Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T20FC00455

Parcel: 11504475B


Addresses:

1055 N PARK AV


Inspection Status: Canceled

Inspection History: FCON – OH Piping & Hydro

Permit Number - T20FC00455

Inspection Description - FCON – OH Piping & Hydro

Inspection Status - Canceled

Date Description Inspector Results Comments
06/10/2021 FCON – OH Piping & Hydro MRoss Cancelled Entered by MROSS2 - Inspecton cancelled by contractor
05/28/2021 FCON – OH Piping & Hydro CBASALDUA Partial Approval Entered by CBASALD1 - Inspection 11 - 1st Floor A side Mezzanine. 210 psi.
05/13/2021 FCON – OH Piping & Hydro MRoss Partial Approval Entered by MROSS2 - Inspection 10 - 6M - unit #610 missing coverage in back hallway, need to add a head.
05/06/2021 FCON – OH Piping & Hydro MRoss Partial Approval Entered by MROSS2 - Inspection 9 - 6th floor B side - RM 623, leak in kitchen, does closet in hallway have doors ? Corrected 5-13-2021
04/30/2021 FCON – OH Piping & Hydro jvincent Partial Approval Entered by JVINCEN1 - Inspection #6 - 6A
04/21/2021 FCON – OH Piping & Hydro MRoss Partial Approval Entered by MROSS2 - Inspection 7 - 1st floor & mezanine B side. 215psi -missing head in NW unit room entryway soffit.
04/16/2021 FCON – OH Piping & Hydro CBASALDUA Partial Approval Entered by CBASALD1 - Inspection 6 - 5th floor, B side. 210psi.
04/07/2021 FCON – OH Piping & Hydro MRoss Partial Approval Entered by MROSS2 - Inspection 5 - 5th floor, A side.
03/19/2021 FCON – OH Piping & Hydro CBASALDUA Partial Approval Entered by CBASALD1 - Inspection 4 - 4th floor, A side. 200 psi.
03/09/2021 FCON – OH Piping & Hydro Mross Partial Approval Entered by MROSS2 - Inspection 3 - 3rd floor buildinga A & B, residential areas. Room 308 adjust head spacing in hallway, room 302 back bedroom is missing coverage. 215 psi.
02/18/2021 FCON – OH Piping & Hydro MRoss Partial Approval Entered by MROSS2 - Inspection 2 - 2nd floor building B, residential areas
02/09/2021 FCON – OH Piping & Hydro MRoss Partial Approval Entered by MROSS2 - -Inspection 1 - 2nd floor, side A - residential rooms (no hallways)