Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel12404098A
City of Tucson ZoningC-1, UC-1, UC-1
Tucson WardWard 6
Tucson Registered NeighborhoodWest University
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Special Development Requests & Requirements

Date - 12/23/2024 6:25 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Type Description
T19SA00023 Complete N/A ZONING LETTER FOR 947 N PARK PARCEL 12404098A
T19SA00088 Plan ck N/A MGD-19-01 New Group Dwelling

Permits

Parcel Number - 12404098A
Date - 12/23/2024 6:25 a.m.
Total Number Of Permits - (63)
Permit Permit Status Entered Date Expired Date Unit Type Description
DP19-0059 Inspections complete 03/07/2019 10/03/2022 Development Package SITE/GRADING/SWPPP - Aspire Tucson 2, 8-story student housing with parking garage, the east 168.01 f
T21CM04121 Complete 05/13/2021 09/24/2023 UNIT 151 Commercial Building TENANT IMPROVEMENT OF A NEW, ONE STORY, 3,642 S.F., RETAIL BANKING SPACE AND ASSOCIATED OFFICE SPACE
DP16-0096 Complete 06/06/2016 10/21/2017 Development Package REMOVE DRIVE THROUGH STRUCTURE AND SITE RECONFIGURATION; COMM
T22FC00401 Complete 06/09/2022 07/21/2023 Fire Construction Permit Fire Alarm & Detection Systems - STE 151 - MODIFICATION OF A VOICE FIRE ALARM SYSTEM INTO A "B" OCCUPANCY TENANT IMPROVEMENT.; Fire Alarm Systems - Devices Modified: 18; Additional Plan Reviews: 1
T22FC00405 Complete 06/13/2022 06/30/2023 Fire Construction Permit Automatic Fire Extingshing Sys - SUITE 151 - RELOCATE SPRINKLER SYSTEM TO AN EXISTING BUILDING.; Commercial Fire Sprinkler Systems - Modification of heads: 38
T22RW03261 Complete 09/08/2022 12/14/2022 Right-of-Way (ROW) WO# N.995353-1- ALONG N. EUCLID AVE ACCESS MH 6229 TO SPLICE EXISTING CABLE. BUS STOP IN THE A; Work Order: .995353-1
T22RW03271 Complete 09/08/2022 12/13/2022 Right-of-Way (ROW) WO# N.995353-4 - ALONG E. 1ST ST. ACCESS MH 7607 TO SPLICE NEW CABLE AND PLACE IN DUCT. BORE 55' T; Work Order: N.995353-4
T22RW03272 Complete 09/08/2022 12/13/2022 Right-of-Way (ROW) WO# N.995353-2- AT CORNER OF E. 1ST AND N. EUCLID AVE ACCESS MH 7031 TO SPLICE EXISTING CABLE. **; Work Order: N.995353-2
T22RW03273 Complete 09/09/2022 12/13/2022 Right-of-Way (ROW) WO# N.995353-3- ALONG E. 1ST ST ACCESS MH 7211 TO SPLICE NEW CABLE AND PLACE IN EXISTING DUCT. **; Work Order: N.995353-3
TR-ROW-1022-00028 Fees due 10/31/2022 N/A Right-of-Way (ROW) Emergency repairs - Install a mastic sealant material at the joint between the existing asphalt and concrete for the track system. Work is generally located at the radius portion of the two tracks.
T19RW06797 Complete 11/04/2019 08/30/2020 Right-of-Way (ROW) ASPIRE TUCSON 2 STUDENT HOUSING, DP19-0059BARRICADE FENCING ONLY ALONG 1ST STREET FOR THE ASPIRE
T19RW06800 Complete 11/04/2019 06/01/2020 Right-of-Way (ROW) ASPIRE TUCSON 2 STUDENT HOUSING, DP19-0059BARRICADE FENCING ONLY ALONG PARK AVE FOR THE ASPIRE T
T20OT00761 Complete 11/10/2020 05/03/2022 Sign - Permanent WALL SIGN ON 8 STORY GROUP DWELLING TOWER - ZONED UC-1PER UDC 7A.10.2.B., SIGNS OVER 50 SQFT IN
T21OT00932 Complete 12/20/2021 02/05/2024 Sign - Permanent Install of wall and projecting signs 88.19 - UC-1 zoning requires design professional review for Ma
T21SA00551 Submitted 12/20/2021 N/A Zoning Compliance
T00EL01502 Final 06/15/2000 05/27/2001 ELECT SECURITY LIGHTING
T03OT02146 Final 12/04/2003 07/11/2004 SIGN SIGN:6415
T05OT02987 Expired 12/05/2005 12/15/2009 SIGN 10166
T05OT03003 Final 12/06/2005 07/19/2006 SIGN 10169
T06OT00580 Final 03/02/2006 11/12/2006 SIGN 10729
T06OT00581 Final 03/02/2006 11/12/2006 SIGN 10730
T06OT00787 Expired 03/17/2006 04/27/2009 SIGN 10861
T06OT00883 Final 03/30/2006 04/28/2009 SIGN 10930
T07OT01805 Final 08/09/2007 03/31/2008 SIGN 13501
T15TC00101 Final 01/12/2015 N/A BARRICAD OVERNIGHT SAFETY
T16CM07023 Expired 09/12/2016 10/25/2017 COMBO DRIVE THRU/ CANOPY
T16RW02442 Void 11/02/2016 12/03/2016 ROW REMOVING PTZ CAMERA FROM STREET LIGHT POLE AND MOVING TO A NEW LOCATION
T17RW00392 Final 01/24/2017 03/05/2017 ROW TEP TO INSTALL 1 NEW POLE AND 1 NEW ANCHOR
T17RW01095 Expired 03/09/2017 05/12/2017 ROW AERIAL PERMIT NEEDED - THIS JOB WILL REPLACE ENTRANCE FACILITIES INTO 947 N PARK AVE TO ALLOW REMOVAL OF A JOINT USE POLE
T17RW01146 Final 03/13/2017 04/15/2017 ROW REPLACE 26' OF CURB ON PARK /WESTSIDE REPLACE 76' OF CURB ON 1ST STREET/SOUTHSIDE SHOULDER CLOSURE TRAFFIC CONTROL SETUP REQUIRED AND ADDRESS PEDESTRAIN CONDITIONS PER SECTION "D" OF THE MUTCD WORK DOES NOT IMPACT SUNLINK
T17RW01307 Final 03/22/2017 04/16/2017 ROW EMERGENCY (2) 5 X 5 IN BLKTOP ON 1ST STREET TO REPAIR GAS LINE
T17RW03076 Final 07/20/2017 08/23/2017 ROW CLOSING PARK AVE FOR TRUCK TO PAINT 5-STORY BUILDING
T17RW04255 Final 09/26/2017 12/12/2017 ROW ACCESSING EXISTING MANHOLE 7031, 6229 AND NEW 467TA MANHOLE. TRENCH TO PLACE 1-4" CNDT AND DIG PIT TO INTERCEPT CONDUIT
T19BU00373 Final 07/11/2019 01/08/2023 DEMO DEMO EXSISTING BUILDING AND SITE IMPROVMENTS
T19CM03789 L of c 05/29/2019 02/28/2022 COMBO FOUNDATION ONLY FOR FUTURE 10-STORY BLDG
T19CM05218 C of o 07/23/2019 05/01/2022 COMBO NEW MFR BUILDING
T19CM08934 Final 12/05/2019 05/01/2022 COMBO SITE UTILITIES
T19RW00936 Final 02/20/2019 04/22/2019 ROW N.472350 - MH access only, we are splicing existing fibers. MH #7607 located on S side of E 1st St, closest intersection N Park Ave.
T19RW03014 Final 05/30/2019 07/31/2019 ROW Accessing MH #7607 to splice fiber
T19RW06015 Final 10/11/2019 11/09/2019 ROW (2) 5 X 5 BELLHOLES IN DIRT/BLK TOP - TO PERMANTLY ABANDON GAS LINE WORK IS ON 1ST STREET
T19RW06091 Final 10/15/2019 12/14/2019 ROW JOB WILL REQUIRE ACCESS TO MH#7607 TO SPLICE FIBER AS WELL AS 14' OF TRENCHING AND PLACEMENT OF 1 NEW PRO PED A NOTICE OF TEMPORARY HOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON. TRAFFIC CONTROL SHALL BE REMOVED PRIOR TO 3:30PM
T19RW06796 Final 11/05/2019 11/07/2019 ROW ASPIRE TUCSON 2 STUDENT HOUSING, DP19-0059 POTHOLING APPROXIMATELY IN 10 LOCATIONS WITHIN 1ST STREET AND PARK AVE FOR THE ASPIRE TUCSON PROJECT. SUN LINK: A FLAGGER MUST BE PRESENT AS NEEDED WHEN WORKING WITHIN THE SUN LINK ZONE 11/06/19 ONLY
T20BU00588 Final 12/30/2020 02/09/2022 POOL/SPA Commercial Construction of New Pool & Spa on Rooftop, 9th Floor
T20FC00240 Final 04/08/2020 03/28/2022 FIRECONS New Construction Student Housing
T20FC00244 Final 04/10/2020 03/28/2022 FIRECONS Installation of new Fire Alarm System and New Two-way Communication System
T20FC00858 Final 12/28/2020 01/12/2022 FIRECONS INSTALL A BDA SYSTEM IN THIS NEW STUDENT HOUSING BUILDING
T20RW00740 Final 02/06/2020 03/08/2020 ROW INSTALLING FIRE SERVICE, CUT & PLUG SERVICE AT MAIN, INSTALLING TO NEW WATER SERVICES WITH 4" METER & 5/8" IRRIGATION METER, FIRE HYDRANT ON PARK AV TO BE INSTALLED AT A LATER DATE. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
T20RW01190 Final 02/26/2020 03/10/2020 ROW 24 HR FULL CLOSURE OF 1ST STREET BETWEEN ALLEY & PARK AVE TO ERECT ON-SITE CRANE FROM 03/05/2020 - 03/09/2020 FOR THE ASPIRE 2 BUILDING PER REVISED EXECUTED TNE. DAY TIME & NIGHT TIME WORK
T20RW01472 Withdrwn 03/05/2020 N/A ROW INSTALL 60' OF BARRIER WALL FOR WORK AREA PROTECTION
T20RW01887 Final 03/26/2020 05/09/2020 ROW FULL CLOSURE BETWEEN ALLEY & PARK AVE TO COMPLETE SEWER WORK AND TIE-INS
T20RW02559 Final 05/05/2020 05/12/2020 ROW ASPIRE TUCSON 2, DP19-0059 FULL CLOSURE BETWEEN ALLEY & PARK AVE FOR OVERNIGHT CONCRETE POUR ON APRIL 24th & 25th STARTING AT 3AM. AFTER THE FACT PERMIT
T20RW02822 Final 05/18/2020 07/17/2020 ROW ASPIRE TUCSON 2, DP19-0059 FULL CLOSURE BETWEEN ALLEY & PARK AVE FOR OVERNIGHT CONCRETE POUR ON MAY 18th, 28th; JUNE 4th, 10th, 18th and 30th WITH BACKUP DATE OF MAY 17th & 19th, 27th & 29th, June 3rd & 5th, 9th & 11th, 17th & 19th, 29th & JULY 1 STARTING AT 2AM AND CONTINUING UNTIL SUNRISE PER ATTACHED EXECUTED TNE.
T20RW03654 Final 06/26/2020 07/30/2020 ROW ROAD CLOSURE TO INSTALL CENTURYLINK AND COX ACROSS 1ST ST
T20RW04939 Final 09/08/2020 12/11/2020 ROW N.775323-5 - JOB WILL RQUIRE ACCESS TO MH #7607 TO SPLICE AND PLACE FIBER
T20RW05645 Final 10/15/2020 11/17/2020 ROW ASPIRE TUCSON II, DP19-0059 FULL ROADWAY CLOSURE OF PARK AV FROM SPEEDWAY BL TO 2ND STREET FROM MIDNIGHT TO 8AM FOR CONCRETE POUR OF THE ASPIRE II BUILDING. ALL SURROUNDING PROPERTIES HAVE BEEN NOTIFIED AND MESSAGE BOARDS ARE IN PLACE. SEE ATTACHED APPROVED TNE September 21st, 25th, 30th, October 7th, 19th & 26th with backup dates of September 22nd, 23rd, 26th, 27th, October 1st, 2nd, 8th, 9th, 20th, 21st, 27th & 28th starting at 2AM AND APPROVED SUNLINK TRACK ACCESS (POWER DOWN MIDNIGHT - 6:00 AM)
T20RW05904 Final 10/29/2020 10/30/2020 ROW FULL ROADWAY CLOSURE OF 1ST STREET FROM PARK AV TO THE ALLEY FROM 9AM - 2PM FOR A TOP OUT PARTY.
T20RW06404 Final 12/04/2020 01/10/2021 ROW Full Closure of 1st street for crane removal, 7AM Friday 12/11 through 8pm Sunday 12/13 R1 PLAN CHANGE - CHANGE DATES TO 1/1/2021 - 1/2/2021 NO OVERNIGHT WORK WILL BE REQUIRED BUT CLOSURE WILL REMAIN IN PLACE OVERNIGHT
T21CM01420 Withdrwn 02/18/2021 N/A - COMBO Modifications to the storefront system along Park Ave. Addition of ATM and Night drop box in shell approved drive-thru passageway. 1st tenant is Chase- no previous tenant.
T21FC00512 Final 06/24/2021 03/13/2022 FIRECONS INSTALL A CELLULAR COMMUNICATOR TO MONITOR THE BUILDING FIRE ALARM PANEL.
T21RW00524 Final 02/02/2021 03/05/2020 ROW FULL CLOSURE OF 1ST STREET AND FULL CLOSURE OF SOUTHBOUND PARK IN FRONT OF PROJECT TO UNLOAD SOME JOB MATERIALS 2/4/21 FROM 7AM-12PM ADVANCED NOTICE WITH MESSAGE BOARDS PRIOR TO STREET CLOSURE IS REQUIRED. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED; FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS
T21RW02496 Final 05/20/2021 06/25/2021 ROW TRAFFIC CONTROL ONLY FOR OFF-SITE IMPROVEMENTS FOR THE ASPIRE TUCSON 2, PIA NO. T19PI00015, DP19-0059.
T21RW03428 Withdrwn 07/21/2021 N/A ROW INSTALLATION OF MAST ARM ONTO TRAFFIC SIGNAL POLE. SUNLINK SHALL NOT BE AFFECTED DURING HOURS OF OPERATION. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
T22CM02777 Void 04/14/2022 N/A COMBO MODIFICATION OF A VOICE FIRE ALARM SYSTEM INTO A "B" OCCUPANCY TENANT IMPROVEMENT.

Code Enforcement

Parcel Number - 12404098A
Date - 12/23/2024 6:25 a.m.
Total Number Of Code Cases - 5
Case Number Case Status Entered Date Closed Date Unit Type Description
T06FR01372 Complete 05/16/2006 N/A FIREINSP self inspection program.
T08FR04187 Field 11/05/2008 N/A FIREINSP SPRINKLER INSPECTION
T19DV09407 Noverify 12/14/2019 N/A DNR_VIOL A construction company working on N Park Ave, in front of the Aspire apartment complex, routinely starts their construction between 4am and 5am, well before sunset. It’s extremely disruptive.
T20DV00835 Noverify 02/04/2020 N/A DNR_VIOL Working outside of legal hours, starting very early in the morning (sometimes as early as 5am)
T20DV05776 Complian 08/20/2020 N/A DNR_VIOL CONSTRUCTION WORK BEING DONE OUTSIDE OF NORMAL PERMIT TIMES AS EARY AS 4 AM IN THE MORNING CONSTRUCTION GOING ON ALL NIGHT

Plans

Parcel Number - 12404098A
Date - 12/23/2024 6:25 a.m.
Total Number Of Plans - 5
Plan Number Plan Status Application Date Expired Date Unit Type Description
T19PI00015 Approved 07/12/2019 01/12/2020 Private Improvement Agreement
S16-046 Final 06/06/2016 N/A LOT SPLIT
T18PRE0138 Applied 12/14/2018 N/A NEIGHBORHOOD NOTIFICATION
T19PRE0090 Closed 05/31/2019 N/A NEIGHBORHOOD NOTIFICATION CONDO PLAT - ASPIRE 2
T20PRE0074 Closed 06/15/2020 N/A NEIGHBORHOOD NOTIFICATION Site/Main Gate District: Chase Bank.