Inspection Status: Approved
Inspection History: FIREWALL/FIREBARRIER/FIRESTOP
| Date |
Description |
Inspector |
Results |
Comments |
| 07/27/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Approved |
|
| 06/04/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #8 Corridors Fire caulked, patched and taped. |
| 03/31/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #6; HVAC shafts; patched and fire caulked. |
| 03/30/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #5; shafts fire caulked throughout Level #5. |
| 03/23/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #4 shafts, fire caulked and patched. |
| 03/19/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Level #3; Corridor shafts. Ensure all sheets are cleaned of trash and construction debris. |
| 03/15/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #5; Corridor ceilings. Penetrations sealed and fire caulked. |
| 03/12/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #5; East corridor above ceiling. |
| 03/04/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #3; Corridor ceilings. Penetrations fire caulked. |
| 03/02/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #3; Corridor ceiling areas |