Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T19CM07159
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2021 | REINFORCED MASONRY PRE-GROUT | Approved | ||
| 12/29/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Level 6M. North Restroom wall. Building A. Exterior stairwell wall | |
| 11/27/2020 | REINFORCED MASONRY PRE-GROUT | Denied | Denied. No contact ** | |
| 11/23/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Gridlines A14-AD to AE, gridlines A7.4-AA to AC.3 | |
| 11/20/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Not ready. Level 1 Mezzanine steam room needs rebar places in bond beams. Level #1 areas, no CMU block has been placed. | |
| 11/18/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Gridlines A16-AH to AL.3 | |
| 11/17/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Gridlines A18-AD.6 to AL.5, gridlines A18-AF to AH. | |
| 11/17/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Gridlines A16-AH.1 to AL.4 | |
| 11/12/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Building A, level 1, Gridlines AA-A7.5 to A10.2 | |
| 11/10/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Building A, Level 1, Gridlines AA-A7.5 to A10.2 4th lift. | |
| 11/09/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Level #1; Mezzanine Building A; Steam Room in Building A West facade. Garage door area, topped out. Ok to place grout in progress areas. | |
| 11/05/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Not ready. | |
| 11/04/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Building A level 1, Gridlines AA-A7.5 to A14, 3rd lift. | |
| 11/03/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Level 1, Building A, Gridlines AA-A7.5 to A14. Building B, Level 1, gridlines BF-B3 to B8, 4th lift. | |
| 10/29/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Gridlines BF-B3.2 to B8, 2nd lift. | |
| 10/27/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Building A, Level 1, gridlines AA- A7 to A14. Building B, Level 1 Gridlines B7-BA.2 to BB.8, 5th lift. Gridlines B8-BB.8 to BF, 5th lift. | |
| 10/23/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Building B, level1, 1st lift, gridlines BF-B3.2 thru B8. | |
| 10/22/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Building A, gridlines A7-AB to AC. Building B, gridlines B7-BA.2 to BB.8, B8-BB.8 to BF, 4th lift. | |
| 10/19/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Level 1. 3rd lift, Gridlines B7-BA.2 to BB.8, B8-BB.8 to BF. | |
| 10/16/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Gridlines B7-BA.2 to BB.8, B8-BB.8 to BF, 2nd lift | |
| 10/14/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Building A, Level 1, A-14-AA thru AD, 3rd lift. Building B, Level 1, gridline B7-BA.2 to BB.8, 1st lift. Gridlines BB.8-B7 to B8. | |
| 10/12/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Parking garage entry area; crash walls at second lift; North building walls at 8’-12’ and 12’-16’. Ok to place grout in progress areas. | |
| 10/09/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Level 1, Building B, B3.2-BC to BE.9, 2nd lift. Building A, Level 1, A14-AA to AD, 2nd lift. |
|
| 10/08/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | PARTIAL. LEVEL 1, BUILDING B, GRIDLINES B3.2-BB.9 TO BF. GRIDLINES B3.2-BB.9 TO BF. GRINDLINES BB.9-B3.5 TO B7. BUILDING A, GRIDLINES A14-AA TO AD, GRIDLINES A7.5-AB.5 TO AC.8, LOWER LEVEL, BUILDING A, WALL SECTION AT A10-AF.9 | |
| 09/29/2020 | REINFORCED MASONRY PRE-GROUT | Cancelled | Canceled by contractor. | |
| 09/28/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Level #1; Trash Room; CMU walls at 0’-4’ and 4’-8’. Ok to place grout in progress areas. | |
| 09/24/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Lower level walls, 2nd lift, at gridlines AC-A6, AL-A2, AL-A15, parking wall AE-A4 to A11. 1st lift at gridlines A12-AH to AJ, A11-AF to AH. Level one, 1st lift, gridlines A11-AF to AH, AC.7-A6 to A10.5. |
|
| 09/22/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Lower level walls at gridlines AC-A6, AL-A2, AL-A15, parking wall AE- A4 to A11. |