2020 #03 FIRECONS UNDERGROUND FIRELINE.
T19FC00886 Final 10/24/2019 07/11/2020 #04 FIRECONS UNDERGROUND FIRELINE.
T19FC00887 Final 10/24/2019 07/11/2020 #05 FIRECONS UNDERGROUND FIRELINE.
T19FC00888 Final 10/24/2019 07/11/2020 #06 FIRECONS UNDERGROUND FIRELINE.
T19FC00889 Final 10/24/2019 07/11/2020 #07 FIRECONS UNDERGROUND FIRELINE.
T19FC00890 Final 10/24/2019 07/11/2020 #08 FIRECONS UNDERGROUND FIRELINE.
T19FC00891 Final 10/24/2019 07/11/2020 #09 FIRECONS UNDERGROUND FIRELINE.
T19FC00892 Final 10/24/2019 07/04/2020 #10 FIRECONS UNDERGROUND FIRELINE.
T19FC00893 Final 10/24/2019 07/04/2020 #11 FIRECONS UNDERGROUND FIRELINE.
T19FC00894 Final 10/24/2019 08/25/2020 #12 FIRECONS UNDERGROUND FIRELINE.
T19FC00895 Final 10/24/2019 07/04/2020 #18 FIRECONS UNDERGROUND FIRELINE.
T19FC00896 Final 10/24/2019 07/05/2020 #13 FIRECONS UNDERGROUND FIRELINE.
T19FC00897 Final 10/24/2019 07/05/2020 #14 FIRECONS UNDERGROUND FIRELINE.
T19FC00898 Final 10/24/2019 07/11/2020 #15 FIRECONS UNDERGROUND FIRELINE.
T19FC00899 Final 10/24/2019 07/11/2020 #16 FIRECONS UNDERGROUND FIRELINE.
T19FC00900 Final 10/24/2019 07/04/2020 #17 FIRECONS UNDERGROUND FIRELINE.
T19FC01024 Final 12/03/2019 04/14/2021 FIRECONS NEW FIRE SPRINKLERS SYSTEM TO 5-0 OUT
T19FC01025 Final 12/03/2019 12/27/2021 #18 FIRECONS NEW FIRE SPRINKLERS SYSTEM TO 5-0 OUT (25 HEADs)
T19RW04711 Final 08/27/2019 09/18/2020 ROW LA ENCANTADA RITA RANCH, PIA T19PI00004 SEWER LINE CONNECTION CROSSING VALENCIA ROAD FOR THE ENCANTADA RITA RANCH DEVELOPMENT DP18-083. 09/20/19 - PLAN CHANGE PLAN 3 - USE MESSAGE BOARDS AT NEXUS AND HOUGHTON PLAN 5 - TRAFFIC MUST NOT BE ON DIRT FOR LONGER THAN 8 HOURS, MAINTAIN DUST CONTROL. 03/11/2019 -R4: MUST USE MESSAGE BOARDS AT NEXUS AND HOUGHTON TRAFFIC SHELL NOT BE ON DIRT LONGER THAN EIGHT HOURS - DUST CONTROL MUST BE MAINTAINED.
T20BU00230 Final 06/24/2020 06/29/2021 POOL/SPA POOL & SPA
T20CM06003 Final 09/06/2020 09/07/2021 COMBO THREE SHADE STRUCTURES (1) 20'X20', (2) 12'X12'
T20OT00437 Final 06/18/2020 03/15/2022 SIGN Monument signs for apartment complex **SDRC case- increase sign area from 50 to 108 sqft - install 4 monuments along Valencia at 27 sq.ft. display each - was approved 7/23/2020 with appeal date up 08/06/2020 see T20SA00182**
T20RW00093 Final 01/07/2020 02/06/2020 ROW 2 5x5 bellholes in dirt---- to inspect gas line
T20RW00697 Void 02/05/2020 N/A ROW LA ENCANTADA RITA RANCH, PIA T19PI00004 SEWER LINE CONNECTION CROSSING VALENCIA ROAD FOR THE ENCANTADA RITA RANCH DEVELOPMENT DP18-083. 09/20/19 - PLAN CHANGE PLAN 3 - USE MESSAGE BOARDS AT NEXUS AND HOUGHTON PLAN 5 - TRAFFIC MUST NOT BE ON DIRT FOR LONGER THAN 8 HOURS, MAINTAIN DUST CONTROL.
T20RW00698 Final 02/05/2020 04/03/2020 ROW DUE TO THE OFFSITE PAVING IMPROVEMENTS PLANS FOR ENCANTADA AT RITA RANCH. SWG WILL BE RELOCATING SEGMENTS OF THE EXISTING 4" GAS LINE. NOTES: DIRT SHOLDERS MUST BE WATERED AND MAINTAINED
T20RW03018 Final 05/28/2020 08/26/2020 ROW Entering sub surface equipment (pull box) to pull/install wire to property. The pull box is in a desert area, traffic flow will not be disturbed, crew will park on the dirt. WO 6255798.
T20RW04385 Final 07/30/2020 08/30/2020 ROW (2) 5x5 bellholes in dirt/blktop front----to repair/replace gas line
T21RW02803 Final 06/09/2021 08/31/2021 ROW Continuing from out of ROW N of 9300 E Valencia Rd, Head N 50' and continue trench/bore placing 2-2" conduit. Head W and continue 113' trench/bore placing 2-2" conduit. Tie in to existing Cox Vault. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Code Enforcement

Parcel Number - 141390310
Date - 04/06/2026 11:31 a.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
T22DV00355 Noverify 01/14/2022 N/A DNR_VIOL Apt.#10103- Missing plaster in the restroom; 9 water extinguishers in the 1 bedroom apartment and tenant feels that there is a camera inside one of them

Plans

Parcel Number - 141390310
Date - 04/06/2026 11:31 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
CWH-18-0184 Active 07/30/2018 03/09/2022 Basin SITE/GRADING/SWPPP - Encantada at Rita Ranch.