Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T19CM07159
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2021 | BUILDING PRE-SLAB | Approved | ||
| 02/17/2021 | BUILDING PRE-SLAB | Partial Approval | Partial. Pour #2 of pool deck. | |
| 11/24/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Bruce. Level 7. Roof pour #29. | |
| 11/17/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 6M, pour 28 | |
| 11/09/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #6-M; Pour #27. Ok to place concrete in progress areas. | |
| 11/02/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 6 M. Pour 26. | |
| 10/30/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Building A, generator room slab. | |
| 10/26/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 6, pour 25. | |
| 10/20/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 6, pour number 24. | |
| 10/14/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim. Level 6, pour 23. | |
| 10/08/2020 | BUILDING PRE-SLAB | Partial Approval | PARTIAL. POST TENSION INSPECTION WITH BRUCE S.LEVEL 5 POUR #22. | |
| 10/02/2020 | BUILDING PRE-SLAB | Partial Approval | . Partial. Level #5; Pour #21; Post Tension Cable System. Ok to place concrete in progress area. | |
| 09/28/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post Tension Cable System at Level #5; Pour #20 (East). Ok to place concrete in progress areas. | |
| 09/22/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4 pour 19. | |
| 09/16/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4 pour #18. | |
| 09/10/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4, pour 17. | |
| 09/03/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 3 pour 16. | |
| 08/27/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 3, pour number 15. | |
| 08/20/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post Tension Cable System at Level #3; Pour #14/2. Ok to place concrete in progress areas. | |
| 08/14/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Armando. Level 2 pour 13. | |
| 08/14/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Armando. Level 2 pour 13. | |
| 08/05/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Pour #12. Level 2, within gridlines AA to AF.5 and A1 to A15.4. | |
| 07/29/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level 2 Post Tension inspection with Jim B. Pour #11. Within the area of AF.5 to AM and A1 to A16. | |
| 07/21/2020 | BUILDING PRE-SLAB | Not ready for Inspection | Not ready, not complete. | |
| 07/20/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. The area is L1 Mezz in building A. P.T. Pour 10. | |
| 07/06/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with JIm B. on pour section #7 and rebar inspection on pour #9. | |
| 07/02/2020 | BUILDING PRE-SLAB | Not ready for Inspection | Not ready, not complete. | |
| 06/30/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Pour #8. | |
| 06/25/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Pour #6 per plan S2.01B. Columns at AF-A12, AB-A12, AB-A10, AC- A10, AC.9-A9, AA-A-7, AD-A6. | |
| 06/22/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. On site with Jim B. For post tension inspection in grid line areas AA to AM north of gridline A1. Also the area within grid lines AA to AE and A4.5 to A11. Building B, Slab on grade, the area within B2 to B7 and BA to BB.7. |