Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T19CM07159
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2021 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 02/19/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PARTIAL - POOL DECK, POUR #3 | |
| 02/17/2021 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Not ready. | |
| 02/10/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PARTIAL, LEVEL 6M POOK DECK TOP, POUR #1 | |
| 01/07/2021 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | ||
| 12/21/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Roof level, elevator/stairwell #1; over ride slab. Double mat #5 rebar at 12” on center. Ok to,place concrete.. | |
| 12/11/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Building B, stairwell/elevator lid and parapet walls. | |
| 11/30/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 7, elevator shaft. | |
| 11/27/2020 | EXCAVATION/LAYOUT REBAR & ZON | Denied | Denied. No contact ** | |
| 11/23/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | ||
| 11/20/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 6 Mezzanine; walls at GL: B6/BD-AA; BD.5 - BE.5/B6-B5.5; Spa Walls. Ok to set forms and place concrete in progress areas. | |
| 11/18/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Parapet walls, gridlines A5-AA, gridlines A10-AA to AC.8, gridlines A10-BE toAB, gridlines B3.2-BE to AA, gridlines BE.3-B3.2 to B6. | |
| 11/17/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Parapet walls, Gridlines A12, AC.8, A10, AE | |
| 11/17/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 6M, Pool walls. | |
| 11/13/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Pool deck parapet walls at GL: AA-AE to Bump Out. Ok to set forms and place concrete in progress areas. | |
| 11/12/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Parapet wall, gridlines A2-AA to AE, gridlines AE-A2 to A6. | |
| 11/10/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 6M, Gridlines A10-AC & AC.8. Gridlines A12-AA, AC, AD, AE. Gridlines A14-AA, AC, AD, AE. | |
| 11/05/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 6M elevator shaft. | |
| 11/04/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Not ready | |
| 10/30/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Building A, generator room slab. | |
| 10/28/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 6, columns gridlines BA to BC and B1 to B6. Elevator shaft. | |
| 10/27/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 6 columns, from BD to BF and B1 to B6. | |
| 10/22/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns on building A, Level 6. | |
| 10/19/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 6, Columns at AG-A2.4, AJ.9-A2.4, AH.2-A15, AJ.4-A15, AM-A15.4. All four Elevator walls. | |
| 10/16/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Canceled. | |
| 10/15/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at gridlines AG-A4, AJ-A4, AG-A5, AJ-A5, AL-A5, AM-A5, AL-A9, AL-A11, AM-A9, AM-A11, AL-A13, AM-A13 | |
| 10/12/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #5; stairwell #2; shear walls. Ok to set forms and place concrete in progress areas. | |
| 10/09/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 5, Building B, columns within the gridlines of BA toBF and B1 to B6. | |
| 10/06/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Lower level topping slab. | |
| 10/05/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level #5 Mezzanine East; 19 columns. Ok to set forms and place concrete in progress areas. | |
| 10/01/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 1 masonry, gridlines AH.1-A12 thru A16. Level 5, elevator shaft walls. | |
| 09/30/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Lower level masonry, 2nd lift, at A8-AF.5. Columns on level 5, within the area of AG to AM and A2 to A15.4. | |
| 09/29/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Canceled by contractor. | |
| 09/24/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level four elevator at BC-B3.2. | |
| 09/23/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns on level 4. Building B. Within the gridlines of B1 to B6 and BA to BF. | |
| 09/17/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 4 columns at Gridlines AB-A2, A3, A7, A10, A12, A14. Gridlines AC-A3, A10, A12, A14, AC.1-A7. Gridlines AC.3-A2, AD.6-A2. Gridlines AD-A4, A6, A12, A14. AC.9-A8. Gridlines AE-A4, A6, A8, A10, AF.4-A10.2, AF-A14, AF-A12, | |
| 09/14/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 4. Elevator shaft walls. Columns at gridlines AG-A4, AG-A5, AH-A2, AJ-A4, AJ-A5, AK-A2, gridline AL-A5, A9, A11, A13. Gridline AM-A9, A11, A13, A15.4. AH-A12, AJ.3-A12, AH.2-A15, AJ.4-A15. | |
| 09/08/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 3, stairwell 3 on west side. | |
| 09/04/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns on level 3 at gridlines B1-BB, BC, BD, BE, BF. Gridlines B2-BA, BB. B3-BC, BD, BE, BF. B3.2-BA. Gridlines B4-BA, BB.6, BC.9, BE, BF. Gridlines B5-BA, BB.1, BB.7, BC.9, BD.3, BF. | |
| 08/28/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 3 columns at gridlines AB-A2, A3, A7, A10, A12,, A14. Gridlines AC-A3, A7, A10, A12, A14. AC.1-A7. AC.3-A2. AC.9-A8. Gridlines AD-A4, A6, A12, A14. Gridlines AD.6-A2. AD.9-A4, AD.9-A8. Gridlines AE-A6, A8, A10. Gridlines AF-A12, A14. | |
| 08/24/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level 3 columns at gridlines AH-A2, AK-A2, AH-A4, AJ-A4, A5-AH,AJ,AL,AM, AL-A9, AM-A9, AL-A11, AM-A11, AH-A12, AJ.3-A12, AL-A13, AM-A13, AH.2-A15, AJ.4-A15, AM-A15.4. Elevator walls at AJ-A11. | |
| 08/17/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level #2 to Level #3; Columns at GL: B1/BB; B/BC; B1/BD; B1/BE; B1/BF; B2/BA; B2/BB; B2/BC; B3/BC; B3/BD; B3/BF; B3.2/BA; B4/BA; B4/BB.6; B4/BC.9; B4/BE; B4/BF; B5/BA; B5/BB.1; B5/BB.7; B6/BC.9; B6/BD.3; B6/BF. Shear walls at GL: BB.6 Line; BC Line; B3.2 Line; North of B4 Line. Ok to place concrete in progress areas. | |
| 08/07/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at AE-A4, AE-A5, AE-A10.2, AF.4-A10.2, AB-A10.2, AB-A12, AC-A12, AD-A12, AF-A12, AB-A14, AC-A14, AD-A14, AF-A14. | |
| 08/06/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at AD.6-A2, AC.3-A2, AB-A2, AB-A3, AC-A3, AD-A4, AD-A6, AA-A7, AC.9-A8, AC-A10. Level 2 planter at northeast corner. | |
| 08/04/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Canceled by contractor. | |
| 08/03/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level #2 ; columns at GL: AH/A12; AH.2/A15; AJ.3/A12; AJ.4;A15; AL/A13. AM/15.4; A8-A9/12A; AJ.3/12A-9A. Ok to place concrete in progress areas. |
|
| 07/31/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Canceled by contractor | |
| 07/30/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. AJ-A5, AL-A5, AM-A5, AL-A9, AL-11, AM-A9, AM-A11, AM-13, AJ-A5. | |
| 07/29/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. level 2 columns at AH-A2, AK-A2, AH-A4, AJ-A4, AH-A5. | |
| 07/22/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns at AF-A14, AH.2-A14. | |
| 07/21/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Building A, L1 Mezz. Columns at AC.1-A7, AD-A6, AE-A6, AC.9-A8, AE-A8, AE-A10, AC-A10, AF.4-A10, AF-A12, AC-A12, AD-A12, AD-A14, AG-A12, AJ.3-A12, AL-A9, AL-A11, AM-A9, AM-A11,AL-A13, AM-A13,AM-A15.4, AJ.4-A15, AK-A16, AL.5-A16, AH.1-A16. | |
| 07/20/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Post tension inspection with Jim B. The area is L1 Mezz in building A. P.T. Pour 10. | |
| 07/14/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at AA-A3, AC-A3, AD-A4. | |
| 07/13/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Building A. Columns at gridline A2-columns AC.3, AD.6, AH, AK, AL.10. AD.9-A4, AL.9-A2.9, AM-A5. Building B. Columns at BA-B2, BB-B2. | |
| 07/10/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Building B, Columns at BA-B5, BA-B4, BA-B3.2, BB.1-B5, BB.6-B4. Building A, AM-A13, AM-A11, .AM-A9. | |
| 07/09/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level #1 Mezzanine, Elevator shaft at GL: A-L/.8; A/15.4. Columns at GL: A-J/.3; A-H/.3. Ok to place concrete in progress areas. | |
| 07/08/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at A2-AA, AG-A4, AG-A5, AJ-A4, AJ-A5, AL-A5, AL-A9, AL-A11, AL-A13, AF.4-A10.2, AH-A12, AJ-A12, AH.1-A15, AH.1-A18, AF-A18, AH.3-A18, AJ.4-A18, AL.6-A18, AJ.4-A15. | |
| 07/07/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Canceled by contractor. | |
| 06/29/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Column footings at GL: A14/AD; A14/AE. Ok to set forms and place concrete. | |
| 06/26/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Not ready. Will reschedule 29 June. | |
| 06/25/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Pour #6 per plan S2.01B. Columns at AF-A12, AB-A12, AB-A10, AC- A10, AC.9-A9, AA-A-7, AD-A6. | |
| 06/24/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at AD.9-A4, AE-A4, AE-A5, AC.1-A7, AE-A8, AE-A10, AC-A12, AD-A12, AB-A14, AC-A14. | |
| 06/22/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. On site with Jim B. For post tension inspection in grid line areas AA to AM north of gridline A1. Also the area within grid lines AA to AE and A4.5 to A11. Building B, Slab on grade, the area within B2 to B7 and BA to BB.7. Building B, column at BF-B1. | |
| 06/19/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | This inspection was canceled by the contractor. | |
| 06/18/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. The area within A11 to A14 and AA to AE. | |
| 06/11/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at BE-B1, BF-B4, BB.9-B2. | |
| 06/04/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Cancelled by contractor. | |
| 06/03/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns at column BD-gridlines B3, B4, B6. BE-B3. | |
| 06/01/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Garage level #1; Columns at GL: B.8/BB.8; B.8/ BE.2; B.8/BF. Ok to place concrete in progress areas. | |
| 05/29/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Building B. Footings at gridline B1- column BB, BC, BD. Gridline B2- columns BB, BB.9. | |
| 05/28/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Columns. Column BA-gridlines B2, B3.2, B4, B5, B7. BC-B3, B5-BB.1, B5-BB.7, gridline B8- columns BA, BA.8, BB.1, BB.7. | |
| 05/27/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Not ready. |