Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Permit Number - T19CM07159

Inspection Description - BUILDING PRE-SLAB

Inspection Status - Approved

Date Description Inspector Results Comments
07/27/2021 BUILDING PRE-SLAB Approved
02/17/2021 BUILDING PRE-SLAB Partial Approval Partial. Pour #2 of pool deck.
11/24/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Bruce. Level 7. Roof pour #29.
11/17/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 6M, pour 28
11/09/2020 BUILDING PRE-SLAB Partial Approval Partial. Level #6-M; Pour #27. Ok to place concrete in progress areas.
11/02/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 6 M. Pour 26.
10/30/2020 BUILDING PRE-SLAB Partial Approval Partial. Building A, generator room slab.
10/26/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 6, pour 25.
10/20/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 6, pour number 24.
10/14/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim. Level 6, pour 23.
10/08/2020 BUILDING PRE-SLAB Partial Approval PARTIAL. POST TENSION INSPECTION WITH BRUCE S.LEVEL 5 POUR #22.
10/02/2020 BUILDING PRE-SLAB Partial Approval . Partial. Level #5; Pour #21; Post Tension Cable System. Ok to place concrete in progress area.
09/28/2020 BUILDING PRE-SLAB Partial Approval Partial. Post Tension Cable System at Level #5; Pour #20 (East). Ok to place concrete in progress areas.
09/22/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 4 pour 19.
09/16/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 4 pour #18.
09/10/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 4, pour 17.
09/03/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 3 pour 16.
08/27/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 3, pour number 15.
08/20/2020 BUILDING PRE-SLAB Partial Approval Partial. Post Tension Cable System at Level #3; Pour #14/2. Ok to place concrete in progress areas.
08/14/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Armando. Level 2 pour 13.
08/14/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Armando. Level 2 pour 13.
08/05/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Pour #12. Level 2, within gridlines AA to AF.5 and A1 to A15.4.
07/29/2020 BUILDING PRE-SLAB Partial Approval Partial. Level 2 Post Tension inspection with Jim B. Pour #11. Within the area of AF.5 to AM and A1 to A16.
07/21/2020 BUILDING PRE-SLAB Not ready for Inspection Not ready, not complete.
07/20/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. The area is L1 Mezz in building A. P.T. Pour 10.
07/06/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with JIm B. on pour section #7 and rebar inspection on pour #9.
07/02/2020 BUILDING PRE-SLAB Not ready for Inspection Not ready, not complete.
06/30/2020 BUILDING PRE-SLAB Partial Approval Partial. Pour #8.
06/25/2020 BUILDING PRE-SLAB Partial Approval Partial. Pour #6 per plan S2.01B. Columns at AF-A12, AB-A12, AB-A10, AC- A10, AC.9-A9, AA-A-7, AD-A6.
06/22/2020 BUILDING PRE-SLAB Partial Approval Partial. On site with Jim B. For post tension inspection in grid line areas AA to AM north of gridline A1. Also the area within grid lines AA to AE and A4.5 to A11. Building B, Slab on grade, the area within B2 to B7 and BA to BB.7.