Permit: T19CM07159

Parcel: 11504475B


Addresses:

1055 N PARK AV

Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
07/27/2021 FRAMING Approved
06/23/2021 FRAMING Partial Approval Partial. Pool level restrooms and lobby restrooms.
06/10/2021 FRAMING Partial Approval Partial. Annex/study area. Level 6. Building A&B corridors.
06/08/2021 FRAMING Partial Approval PARTIAL MAIN LOBBY AREA
06/02/2021 FRAMING Partial Approval Partial. Unit 219, 319, 419, 519, and 516.
05/21/2021 FRAMING Partial Approval Partial. Unit 703, 121.
05/20/2021 FRAMING Partial Approval Partial. Units 122, 707, and level four Corridor.
05/19/2021 FRAMING Partial Approval Partial. Level #1; Room Unit 122 (half Unit). Level #7; Room Unit 707. Ok to insulate and cover walls.
05/17/2021 FRAMING Denied Denied. Units 121, 122, 703, 707. Not ready, to many errors.
05/13/2021 FRAMING Partial Approval 1044, 1035, 2035, 3035, 4035. Unit 701, 702, 704, 705, 706.
05/11/2021 FRAMING Partial Approval Partial. Level two and three elevator rooms and Corridors.
05/10/2021 FRAMING Partial Approval Partial. Outdoor framing between buildings. Bridge area. Ceiling of level two.
05/10/2021 FRAMING Denied denied. Level two and three elevators and Corridor area. Too many errors, not complete.
05/06/2021 FRAMING Partial Approval Partial. Level 6, Building A&B, corridors.
04/30/2021 FRAMING Partial Approval Partial. Unit 610, 611, 612, 613, 622.
04/29/2021 FRAMING Partial Approval Partial. Level six. Units 625 and 624.
04/26/2021 FRAMING Partial Approval Partial. Townhouses unit 123, 124, 125. Level six. Unit 601, 602, 604, 608, 626, 6/27, and 628.
04/22/2021 FRAMING Partial Approval Partial. Unit 603, 605, 606, 607, and 608. Town houses are not ready.
04/20/2021 FRAMING Not ready for Inspection
04/15/2021 FRAMING Partial Approval PARTIAL LEVEL #5 - UNIT #520
04/06/2021 FRAMING Partial Approval PARTIAL BUILDING A AND B LEVEL FIVE CORRIDORS
04/02/2021 FRAMING Partial Approval 1044, 1035, 2035, 3035, 4035. Unit 517, 518, 521, 522, 523, 527, 526, 501, and 502
04/01/2021 FRAMING Partial Approval PARTIAL UNIT 509, 510, 511, 512, 513, 514, 515, 516
03/30/2021 FRAMING Partial Approval Partial. Underside second-floor soffit on east side.
03/30/2021 FRAMING Partial Approval Partial. Level five. Unit 503, 504, 505, 506, 507, 508, 527, 528.
03/25/2021 FRAMING Partial Approval PARTIAL LEVEL #4, UNITS 405, 410 THRU 424
03/19/2021 FRAMING Partial Approval Partial. Units. 426. 425. 409. 410. 424. 411. 412.
2035. Partial. Building A & B Corridors on level 4.
03/17/2021 FRAMING Partial Approval Partial. Level #4; Room Units 402; 403; 406; 407; 408; 427. Ok to insulate and cover walls.
03/16/2021 FRAMING Partial Approval Partial. Units 315, 319, 316, 401, 404, 428.
03/15/2021 FRAMING Partial Approval Partial. Building A. Framing soffit under second floor north side of building.
03/09/2021 FRAMING Partial Approval Partial. Units 320, 318, 317, 316, 321, 322, 312 313, 309, 305
03/08/2021 FRAMING Partial Approval PARTIAL UNIT #311, PARTIAL HOOD DUCT SMOKE TEST FOR JACK IN THE BOX RESTAURANT 100 FEET OF DUCT
03/05/2021 FRAMING Partial Approval Partial. Level three. Building A. Units 309, 310, 313, 314, 322, 323, 324.
03/04/2021 FRAMING Partial Approval Partial. Building B. North and west side of building. Framing under second-floor soffit.
03/04/2021 FRAMING Partial Approval Level three. Building a. Unit 302, 303, 307, 308, 326, 327, 328.
02/24/2021 FRAMING Partial Approval Partial. Level two. Units 223, 222, 221, 218.
02/17/2021 FRAMING Cancelled IVRS - AP canceled
02/17/2021 FRAMING Partial Approval Partial. Building B. Parapet.
02/02/2021 FRAMING Partial Approval PARTIAL LEVEL 6.5A EXTERIOR FRAMING
01/26/2021 FRAMING Partial Approval PARTIAL LEVEL #3 WASTE AND VENT LINES (2 1/2" - 4" LINES) FOR ROOM UNITS
12/07/2020 FRAMING Partial Approval Partial. Exterior framing of Northwest Section of Building at Levels #1; 3; 4; 5; 6.
12/07/2020 FRAMING Approved Partial. Exterior framing of Northwest Section of Building at Levels #1; 3; 4; 5; 6.