Permit Number - T19CM07159

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
07/27/2021 EXCAVATION/LAYOUT REBAR & ZON Approved
02/19/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL - POOL DECK, POUR #3
02/17/2021 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready.
02/10/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL, LEVEL 6M POOK DECK TOP, POUR #1
01/07/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled
12/21/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Roof level, elevator/stairwell #1; over ride slab. Double mat #5 rebar at 12” on center. Ok to,place concrete..
12/11/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Building B, stairwell/elevator lid and parapet walls.
11/30/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 7, elevator shaft.
11/27/2020 EXCAVATION/LAYOUT REBAR & ZON Denied Denied. No contact **
11/23/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection
11/20/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 6 Mezzanine; walls at GL: B6/BD-AA; BD.5 - BE.5/B6-B5.5; Spa Walls. Ok to set forms and place concrete in progress areas.
11/18/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Parapet walls, gridlines A5-AA, gridlines A10-AA to AC.8, gridlines A10-BE toAB, gridlines B3.2-BE to AA, gridlines BE.3-B3.2 to B6.
11/17/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Parapet walls, Gridlines A12, AC.8, A10, AE
11/17/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 6M, Pool walls.
11/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Pool deck parapet walls at GL: AA-AE to Bump Out. Ok to set forms and place concrete in progress areas.
11/12/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Parapet wall, gridlines A2-AA to AE, gridlines AE-A2 to A6.
11/10/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 6M, Gridlines A10-AC & AC.8. Gridlines A12-AA, AC, AD, AE. Gridlines A14-AA, AC, AD, AE.
11/05/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 6M elevator shaft.
11/04/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready
10/30/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Building A, generator room slab.
10/28/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 6, columns gridlines BA to BC and B1 to B6. Elevator shaft.
10/27/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 6 columns, from BD to BF and B1 to B6.
10/22/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns on building A, Level 6.
10/19/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 6, Columns at AG-A2.4, AJ.9-A2.4, AH.2-A15, AJ.4-A15, AM-A15.4. All four Elevator walls.
10/16/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled.
10/15/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at gridlines AG-A4, AJ-A4, AG-A5, AJ-A5, AL-A5, AM-A5, AL-A9, AL-A11, AM-A9, AM-A11, AL-A13, AM-A13
10/12/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level #5; stairwell #2; shear walls. Ok to set forms and place concrete in progress areas.
10/09/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 5, Building B, columns within the gridlines of BA toBF and B1 to B6.
10/06/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Lower level topping slab.
10/05/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level #5 Mezzanine East; 19 columns. Ok to set forms and place concrete in progress areas.
10/01/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 1 masonry, gridlines AH.1-A12 thru A16. Level 5, elevator shaft walls.
09/30/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Lower level masonry, 2nd lift, at A8-AF.5. Columns on level 5, within the area of AG to AM and A2 to A15.4.
09/29/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor.
09/24/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level four elevator at BC-B3.2.
09/23/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns on level 4. Building B. Within the gridlines of B1 to B6 and BA to BF.
09/17/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 4 columns at Gridlines AB-A2, A3, A7, A10, A12, A14. Gridlines AC-A3, A10, A12, A14, AC.1-A7. Gridlines AC.3-A2, AD.6-A2. Gridlines AD-A4, A6, A12, A14. AC.9-A8. Gridlines AE-A4, A6, A8, A10, AF.4-A10.2, AF-A14, AF-A12,
09/14/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 4. Elevator shaft walls. Columns at gridlines AG-A4, AG-A5, AH-A2, AJ-A4, AJ-A5, AK-A2, gridline AL-A5, A9, A11, A13. Gridline AM-A9, A11, A13, A15.4. AH-A12, AJ.3-A12, AH.2-A15, AJ.4-A15.
09/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 3, stairwell 3 on west side.
09/04/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns on level 3 at gridlines B1-BB, BC, BD, BE, BF. Gridlines B2-BA, BB. B3-BC, BD, BE, BF. B3.2-BA. Gridlines B4-BA, BB.6, BC.9, BE, BF. Gridlines B5-BA, BB.1, BB.7, BC.9, BD.3, BF.
08/28/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 3 columns at gridlines AB-A2, A3, A7, A10, A12,, A14. Gridlines AC-A3, A7, A10, A12, A14. AC.1-A7. AC.3-A2. AC.9-A8. Gridlines AD-A4, A6, A12, A14. Gridlines AD.6-A2. AD.9-A4, AD.9-A8. Gridlines AE-A6, A8, A10. Gridlines AF-A12, A14.
08/24/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 3 columns at gridlines AH-A2, AK-A2, AH-A4, AJ-A4, A5-AH,AJ,AL,AM, AL-A9, AM-A9, AL-A11, AM-A11, AH-A12, AJ.3-A12, AL-A13, AM-A13, AH.2-A15, AJ.4-A15, AM-A15.4. Elevator walls at AJ-A11.
08/17/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level #2 to Level #3; Columns at GL: B1/BB; B/BC; B1/BD; B1/BE; B1/BF; B2/BA; B2/BB; B2/BC; B3/BC; B3/BD; B3/BF; B3.2/BA; B4/BA; B4/BB.6; B4/BC.9; B4/BE; B4/BF; B5/BA; B5/BB.1; B5/BB.7; B6/BC.9; B6/BD.3; B6/BF. Shear walls at GL: BB.6 Line; BC Line; B3.2 Line; North of B4 Line. Ok to place concrete in progress areas.
08/07/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at AE-A4, AE-A5, AE-A10.2, AF.4-A10.2, AB-A10.2, AB-A12, AC-A12, AD-A12, AF-A12, AB-A14, AC-A14, AD-A14, AF-A14.
08/06/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at AD.6-A2, AC.3-A2, AB-A2, AB-A3, AC-A3, AD-A4, AD-A6, AA-A7, AC.9-A8, AC-A10. Level 2 planter at northeast corner.
08/04/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor.
08/03/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level #2 ; columns at GL: AH/A12; AH.2/A15; AJ.3/A12; AJ.4;A15; AL/A13. AM/15.4; A8-A9/12A; AJ.3/12A-9A.
Ok to place concrete in progress areas.
07/31/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor
07/30/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. AJ-A5, AL-A5, AM-A5, AL-A9, AL-11, AM-A9, AM-A11, AM-13, AJ-A5.
07/29/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. level 2 columns at AH-A2, AK-A2, AH-A4, AJ-A4, AH-A5.
07/22/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Columns at AF-A14, AH.2-A14.
07/21/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Building A, L1 Mezz. Columns at AC.1-A7, AD-A6, AE-A6, AC.9-A8, AE-A8, AE-A10, AC-A10, AF.4-A10, AF-A12, AC-A12, AD-A12, AD-A14, AG-A12, AJ.3-A12, AL-A9, AL-A11, AM-A9, AM-A11,AL-A13, AM-A13,AM-A15.4, AJ.4-A15, AK-A16, AL.5-A16, AH.1-A16.
07/20/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Post tension inspection with Jim B. The area is L1 Mezz in building A. P.T. Pour 10.
07/14/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at AA-A3, AC-A3, AD-A4.
07/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Building A. Columns at gridline A2-columns AC.3, AD.6, AH, AK, AL.10. AD.9-A4, AL.9-A2.9, AM-A5. Building B. Columns at BA-B2, BB-B2.
07/10/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Building B, Columns at BA-B5, BA-B4, BA-B3.2, BB.1-B5, BB.6-B4. Building A, AM-A13, AM-A11, .AM-A9.
07/09/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level #1 Mezzanine, Elevator shaft at GL: A-L/.8; A/15.4. Columns at GL: A-J/.3; A-H/.3. Ok to place concrete in progress areas.
07/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at A2-AA, AG-A4, AG-A5, AJ-A4, AJ-A5, AL-A5, AL-A9, AL-A11, AL-A13, AF.4-A10.2, AH-A12, AJ-A12, AH.1-A15, AH.1-A18, AF-A18, AH.3-A18, AJ.4-A18, AL.6-A18, AJ.4-A15.
07/07/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor.
06/29/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Column footings at GL: A14/AD; A14/AE. Ok to set forms and place concrete.
06/26/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready. Will reschedule 29 June.
06/25/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Pour #6 per plan S2.01B. Columns at AF-A12, AB-A12, AB-A10, AC- A10, AC.9-A9, AA-A-7, AD-A6.
06/24/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at AD.9-A4, AE-A4, AE-A5, AC.1-A7, AE-A8, AE-A10, AC-A12, AD-A12, AB-A14, AC-A14.
06/22/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. On site with Jim B. For post tension inspection in grid line areas AA to AM north of gridline A1. Also the area within grid lines AA to AE and A4.5 to A11. Building B, Slab on grade, the area within B2 to B7 and BA to BB.7. Building B, column at BF-B1.
06/19/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled This inspection was canceled by the contractor.
06/18/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. The area within A11 to A14 and AA to AE.
06/11/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at BE-B1, BF-B4, BB.9-B2.
06/04/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancelled by contractor.
06/03/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at column BD-gridlines B3, B4, B6. BE-B3.
06/01/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Garage level #1; Columns at GL: B.8/BB.8; B.8/ BE.2; B.8/BF. Ok to place concrete in progress areas.
05/29/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Building B. Footings at gridline B1- column BB, BC, BD. Gridline B2- columns BB, BB.9.
05/28/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns. Column BA-gridlines B2, B3.2, B4, B5, B7. BC-B3, B5-BB.1, B5-BB.7, gridline B8- columns BA, BA.8, BB.1, BB.7.
05/27/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready.