Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Canceled
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2021 |
FCON – OH Piping & Hydro |
MRoss |
Cancelled |
Entered by MROSS2 - Inspecton cancelled by contractor |
| 05/28/2021 |
FCON – OH Piping & Hydro |
CBASALDUA |
Partial Approval |
Entered by CBASALD1 - Inspection 11 - 1st Floor A side Mezzanine. 210 psi. |
| 05/13/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 10 - 6M - unit #610 missing coverage in back hallway, need to add a head. |
| 05/06/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 9 - 6th floor B side - RM 623, leak in kitchen, does closet in hallway have doors ? Corrected 5-13-2021 |
| 04/30/2021 |
FCON – OH Piping & Hydro |
jvincent |
Partial Approval |
Entered by JVINCEN1 - Inspection #6 - 6A |
| 04/21/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 7 - 1st floor & mezanine B side. 215psi
-missing head in NW unit room entryway soffit. |
| 04/16/2021 |
FCON – OH Piping & Hydro |
CBASALDUA |
Partial Approval |
Entered by CBASALD1 - Inspection 6 - 5th floor, B side. 210psi. |
| 04/07/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 5 - 5th floor, A side. |
| 03/19/2021 |
FCON – OH Piping & Hydro |
CBASALDUA |
Partial Approval |
Entered by CBASALD1 - Inspection 4 - 4th floor, A side. 200 psi. |
| 03/09/2021 |
FCON – OH Piping & Hydro |
Mross |
Partial Approval |
Entered by MROSS2 - Inspection 3 - 3rd floor buildinga A & B, residential areas. Room 308 adjust head spacing in hallway, room 302 back bedroom is missing coverage. 215 psi. |
| 02/18/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 2 - 2nd floor building B, residential areas |
| 02/09/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - -Inspection 1 - 2nd floor, side A - residential rooms (no hallways) |