Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
Permit Number - T19CM07159
Inspection Description - ELECTRIC - CONSTRUCTION POWER
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2021 | ELECTRIC - CONSTRUCTION POWER | Approved | Passed. | |
| 07/02/2021 | ELECTRIC - CONSTRUCTION POWER | Partial Approval | ||
| 06/01/2021 | ELECTRIC - CONSTRUCTION POWER | Partial Approval | Partial. Level five. Meters for501 through 509 and 525 through 528. 510 through 524. Level six. Meters for units 601 through 609 and 625 through 628. 610 through 624. Level 7. Meters for units 701 through 707. | |
| 05/28/2021 | ELECTRIC - CONSTRUCTION POWER | Partial Approval | Partial. SES for panel H is good. This is the house panel. The TP clearance code is EC0. SES retail cabinet one through 2B is good. No meters at this time. SES retail cabinet threeAA through 5B is good. No meters at this time SES RW( residential west). Is good. No meters at this time. SES-RE (residential east) Is good. No meters at this time Level two. Building B. Meters for unit 210 through 224. Level two. Building a. Meters for unit 201 through 209 and 225 through 228 Level three. Building a. Meters for unit 301 through 309 and 325 through 328 Level three building B meters for units 310 through 324 Level four building A. Meters for units 401 through 409 and 425 through 428. Level four. Building B. Meters for unit 410 through 424 The TEP clearance code is ECO for all unit meters. |