Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: FCON – OH Piping & Hydro
Permit Number - T20FC00455
Inspection Description - FCON – OH Piping & Hydro
Inspection Status - Canceled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2021 | FCON – OH Piping & Hydro | MRoss | Cancelled | Entered by MROSS2 - Inspecton cancelled by contractor |
05/28/2021 | FCON – OH Piping & Hydro | CBASALDUA | Partial Approval | Entered by CBASALD1 - Inspection 11 - 1st Floor A side Mezzanine. 210 psi. |
05/13/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 10 - 6M - unit #610 missing coverage in back hallway, need to add a head. |
05/06/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 9 - 6th floor B side - RM 623, leak in kitchen, does closet in hallway have doors ? Corrected 5-13-2021 |
04/30/2021 | FCON – OH Piping & Hydro | jvincent | Partial Approval | Entered by JVINCEN1 - Inspection #6 - 6A |
04/21/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 7 - 1st floor & mezanine B side. 215psi -missing head in NW unit room entryway soffit. |
04/16/2021 | FCON – OH Piping & Hydro | CBASALDUA | Partial Approval | Entered by CBASALD1 - Inspection 6 - 5th floor, B side. 210psi. |
04/07/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 5 - 5th floor, A side. |
03/19/2021 | FCON – OH Piping & Hydro | CBASALDUA | Partial Approval | Entered by CBASALD1 - Inspection 4 - 4th floor, A side. 200 psi. |
03/09/2021 | FCON – OH Piping & Hydro | Mross | Partial Approval | Entered by MROSS2 - Inspection 3 - 3rd floor buildinga A & B, residential areas. Room 308 adjust head spacing in hallway, room 302 back bedroom is missing coverage. 215 psi. |
02/18/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 2 - 2nd floor building B, residential areas |
02/09/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - -Inspection 1 - 2nd floor, side A - residential rooms (no hallways) |