| 07/27/2021 | PLUMBING - PRE SLAB | Approved | ||
| 11/02/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Ramp at gridlines AC.3-A7. Wall grout 2nd lift level 1, gridlines AC-A6 to A10.5, gridlines A10.5 and A12-AB to AF. Gridlines BF-B3 to B8. | |
| 10/26/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 6, pour 25. | |
| 10/20/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 6, pour number 24. | |
| 10/14/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim. Level 6, pour 23. | |
| 10/08/2020 | PLUMBING - PRE SLAB | Partial Approval | PARTIAL. POST TENSION INSPECTION WITH BRUCE S. LEVEL 5 POUR #22. | |
| 10/02/2020 | PLUMBING - PRE SLAB | Not ready for Inspection | Not ready. Contractor cancelled. | |
| 09/28/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post Tension Cable System at Level #5; Pour #20 (East). Fire stop shafts are in place. | |
| 09/23/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Columns on level 4. Building B. | |
| 09/22/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4 pour 19. | |
| 09/16/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4 pour #18. | |
| 09/10/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4, pour 17. | |
| 09/03/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 3 pour 16. | |
| 08/27/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 3, pour number 15. | |
| 08/20/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. Spacers and pass through in place at Level #3; Pour #14/2. | |
| 06/22/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. On site with Jim B. For post tension inspection in grid line areas AA to AM north of gridline A1. Also the area within grid lines AA to AE and A4.5 to A11. Building B, Slab on grade, the area within B2 to B7 and BA to BB.7. | |
| 06/19/2020 | PLUMBING - PRE SLAB | Cancelled | This inspection was canceled by the contractor. | |
| 06/18/2020 | PLUMBING - PRE SLAB | Partial Approval | Partial. The area within A11 to A14 and AA to AE. |