Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/27/2021 |
BUILDING ABOVE CEILING |
|
Approved |
|
| 07/13/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
1044, 1036, 2036. Partial. Elevator lobby M1 |
| 07/02/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. Lower level elevator lobby. |
| 06/25/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. Lobby ceiling. Level M1, Storage room and sauna. |
| 06/16/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. Level 6M. Corridor. |
| 06/08/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
PARTIAL WEST SIDE CORREDOR BUILDING B |
| 06/07/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. Level #6; corridor areas except for center section. Ok to cover progress areas. |
| 06/04/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. Leasing offices, level one elevator lobby, and mail room. |
| 05/25/2021 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. Lobby area; leasing area; Level #5 Corridors. Ensure all penetrations are patched or properly fire . |