Permit: T20CM07489

Parcel: 11515214B

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Masonry Pregrout 

Date Description Inspector Results Comments
08/10/2023 COT - HCBU - Masonry Pregrout  Partial Pass 1st. Lift.
08/18/2023 COT - HCBU - Masonry Pregrout  Partial Pass Partial pass. 2nd lift from 5'4" to 10'8" at booth building 3B. Okay to grout. 8/18/2023
08/25/2023 COT - HCBU - Masonry Pregrout  Partial Pass Partial pass. 3rd lift from 10'8" to 14' at north building 3B okay to grout final lift. 8/25/2023
09/21/2023 COT - HCBU - Masonry Pregrout  Passed Caisson footings for solar columns and 4’ stem wall footings. Ok to place concrete in progress areas.