Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Not Ready |
|
| 09/16/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
ESTEVENS |
Partial Approval |
Entered by VVERA1 - . Partial. Step and loading dock at senior center. |
| 09/15/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 08/10/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by VVERA1 - pa
Footings and 3 step rebar for NE cultural kitchen steps ok. Also, 30’ of north side sidewalk ok to pour.
|
| 08/09/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 06/16/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
TGAUSP |
Partial Approval |
Entered by NGARCIA3 - - Partial for poured in place stem and slab at south side ramp |
| 06/15/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 06/10/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by VVERA1 - pa
South side ramp - 1 wall poured in place - 36’ X 12” - ok to pour. |
| 06/09/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 06/02/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
TGAUSP |
Partial Approval |
Entered by NGARCIA3 - Partial, for foundation at the fire pit/grill, and concrete encasement for the canopy columns on the north side of the Kitchen Building, and footing at the southeast corner of the existing Ramada, and foundation for walk-in cooler location at the Senior Center, and the ramp foundation on the south side of the Cultural Kitchen Building. Okay for concrete placement |
| 06/01/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 11/01/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by VVERA1 - pa
5 footings at existing Ramada and new canopy, north of kitchen, ok to pour |
| 06/24/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Approved |
Entered by VLEON1 - |
| 06/18/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by VLEON1 - |
| 06/29/2023 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Building 3B footers only |
| 07/07/2023 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Passed |
7/7/23: 8 Canopy Column Footings for building 3B ok to pour |