Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD | |
| 08/19/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control is ok | |
| 06/22/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | TC IS GOOD | |
| 06/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | GOT A CALL ABOUT TRAFFIC CONTROL SIGNS DOWN. BY THE TIME I GOT OUT THERE CONTRACTOR WAS SETTING THEM UP. | |
| 06/12/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | COMPLAINT ABOUT TRAFFIC CONTROL BEING TOO CLOSE TOGETHER. THE TRAFFIC CONTROL IS SET AT 12 FOOT LANES. NO ISSUES AT THIS TIME | |
| 06/08/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | COMPLAINT ABOUT TRAFFIC CONTROL DEVICES BEING TO CLOSE TOGETHER. THE TRAFFIC CONTROL MEETS STANDARDS MEET ALL |
|
| 06/05/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD LOOKS LIKE THERE GETTING READY TO PAVE | |
| 06/04/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD | |
| 05/04/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TC IS GOOD | |
| 04/24/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL NEEDED SOME WORK I LET JACK KNOW |
|
| 04/02/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD | |
| 03/23/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD | |
| 03/18/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS OK | |
| 03/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS OK | |
| 03/05/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 02/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TC OK | |
| 02/10/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 01/29/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | ADJUSTIMENTS IN THE NEW WEST BOUND LANE | |
| 01/16/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK IN ROW | |
| 12/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | RAIN | |
| 12/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD | |
| 10/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | WATCHED BORDERLAND REMOVE TEMP ASPHALT PATCH. COMPACTED SUBGRADE, ADDED TWO 2 INCH LIFTS OF CITY MIX ASPHALT ON THE NORTH SIDE OF VALENCIA. THEY USED A STRAIGHT EDGE TO MAKE SURE THERE WERE NO HUMPS OR VALLEYS IN NEW PATCH. TRAFFIC CONTROL WAS GOOD. THEY HAD TWO FLAGGERS ON SITE. REMOVED THE TEMP ASPHALT PATCH ON THE SOUTH SIDE OF VALENCIA. I LEFT BEFORE THEY WERE COMPLETE. | |
| 10/24/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | PAVING TOMMOROW | |
| 10/14/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | STREETS CALLED WITH COMPLAINT AOUT ROAD CLOSED BEFORE 9AM. I CALLED JACK HE CALLED CONTRACTOR. I CALLED BARRICADE CO. AND TOLD THEM NOT TO SET TRAFFIC CONTROL UNTIL 9AM NOT ONE MINUTE BEFORE. I TRIED TO CALL PERSON BACK. SHE DID NOT ANSWER NOR COULD I LEAVE A VOICE MAIL | |
| 10/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CHECKING BACKFILL FROM LAST NIGHT | |
| 10/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CALLED OUT BY STREETS FOR TRENCH FAILURE. CALLED CONTRACTOR TO FIX. TOOK OUT BLACK AB AND REPLACED WITH DIRT, COMPACTED AND PLACED COLD PATCH. I STAYED TO HELP WITH TRAFFIC CONTROL AS IT WAS ONLY ONE GUY AND THE OPERATOR. IT WAS VERY DARK |