Special Development Requests & Requirements
Date - 04/06/2026 11:31 a.m.
Total Number Of Special Development Permits - (2)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| T20SA00182 | Approved | N/A | Master Sign Program (MSP 20-006) to increase total sign area to 108 square feet, from 50 square feet for apartments. Proposal shows 4 monument signs, each at 27 square feet in area, along Valencia Road, Two driveways, a sign is shown placed on both sides of each driveway. ** Director's Notice of Decision - approval with condition, issued 07/23/2020 - appeal period is until 8/06/2020.** | ||
| T21SA00325 | Complete | N/A |
Permits
Parcel Number - 141390310
Date - 04/06/2026 11:31 a.m.
Total Number Of Permits - (738)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0223-00752 | Complete | 02/02/2023 | 08/28/2023 | BLDG 1 | Right-of-Way (ROW) - Utility | TRENCH 2' ,BORE 98' and pull thru existing 1140'' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE |
| TC-COM-0623-01520 | Complete | 06/16/2023 | 05/18/2024 | Commercial Building | Electric Vehicle Charging Station install | |
| TC-COM-0623-01520 | Complete | 06/16/2023 | 05/18/2024 | BLDG 8 | Commercial Building | Electric Vehicle Charging Station install |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project | |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 17 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 18 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-UTL-0724-01289 | Complete | 07/10/2024 | 10/23/2024 | BLDG 1 | Right-of-Way (ROW) - Utility | TRENCH 4' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE |
| DP18-0184 | Complete | 07/30/2018 | 03/09/2022 | Development Package | SITE/GRADING/SWPPP - Encantada at Rita Ranch. | |
| TR-UTL-0923-02409 | Complete | 09/01/2023 | 03/11/2024 | BLDG 1 | Right-of-Way (ROW) - Utility | Old permit : TR-UTL-0223-00752 TRENCH 2' , BORE 98' and 1140' pull thru TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project | |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 17 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 18 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 100 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 110 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 112 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 118 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 120 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 124 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 130 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 136 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 140 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 142 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 150 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 160 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 166 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 172 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 178 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 184 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 188 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 196 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1223-01449 | Complete | 12/13/2023 | 06/05/2024 | BLDG 1 | Right-of-Way (ROW) | Installation of new 12inch water main to tie in new COT well site will be crossing valencia |
| T19CM04762 | Final | 07/03/2019 | 03/15/2022 | COMBO | PARKING SHADE STRUCTURE | |
| T19CM05403 | C of o | 07/30/2019 | 03/07/2022 | #17 | COMBO | NEW CLUB HOUSE |
| T19CM05408 | C of o | 07/30/2019 | 03/09/2022 | #18 | COMBO | NEW MAINTENANCE BUILDING |
| T19CM05409 | L of c | 07/30/2019 | 03/12/2022 | COMBO | NEW POOL RAMADA & PLAYGROUND RAMADA | |
| T19FC00774 | Final | 09/24/2019 | 12/27/2021 | #01 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00777 | Final | 09/24/2019 | 11/28/2021 | #02 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00778 | Final | 09/24/2019 | 02/09/2022 | #03 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00779 | Final | 09/24/2019 | 10/24/2021 | #04 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00780 | Final | 09/24/2019 | 10/10/2021 | #05 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00781 | Final | 09/24/2019 | 02/16/2022 | #06 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00782 | Final | 09/24/2019 | 02/09/2022 | #07 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00783 | Final | 09/24/2019 | 01/18/2022 | #08 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00784 | Final | 09/24/2019 | 01/09/2022 | #09 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00785 | Final | 09/24/2019 | 07/19/2021 | #10 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00786 | Final | 09/24/2019 | 08/11/2021 | #11 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00787 | Final | 09/24/2019 | 08/25/2021 | #12 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00788 | Final | 09/24/2019 | 05/30/2021 | #13 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00789 | Final | 09/24/2019 | 04/14/2021 | #14 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00790 | Final | 09/24/2019 | 07/06/2021 | #15 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00791 | Final | 09/24/2019 | 09/21/2021 | #16 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00883 | Final | 10/24/2019 | 07/05/2020 | #01 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00884 | Final | 10/24/2019 | 07/05/2020 | #02 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00885 | Final | 10/24/2019 | 07/11/2020 | #03 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00886 | Final | 10/24/2019 | 07/11/2020 | #04 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00887 | Final | 10/24/2019 | 07/11/2020 | #05 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00888 | Final | 10/24/2019 | 07/11/2020 | #06 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00889 | Final | 10/24/2019 | 07/11/2020 | #07 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00890 | Final | 10/24/2019 | 07/11/2020 | #08 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00891 | Final | 10/24/2019 | 07/11/2020 | #09 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00892 | Final | 10/24/2019 | 07/04/2020 | #10 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00893 | Final | 10/24/2019 | 07/04/2020 | #11 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00894 | Final | 10/24/2019 | 08/25/2020 | #12 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00895 | Final | 10/24/2019 | 07/04/2020 | #18 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00896 | Final | 10/24/2019 | 07/05/2020 | #13 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00897 | Final | 10/24/2019 | 07/05/2020 | #14 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00898 | Final | 10/24/2019 | 07/11/2020 | #15 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00899 | Final | 10/24/2019 | 07/11/2020 | #16 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00900 | Final | 10/24/2019 | 07/04/2020 | #17 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC01024 | Final | 12/03/2019 | 04/14/2021 | FIRECONS | NEW FIRE SPRINKLERS SYSTEM TO 5-0 OUT | |
| T19FC01025 | Final | 12/03/2019 | 12/27/2021 | #18 | FIRECONS | NEW FIRE SPRINKLERS SYSTEM TO 5-0 OUT (25 HEADs) |
| T19RW04711 | Final | 08/27/2019 | 09/18/2020 | ROW | LA ENCANTADA RITA RANCH, PIA T19PI00004 SEWER LINE CONNECTION CROSSING VALENCIA ROAD FOR THE ENCANTADA RITA RANCH DEVELOPMENT DP18-083. 09/20/19 - PLAN CHANGE PLAN 3 - USE MESSAGE BOARDS AT NEXUS AND HOUGHTON PLAN 5 - TRAFFIC MUST NOT BE ON DIRT FOR LONGER THAN 8 HOURS, MAINTAIN DUST CONTROL. 03/11/2019 -R4: MUST USE MESSAGE BOARDS AT NEXUS AND HOUGHTON TRAFFIC SHELL NOT BE ON DIRT LONGER THAN EIGHT HOURS - DUST CONTROL MUST BE MAINTAINED. | |
| T20BU00230 | Final | 06/24/2020 | 06/29/2021 | POOL/SPA | POOL & SPA | |
| T20CM06003 | Final | 09/06/2020 | 09/07/2021 | COMBO | THREE SHADE STRUCTURES (1) 20'X20', (2) 12'X12' | |
| T20OT00437 | Final | 06/18/2020 | 03/15/2022 | SIGN | Monument signs for apartment complex **SDRC case- increase sign area from 50 to 108 sqft - install 4 monuments along Valencia at 27 sq.ft. display each - was approved 7/23/2020 with appeal date up 08/06/2020 see T20SA00182** | |
| T20RW00093 | Final | 01/07/2020 | 02/06/2020 | ROW | 2 5x5 bellholes in dirt---- to inspect gas line | |
| T20RW00697 | Void | 02/05/2020 | N/A | ROW | LA ENCANTADA RITA RANCH, PIA T19PI00004 SEWER LINE CONNECTION CROSSING VALENCIA ROAD FOR THE ENCANTADA RITA RANCH DEVELOPMENT DP18-083. 09/20/19 - PLAN CHANGE PLAN 3 - USE MESSAGE BOARDS AT NEXUS AND HOUGHTON PLAN 5 - TRAFFIC MUST NOT BE ON DIRT FOR LONGER THAN 8 HOURS, MAINTAIN DUST CONTROL. | |
| T20RW00698 | Final | 02/05/2020 | 04/03/2020 | ROW | DUE TO THE OFFSITE PAVING IMPROVEMENTS PLANS FOR ENCANTADA AT RITA RANCH. SWG WILL BE RELOCATING SEGMENTS OF THE EXISTING 4" GAS LINE. NOTES: DIRT SHOLDERS MUST BE WATERED AND MAINTAINED | |
| T20RW03018 | Final | 05/28/2020 | 08/26/2020 | ROW | Entering sub surface equipment (pull box) to pull/install wire to property. The pull box is in a desert area, traffic flow will not be disturbed, crew will park on the dirt. WO 6255798. | |
| T20RW04385 | Final | 07/30/2020 | 08/30/2020 | ROW | (2) 5x5 bellholes in dirt/blktop front----to repair/replace gas line | |
| T21RW02803 | Final | 06/09/2021 | 08/31/2021 | ROW | Continuing from out of ROW N of 9300 E Valencia Rd, Head N 50' and continue trench/bore placing 2-2" conduit. Head W and continue 113' trench/bore placing 2-2" conduit. Tie in to existing Cox Vault. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Code Enforcement
Parcel Number - 141390310
Date - 04/06/2026 11:31 a.m.
Total Number Of Code Cases - 1
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T22DV00355 | Noverify | 01/14/2022 | N/A | DNR_VIOL | Apt.#10103- Missing plaster in the restroom; 9 water extinguishers in the 1 bedroom apartment and tenant feels that there is a camera inside one of them |
Plans
Parcel Number - 141390310
Date - 04/06/2026 11:31 a.m.
Total Number Of Plans - 1
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-18-0184 | Active | 07/30/2018 | 03/09/2022 | Basin | SITE/GRADING/SWPPP - Encantada at Rita Ranch. |