Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
| Date |
Description |
Inspector |
Results |
Comments |
| 08/10/2023 |
COT - HCBU - Masonry Pregrout |
|
Partial Pass |
1st. Lift. |
| 08/18/2023 |
COT - HCBU - Masonry Pregrout |
|
Partial Pass |
Partial pass. 2nd lift from 5'4" to 10'8" at booth building 3B. Okay to grout. 8/18/2023 |
| 08/25/2023 |
COT - HCBU - Masonry Pregrout |
|
Partial Pass |
Partial pass. 3rd lift from 10'8" to 14' at north building 3B okay to grout final lift. 8/25/2023 |
| 09/21/2023 |
COT - HCBU - Masonry Pregrout |
|
Passed |
Caisson footings for solar columns and 4’ stem wall footings. Ok to place concrete in progress areas. |