Permit: T20CM07489

Parcel: 11515214B

Inspection Status: Not Ready

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning  Not Ready
09/16/2022 COT - LCBU - Excavation/Rebar/Zoning  ESTEVENS Partial Approval Entered by VVERA1 - . Partial. Step and loading dock at senior center.
09/15/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
08/10/2022 COT - LCBU - Excavation/Rebar/Zoning  DQUINN Partial Approval Entered by VVERA1 - pa Footings and 3 step rebar for NE cultural kitchen steps ok. Also, 30’ of north side sidewalk ok to pour.
08/09/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
06/16/2022 COT - LCBU - Excavation/Rebar/Zoning  TGAUSP Partial Approval Entered by NGARCIA3 - - Partial for poured in place stem and slab at south side ramp
06/15/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
06/10/2022 COT - LCBU - Excavation/Rebar/Zoning  DQUINN Partial Approval Entered by VVERA1 - pa South side ramp - 1 wall poured in place - 36’ X 12” - ok to pour.
06/09/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
06/02/2022 COT - LCBU - Excavation/Rebar/Zoning  TGAUSP Partial Approval Entered by NGARCIA3 - Partial, for foundation at the fire pit/grill, and concrete encasement for the canopy columns on the north side of the Kitchen Building, and footing at the southeast corner of the existing Ramada, and foundation for walk-in cooler location at the Senior Center, and the ramp foundation on the south side of the Cultural Kitchen Building. Okay for concrete placement
06/01/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
11/01/2021 COT - LCBU - Excavation/Rebar/Zoning  DQUINN Partial Approval Entered by VVERA1 - pa 5 footings at existing Ramada and new canopy, north of kitchen, ok to pour
06/24/2021 COT - LCBU - Excavation/Rebar/Zoning  DQUINN Approved Entered by VLEON1 -
06/18/2021 COT - LCBU - Excavation/Rebar/Zoning  DQUINN Partial Approval Entered by VLEON1 -
06/29/2023 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Building 3B footers only
07/07/2023 COT - LCBU - Excavation/Rebar/Zoning  Passed 7/7/23: 8 Canopy Column Footings for building 3B ok to pour