Address Search: 9300 E VALENCIA RD
Search
Parcel Attributes
| Parcel | 14139031A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 9300 E VALENCIA RD
Date - 04/06/2026 12:52 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 9300 E VALENCIA RD
Date - 04/06/2026 12:52 p.m.
Total Number Of Special Development Permits - (3)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T19SA00032 | APPROVED | 01/24/2019 | N/A | Landscape & Screening DDO | ||
| T20SA00182 | APPROVED | 06/22/2020 | N/A | Design Review Board | Master Sign Program (MSP 20-006) to increase total sign area to 108 square feet, from 50 square feet for apartments. Proposal shows 4 monument signs, each at 27 square feet in area, along Valencia Road, Two driveways, a sign is shown placed on both sides of each driveway. ** Director's Notice of Decision - approval with condition, issued 07/23/2020 - appeal period is until 8/06/2020.** | |
| T21SA00325 | COMPLETE | 08/19/2021 | N/A | Zoning Adminstration Letter |
Permits
Address: 9300 E VALENCIA RD
Date - 04/06/2026 12:52 p.m.
Total Number Of Permits - (737)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-1223-01449 | Complete | 12/13/2023 | 06/05/2024 | BLDG 1 | Right-of-Way (ROW) | Installation of new 12inch water main to tie in new COT well site will be crossing valencia |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project | |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 17 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 18 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-UTL-0923-02409 | Complete | 09/01/2023 | 03/11/2024 | BLDG 1 | Right-of-Way (ROW) - Utility | Old permit : TR-UTL-0223-00752 TRENCH 2' , BORE 98' and 1140' pull thru TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE |
| DP18-0184 | Complete | 07/30/2018 | 03/09/2022 | Development Package | SITE/GRADING/SWPPP - Encantada at Rita Ranch. | |
| TR-UTL-0724-01289 | Complete | 07/10/2024 | 10/23/2024 | BLDG 1 | Right-of-Way (ROW) - Utility | TRENCH 4' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project | |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 10 UNIT 10208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 14 UNIT 14308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 15 UNIT 15308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 16 UNIT 16308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 17 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 18 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TR-ROW-0623-00888 | Complete | 06/20/2023 | 08/09/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-vacuum excavation of 4 utility potholes approximately 12"x12" in size for the design phase of TDOT Valencia Road: Kolb Rd to Houghton Rd project |
| TC-COM-0623-01520 | Complete | 06/16/2023 | 05/18/2024 | Commercial Building | Electric Vehicle Charging Station install | |
| TC-COM-0623-01520 | Complete | 06/16/2023 | 05/18/2024 | BLDG 8 | Commercial Building | Electric Vehicle Charging Station install |
| TR-UTL-0223-00752 | Complete | 02/02/2023 | 08/28/2023 | BLDG 1 | Right-of-Way (ROW) - Utility | TRENCH 2' ,BORE 98' and pull thru existing 1140'' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE |
| T19CM03352 | FINAL | 05/09/2019 | 02/01/2022 | COMBO | E- PRIVATE SEWER - CONSTRUCTION OF PRIVATE SANITARY SEWER AND WATER LINES | |
| T19CM04058 | C OF O | 06/06/2019 | 02/23/2022 | #01 | COMBO | NEW APARTMENT BUILDING (16 UNITS) |
| T19CM04061 | C OF O | 06/06/2019 | 03/09/2022 | #03 | COMBO | NEW APARTMENT BUILDING |
| T19CM04062 | C OF O | 06/06/2019 | 02/23/2022 | #04 | COMBO | NEW APARTMENT BUILDING |
| T19CM04063 | C OF O | 06/06/2019 | 02/23/2022 | #05 | COMBO | NEW APARTMENT BUILDING |
| T19CM04064 | C OF O | 06/06/2019 | 02/26/2022 | #06 | COMBO | NEW APARTMENT BUILDING |
| T19CM04065 | C OF O | 06/06/2019 | 03/13/2022 | #07 | COMBO | NEW APARTMENT BUILDING |
| T19CM04066 | C OF O | 06/06/2019 | 03/14/2022 | #08 | COMBO | NEW APARTMENT BUILDING |
| T19CM04067 | C OF O | 06/06/2019 | 03/09/2022 | #09 | COMBO | NEW APARTMENT BUILDING |
| T19CM04069 | C OF O | 06/06/2019 | 02/23/2022 | #10 | COMBO | NEW APARTMENT BUILDING |
| T19CM04070 | WITHDRWN | 06/06/2019 | N/A | #02 | COMBO | COM MDLA00118 T18-M0083 |
| T19CM04071 | C OF O | 06/06/2019 | 03/09/2022 | #02 | COMBO | NEW APARTMENT BUILDING |
| T19CM04072 | C OF O | 06/06/2019 | 03/14/2022 | #11 | COMBO | NEW APARTMENT BUILDING |
| T19CM04074 | C OF O | 06/06/2019 | 02/23/2022 | #12 | COMBO | NEW APARTMENT BUILDING |
| T19CM04075 | C OF O | 06/06/2019 | 03/06/2022 | #13 | COMBO | NEW APARTMENT BUILDING |
| T19CM04076 | C OF O | 06/06/2019 | 02/23/2022 | #15 | COMBO | NEW APARTMENT BUILDING |
| T19CM04077 | C OF O | 06/06/2019 | 03/09/2022 | #16 | COMBO | NEW APARTMENT BUILDING |
| T19CM04078 | C OF O | 06/06/2019 | 02/23/2022 | #14 | COMBO | NEW APARTMENT BUILDING |
| T19CM04762 | FINAL | 07/03/2019 | 03/15/2022 | COMBO | PARKING SHADE STRUCTURE | |
| T19CM05403 | C OF O | 07/30/2019 | 03/07/2022 | #17 | COMBO | NEW CLUB HOUSE |
| T19CM05408 | C OF O | 07/30/2019 | 03/09/2022 | #18 | COMBO | NEW MAINTENANCE BUILDING |
| T19CM05409 | L OF C | 07/30/2019 | 03/12/2022 | COMBO | NEW POOL RAMADA & PLAYGROUND RAMADA | |
| T19FC00774 | FINAL | 09/24/2019 | 12/27/2021 | #01 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00777 | FINAL | 09/24/2019 | 11/28/2021 | #02 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00778 | FINAL | 09/24/2019 | 02/09/2022 | #03 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00779 | FINAL | 09/24/2019 | 10/24/2021 | #04 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00780 | FINAL | 09/24/2019 | 10/10/2021 | #05 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00781 | FINAL | 09/24/2019 | 02/16/2022 | #06 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00782 | FINAL | 09/24/2019 | 02/09/2022 | #07 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00783 | FINAL | 09/24/2019 | 01/18/2022 | #08 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00784 | FINAL | 09/24/2019 | 01/09/2022 | #09 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00785 | FINAL | 09/24/2019 | 07/19/2021 | #10 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00786 | FINAL | 09/24/2019 | 08/11/2021 | #11 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00787 | FINAL | 09/24/2019 | 08/25/2021 | #12 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00788 | FINAL | 09/24/2019 | 05/30/2021 | #13 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00789 | FINAL | 09/24/2019 | 04/14/2021 | #14 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00790 | FINAL | 09/24/2019 | 07/06/2021 | #15 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00791 | FINAL | 09/24/2019 | 09/21/2021 | #16 | FIRECONS | NEW SPRINKLER SYSTEM TO 5-0 OUT |
| T19FC00883 | FINAL | 10/24/2019 | 07/05/2020 | #01 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00884 | FINAL | 10/24/2019 | 07/05/2020 | #02 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00885 | FINAL | 10/24/2019 | 07/11/2020 | #03 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00886 | FINAL | 10/24/2019 | 07/11/2020 | #04 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00887 | FINAL | 10/24/2019 | 07/11/2020 | #05 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00888 | FINAL | 10/24/2019 | 07/11/2020 | #06 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00889 | FINAL | 10/24/2019 | 07/11/2020 | #07 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00890 | FINAL | 10/24/2019 | 07/11/2020 | #08 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00891 | FINAL | 10/24/2019 | 07/11/2020 | #09 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00892 | FINAL | 10/24/2019 | 07/04/2020 | #10 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00893 | FINAL | 10/24/2019 | 07/04/2020 | #11 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00894 | FINAL | 10/24/2019 | 08/25/2020 | #12 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00895 | FINAL | 10/24/2019 | 07/04/2020 | #18 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00896 | FINAL | 10/24/2019 | 07/05/2020 | #13 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00897 | FINAL | 10/24/2019 | 07/05/2020 | #14 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00898 | FINAL | 10/24/2019 | 07/11/2020 | #15 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00899 | FINAL | 10/24/2019 | 07/11/2020 | #16 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC00900 | FINAL | 10/24/2019 | 07/04/2020 | #17 | FIRECONS | UNDERGROUND FIRELINE. |
| T19FC01024 | FINAL | 12/03/2019 | 04/14/2021 | FIRECONS | NEW FIRE SPRINKLERS SYSTEM TO 5-0 OUT | |
| T19FC01025 | FINAL | 12/03/2019 | 12/27/2021 | #18 | FIRECONS | NEW FIRE SPRINKLERS SYSTEM TO 5-0 OUT (25 HEADs) |
| T19RW04711 | FINAL | 08/27/2019 | 09/18/2020 | ROW | LA ENCANTADA RITA RANCH, PIA T19PI00004 SEWER LINE CONNECTION CROSSING VALENCIA ROAD FOR THE ENCANTADA RITA RANCH DEVELOPMENT DP18-083. 09/20/19 - PLAN CHANGE PLAN 3 - USE MESSAGE BOARDS AT NEXUS AND HOUGHTON PLAN 5 - TRAFFIC MUST NOT BE ON DIRT FOR LONGER THAN 8 HOURS, MAINTAIN DUST CONTROL. 03/11/2019 -R4: MUST USE MESSAGE BOARDS AT NEXUS AND HOUGHTON TRAFFIC SHELL NOT BE ON DIRT LONGER THAN EIGHT HOURS - DUST CONTROL MUST BE MAINTAINED. | |
| T20BU00230 | FINAL | 06/24/2020 | 06/29/2021 | POOL/SPA | POOL & SPA | |
| T20CM06003 | FINAL | 09/06/2020 | 09/07/2021 | COMBO | THREE SHADE STRUCTURES (1) 20'X20', (2) 12'X12' | |
| T20OT00437 | FINAL | 06/18/2020 | 03/15/2022 | SIGN | Monument signs for apartment complex **SDRC case- increase sign area from 50 to 108 sqft - install 4 monuments along Valencia at 27 sq.ft. display each - was approved 7/23/2020 with appeal date up 08/06/2020 see T20SA00182** | |
| T20RW00093 | FINAL | 01/07/2020 | 02/06/2020 | ROW | 2 5x5 bellholes in dirt---- to inspect gas line | |
| T20RW00697 | VOID | 02/05/2020 | N/A | ROW | LA ENCANTADA RITA RANCH, PIA T19PI00004 SEWER LINE CONNECTION CROSSING VALENCIA ROAD FOR THE ENCANTADA RITA RANCH DEVELOPMENT DP18-083. 09/20/19 - PLAN CHANGE PLAN 3 - USE MESSAGE BOARDS AT NEXUS AND HOUGHTON PLAN 5 - TRAFFIC MUST NOT BE ON DIRT FOR LONGER THAN 8 HOURS, MAINTAIN DUST CONTROL. | |
| T20RW00698 | FINAL | 02/05/2020 | 04/03/2020 | ROW | DUE TO THE OFFSITE PAVING IMPROVEMENTS PLANS FOR ENCANTADA AT RITA RANCH. SWG WILL BE RELOCATING SEGMENTS OF THE EXISTING 4" GAS LINE. NOTES: DIRT SHOLDERS MUST BE WATERED AND MAINTAINED | |
| T20RW03018 | FINAL | 05/28/2020 | 08/26/2020 | ROW | Entering sub surface equipment (pull box) to pull/install wire to property. The pull box is in a desert area, traffic flow will not be disturbed, crew will park on the dirt. WO 6255798. | |
| T20RW04385 | FINAL | 07/30/2020 | 08/30/2020 | ROW | (2) 5x5 bellholes in dirt/blktop front----to repair/replace gas line | |
| T21RW02803 | FINAL | 06/09/2021 | 08/31/2021 | ROW | Continuing from out of ROW N of 9300 E Valencia Rd, Head N 50' and continue trench/bore placing 2-2" conduit. Head W and continue 113' trench/bore placing 2-2" conduit. Tie in to existing Cox Vault. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Plans
Address: 9300 E VALENCIA RD
Date - 04/06/2026 12:52 p.m.
Total Number Of Plans - (2)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-18-0184 | Active | 07/30/2018 | 03/09/2022 | -- Commercial Water Harvesting Ordinance | SITE/GRADING/SWPPP - Encantada at Rita Ranch. | |
| T19PI00004 | FINAL | 02/27/2019 | 03/15/2022 | PAVING & SEWER -- 200 | Off Site Improvements for Encantada at Rita Ranch Construction/Installation of offsite Improvements associated with La Encantada at Rita Ranch , which comprises of installation, back-filling, grading and all clean-up necessary to install those improvements as shown on City of Tucson approved plan number I-2019-003 (all in accordance with Pima Associates of Governments (PAG) Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with PAG Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per PAG Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction. Expiration date has been revised to reflect the 180 days start -end date - 09/19/19 LI 03/09/2020: OFF SITE IMPROVEMENTS INCLUDES INSTALLATION, BACKFILLING, GRADING AND ALL CLEAN UP NECESSARY TO INSTALL THOSE IMPROVEMENTS AS SHOWN ON CITY OF TUCSON APPROVED PLANS. # 1-2019-003 |
Record Requests
Address: 9300 E VALENCIA RD
Date - 04/06/2026 12:52 p.m.
Total Number Of Requests - (1)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0223-01111 | Complete | 02/09/2023 | 03/27/2023 | Requests | *PDSD DOES NOT HOUSE THESE RECORDS. Please contact Environmental & General Services Dept (Code Enforcement) &/or Tucson Fire Dept.* - Records of interest include the following: AST (Aboveground Storage Tanks), UST (Underground Storage Tanks), hazardous material waste and hazardous material storage. |