Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM07159
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2021 | ENGINEERING - FINAL | Approved | APPROVED | |
| 08/16/2021 | ENGINEERING - FINAL | Partial Approval | 9027 (ENGINEERING - FINAL) IS PARTIALLY APPROVED, OK FOR A TCO. CONSTRUCTION FENCING MATERIALS HAVE BEEN NOTED IN THE AREA EAST OF THIS SITE AGAINST THE CURB, THIS NEEDS TO BE REMOVED ASAP. | |
| 08/14/2021 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO FOR OCCUPANCY | |
| 08/13/2021 | ENGINEERING - FINAL | Partial Approval | OK FOR A TCO FOR STOCKING PURPOSES ONLY, MOVING IN OFFICE FURNITURE BUT NO PERSONNEL. CONTACTED TONY TO VERIFY THAT THE WORK HAS BEEN COMPLETED AS NEEDED, HE PROVIDED PHOTOGRAPHS SHOWING THAT THERE ARE STILL ITEMS (FENCES AND DUMPSTERS) THAT NEEDED TO BE REMOVED BEFORE A FULL TCO CAN BE AUTHORIZED FOR OCCUPANCY.I WILL RECHECK THE SITE LATER ON THIS AFTERNOON TO VERIFY STATUS OF THE WORK. | |
| 08/12/2021 | ENGINEERING - FINAL | Partial Approval | THIS SITE WAS INSPECTED FOR THE INTENT THAT THEY WILL BE ASKING FOR THE TCO. CURRENTLY THEY ARE WORKING ON COMPLETING THE EAST AND WEST SIDES OF THE SITE. CREWS ARE WORKING ON THE INSTALLATION OF BRICK PAVERS AT THE SOUTHEAST CORNER OF THE SITE, THIS AREA WILL BE CHECKED FOR LEVEL ONCE THE WORK HAS BEEN COMPLETED. ALOS THE INSTALLATION OF THE HUB SIGN IS ON GOING AT THE NORTHEAST CORNER OF THE SITE. ON THE WEST SIDE OF THE SITE THE CREWS HAVE COMPLETED THE MISSING PAVER INSTALLATION, DECOMPOSED GRANITE PLACEMENT, AND ARE STILL WORKING ON THE INSTALLATION OF TGHE WALL TILES. tONY WILL BE SENDING ME PHOTOS OF THE WORK ONCE ALL OF THE ITEMS HAVE BEEN COMPLETED SO I CAN CHANGE OVER THE INSPECTION RESULTS. NO RESULTS BY THE END OF THE DAY, I WILL CHECK WITH TONY FIRST THING IN THE MORNING TO VERIFY THAT ALL OF THE WORK HAS BEEN COMPLETED. | |
| 08/11/2021 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Unable to locate project superintendent. No contact information provided. Underground parking area is not ready at this time. Construction in progress. Note, liquid discharge from all roof drains into common alleyway | |
| 08/06/2021 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Please provide contact information and scheduling for inspections. Lane closures a temporary fencing on three sides. Multiple heavy equipment on site exterior work in progress |