Permit: T19CM03789

Parcel: 12404098A


Addresses:

947 N PARK AV

Inspection Status: Approved

Inspection History: STEM WALL/RETAINING WALL

Date Description Inspector Results Comments
07/27/2021 STEM WALL/RETAINING WALL Approved
10/20/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
10/19/2020 STEM WALL/RETAINING WALL Cancelled Canceled by contractor.
10/16/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled, will reschedule for after hours inspection on 18 October
10/15/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
10/12/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level 8M, swimming pool walls at GL: D.8-E/3-6. Ok to set forms and place concrete in progress areas.
10/09/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled. Will reschedule for 12 October
10/08/2020 STEM WALL/RETAINING WALL Partial Approval Level #8; Pour #2; Shear wall #1 at GL: E-E.7/8. Columns at GL: D.8/1; D.8/2; D/3; D/4; B/4; D.9/3; D/5; D/6; B/5; A/6; E.7/5; E.7/6; F.5/7; F.5;8; F.5/9; A/9; A/8; C/8. Ok to place concrete in progress areas.
10/07/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #8 Mezzanine Pour #2: Shear wall #5 at GL: F/3-3.9; Shear Walls #6-7 at GL: G-G.2/3-3.9. Columns at GL: H.5/2; H.5/1; H.1/1; H.1/2; G.2/1; G.2/2; F.7/1; F.7/2; F.4/2; F.4/1; E.6/1; E.6/2; F.2/4.4; F.4/3.9; G/4.4. Ok to place concrete in progress areas.
10/02/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Information for MEP scheduling.
10/01/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #8 Mezzanine: Shear wall #2 at GL: H.7-I.2/8; Shear wall #4 at GL: I/5-6; Shear wall #13 at GL: J/1-2. Columns at GL: E.5/9; D.5/9; K/9: K.7.8; J/7.8; G.6/7; H/6; J/4.2; J.7/4.2. Ok to place concrete in progress areas.
09/28/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #8; Pour #2; Shear wall #1 at GL: 8/E-E.7; Shear wall #3 at GL: E/5-6. Columns at GL: D/4.1; B/4; B/5; D/5; A/6; D/6; C/8; A/8; A/9; D.5/9; F.5/9; F.5/8; F.5/7; E.7/6; E.7/5. Ok to place concrete in progress areas.
09/25/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #8; Pour #2: Shear wall #5 at GL: F/3-4. Columns at GL: F.4/3.9; F.4/3; F.7/2; F.7/1; F.4/1; F.4/2; E.6/2; E.6/1; D.8/2; D.8/1; B/2; B/3; D.9/3; D.9/3.9; F.2/4.4. Ok to set forms and place concrete in progress areas.
09/22/2020 STEM WALL/RETAINING WALL Partial Approval 01010. Partial. Level #7; Pour#1; Shear wall #2 at GL: 8/H-I. Columns at GL: H/5.8; D.6/7; D.6/8; H.7/9; G.6/9; I.7/9; K/9; K/8; J/8; J.5/6; K.5/6; J.7/4.2; J/4.2; J/3.2; K/3.2; J.9/2. Ok to place concrete in progress areas.
09/22/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #8; Pour #2; Shear wall #4 at GL: I/5-6; Shear wall #13 at GL: J/1-2. Columns at GL: I.2/3.9; I.2/3; J.7;1; I.3/2; H.5/1; H.5/2; H.1/2; H.1/1; G.2/2; G.2/1; G.9/4.4; G/4.4. Ok to place concrete in progress areas.
09/15/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #7; Pour #1; Shear Wall #1 at GL: 8/E-E.7; Shear wall #3 at GL: E/5-5.9. Columns at GL: D.9/3.9; D/4; B/4; B/5; D/5; A/6; D/6; C/8; A/8; A/9; B.5/9; E.5/9; F.5/9; F.5/8; F.5/7; E.7/6; E.7/5. Ok to place concrete in progress areas.
09/11/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Will reschedule for 12 September (after hours inspection)
09/08/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #7; Pour #2; Section #2; Columns at GL: H/5.6; G.6/7; G.6/6; G.6/9; H.7/9; I.7/9; K/9; K/7.8; J/7.8; K/5.6; J/5.6; J.7/4.2; J/4.2; I.2/3.9; . Shear wall #2 at GL: 8/H.7-I.2; Shear wall #4 at GL: I/5-6. Ok to place forms and concrete.
09/03/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
09/01/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #6; Pour #1: Columns at GL: F.2/4.4; F.4/3.9; F.4/3; F.4/2; D.8/2; D.8/1; B/1; B/2; B/3; D/3; D.9/3; D.9/3.9. Shear wall #5 at GL: F/3-3.9; Shear wall #12 at GL: E.6/1-2. Ok to place concrete in progress areas.
08/31/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled will reschedule for 1 September.
08/28/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
08/27/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #6; Pour #2: Columns at GL: J/3.2; K/3.2; K/2: J.7/1; I/2.3; I/3.2; I/3.1; H.5/2; H.5/1; H.1/1; H.1/2; G.2/1; G.2/2; F.7/2; F.7/1. Shear Walls #9; 10; 11 at GL: G.6-H.1/3-4.9; Shear Walls 6; 7; 8 at GL: G-G.2/3-3.9; Shear wall #13 at GL: J/1-2. Ok to place concrete in progress areas.
08/26/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #6; Pour #1; Section #1 columns at GL: G.9/5.6; G.6/7; G.6/8; G.6/9; H.7/9; I.7/9; K/9; K/7.8; J/7.8; K/5.6; J/5.6; I.2/3.9; J/4.2; J.7/4.2. Shear wall #2 at GL: H.7-I.2/8; Shear wall #4 at I/5-6. Ok to place concrete in progress areas.
08/25/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled
08/21/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #5; Pour #2: Columns at GL: B/4; D/4; B/5; D/5; D/6; A/6; C/8; A/8; A/9; D.5/9; E.5/9; F.5/9; F.5/8; F.5/7.
Shear walls; Shear wall #1 at GL: 8/D.9-E.7; Shear wall #3 at GL: E/5-6; Shear wall #5 at GL: F/3-3.9; Shear wall #12 at GL: E.6/1-2. Ok to place concrete in progress areas.
08/20/2020 STEM WALL/RETAINING WALL Partial Approval Partial Level #5; Pour two North; columns at GL: 3.9/F.4; F.2/4.4; F.4/3; F.4/2; F.4/1; D.8/2; D.8/1; B/.09; B/2; B/3; D/3; D.9/3; D/3.9; E.7/5; E.7/6. Ok to set forms and place concrete in progress areas.
08/19/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Post Tension Cable System at Level #5; pour #2: GL: G-A/0.09-9. Ok to place concrete in progress areas.
08/18/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
08/14/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #5; Shear wall #13 at GL: J/1-2. Columns at GL: I.2/3; J/3.2; K/3.2; K/2; J.7/1; I.3/1; I.3/2; H.5/2; H.5/1; H.1/1; H.1/2; G.2/1; G.2/2; F.7/2. Ok to place concrete in progress areas.
08/12/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
08/10/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #4; Pour #2; Columns at GL: D/4.1; B/4.1; B/5; D/5; D/5.9; C/8; A/8; A/9; D.5/9; E.5/9; F.5/9; F.5/8; F.5/7; E.7/5.9. Shear Wall #1 at GL: E-E.7/8; Shear Wall #3 at GL: E/5-5.6. Ok to set forms and place concrete in progress areas.
08/07/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #4; Pour #2 Shear wall #5 at GL: F/3-3.9; Shear wall #12 at GL: E.6/1-2. Ok to place concrete in progress areas. Columns at GL: F.2/4.4; F.4/3.9; F.4/3; F.4/2; F.4/1; D.8/2; D.8/1; B/0.9; B/2; B/3; D/3; D.9/3; D.9/3.9. Ok to place concrete in progress areas.
08/06/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
08/05/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
08/04/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #4;Shear walls #6; 7; 8 at GL: G-G.2/3-3.9; Shear walls #9; 10; 11 at GL: J/1-2; G/1-3. Columns at GL: G/4.4; G.9/4.4; F.7/2; I.3/3; I.3/3.9.

Ok to place concrete in progress areas.
08/03/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #1; Pour #1: Columns at GL:G.2/1; G.2/2; H.1/1; H.1/2; I.3/1; I.3/2; J.7/1; K/2; K/3.2; J/3.2; H.5/1; H./2. Shear wall #2 at GL: H.7-I.2/7.8; shear wall #4 at GL: I/5-6. OK to place concrete in progress areas.
07/31/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Post Tension Cable System at Level #4; Pour #1; at GL: G-K/0.9-9. Ok to place concrete in progress areas.
07/29/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled. Will reschedule for 30 July.
07/28/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level 3. Shear wall at line E-5 thru 6, shear wall line 8-B.9 thru E.7

Columns at F.5-8.8, F.5-8, F.5-7, E.7-6, E.7-7.5, D-5, B-5, B-4, A-6, D-6, C-8, A-8, A-9, D.5-9, E.5-9.
07/27/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #3 Pour #2: Shear walls: #5 at GL: F/3-3.9; #12 at GL: E.6/1-2. Columns at GL: F.2/4.4; F.4/3.9; F.4/3; F.4/2; F.4/1; D.8/2; B/1; D.8/1; B/2; D/3; D.9/3.9; D.9/3; D/4; B/4
07/23/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #3; Shear walls #6; 7; 8 at GL:G-G.2/3-4; Shear Walls #9; 10; 11 at GL: G.6-H/3-4. Columns at GL: G.9/4.4; G/4.4; F.7/2. Ok to place concrete in progress areas.
07/22/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #3; Shear wall #13 at GL: J/1-2. Columns at GL: I.2/3; J/3.2; K/3.2; K/2; J.7/1; I.3/2; H.5/1; H.5/2; H.1/2; H.1/1; G.2/1; G.2/2; I.3/1;. Ok to place concrete in progress areas.
07/21/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #3; Columns at GL: H.7/9; I.7/9; G.6/9; K/9; K/7.8; J/7.8; K/5.6; J5.6; J/5.6: J/5.6; G.6/8; G.6/7; H/5.6; J/4.2; J.7/4.2; I.2/3.9. Shear wall #4 at GL:I/5-6; Shear wall #2 at Gl: H.7-I.2/8
07/20/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #3; Post Tension Cable system at GL: F.9-K/0.9-4. Ok to place concrete in progress areas.
07/17/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #2; columns T GL: B/2; D.8/3.9. Ok to place concrete in progress areas
07/14/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #2 columns at GL: F.4/3.9; F.4/3; F.4/2; F.4/1; F.7/2; D/3. Ok to place concrete in progress areas.
07/13/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Post tension cable system at Level #2; pour #242 at GL: A-G/3-3.9. Ok to place concrete in progress area. Columns at GL: F.7;2; E.7/1; G.9/4.4; G/4.4. Shear Walls #6; 7; 8 at GL: G-G.2/3-3.9. Shear walls #9; 10; 11 at GL: G.6-H/3-4. Ok to set forms and place concrete in progress areas.
07/10/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #2; Shear Walls at GL: #2 at I/8; #4 at I/5.6; #13 at J/1.2. Columns at GL: G.6/8; G.6/7; H/5.6; I.2/3.9; J/4.2; H.5/1; H.1/2; G.2/2; I.3/1; I./2; K/3.2; J/3.2; K/2; J.7/1; H.5/2; H.1/1. Ok to place concrete in progress areas.
07/09/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #2 Columns at GL: K/9; I.7/9; H.7/9; G.6/9; J/7.8; K/7.8; J/5.2; K/5.2. Ok to place concrete in progress areas.
07/08/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
07/07/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
07/02/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
07/01/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled, will reschedule for 2 July.
06/30/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled will reschedule for 1 July.
06/29/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
06/26/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Will schedule for after hours inspection for 27 June at 0700.
06/25/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
06/24/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Mezzanine level #1: Shear wall #1 at GL: D.9-E.7/8. Ok to place concrete in progress area.
06/23/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Mezzanine Level columns at GL: B/.09; B/2. Ok to place concrete in progress areas
06/22/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Mezzanine level #1; Columns at GL: J/8; J/3.6; D/5; D.5/9; D.9/3; E.5/9; G.6/8; B/5
06/19/2020 STEM WALL/RETAINING WALL Cancelled Canceled by contractor
06/17/2020 STEM WALL/RETAINING WALL Partial Approval Partial. GarGe Level #2; Columns at GL: F.4/3; D.3/9. Ok to place concrete in progress areas.
06/16/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled
06/11/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Level #2 Garage; Shear wall #11 at GL: G.6/4.1. Columns at GL: G.6/6; H.9/5; G/5; G/4; . Ok to place concrete in progress areas.
06/10/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Garage Level #2; Shear wall #4 at GL: I/5-6. Columns at GL: H/1; I.3/1; H.7/9. Ok to place concrete in progress areas.
06/09/2020 STEM WALL/RETAINING WALL Partial Approval Partial. GarGe Level #2; Shear Walls #2 at GL; 8/I-H, #13 at GL: J/1-2..
Columns at GL: G.6/8; H/5-6; H.1/2; H.5/1; H.4/2; I.2/3.9; I.2/3; I.3/2; J.7/1. Ok to place concrete in progress areas.
06/08/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Garage Level #2 Columns at GL: K/9; K/7.8; J/7.8; J/5.6; K/5.6; J/4.2; J/3.2; K3.2; K/2; H.7/9; G.6/9. Ok to set forms and place concrete in progress areas.
06/03/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled. Shear walls and deck not ready, rescheduled for 4 June.
06/02/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready (VRI) Contractor cancelled.
06/01/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
05/29/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Garage Level #2; columns at GL: G.6/8.1; F.5/8.1; E.7/6
Ok to place concrete in progress areas.
05/26/2020 STEM WALL/RETAINING WALL Cancelled Not ready. Contractor canceled.
05/22/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
05/21/2020 STEM WALL/RETAINING WALL Partial Approval Partial (VRI) Garage Level #2; Shear walls #5 at GL,: F/3-4; Columns : 4 each C-2
Columns at GL: F.4/3; F.4/4; F.2/4; E.7/5. Ok to place concrete in progress areas.
05/20/2020 STEM WALL/RETAINING WALL Partial Approval Partial (VRI). Garage Level #2; Shear wall, #12 at GL: E.6/.9-2; Ramp will at GL. 6/I.2-E.7; Columns at GL: F.4/.9; F.7/1; F.4/2; F.7/2. Ok to place concrete in progress areas
05/19/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Garage Level #2; Shear wall #1 at GL: 8/E-E.7; Shear wall #3/5-6. Columns at GL: F.2/4; B/1; B/2; D.8/2; F.5/6; F.5/5. Exterior perimeter wall at GL: 9/D.5-E.7. Ok to place concrete in progress areas.
05/18/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Garage Level #1; shear wall #13 at GL: J/.9-2. Columns at GL: 3.9/F.4; J/5.6; D/6; D/3; D.9/3,9; D/5; D.8/2; D.9/3; B/4. Ok to place concrete in progress areas.
05/15/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Garage Level #1: Columns: C-5 at G/4; C-4 at J.7/4.2. Shear wall #2 at H.7-I.2/8. Ok tp place concrete in progress areas.
05/06/2020 STEM WALL/RETAINING WALL Partial Approval Partial. New sump pump wall added via an RFI; at GL: 8.1/D.9-E.5; #4 rebar at 12” on center. Ok to place concrete in progress areas.
05/05/2020 STEM WALL/RETAINING WALL Not ready for Inspection Not ready. Contractor cancelled.
05/04/2020 STEM WALL/RETAINING WALL Not ready for Inspection RVI Not ready. Contractor cancelled.
05/01/2020 STEM WALL/RETAINING WALL Not ready for Inspection RVI Not ready. Contractor cancelled.
04/30/2020 STEM WALL/RETAINING WALL Partial Approval Partial. Shear wall ((North) at GL: A/8-9. Ok to place concrete in progress area.
04/28/2020 STEM WALL/RETAINING WALL Partial Approval Sump drain walls at 4’ at GL: D-D.8/1-2. Column footings at GL: D.8/3; D/4.1; D/5. Ok to place concrete in progress areas.
04/02/2020 STEM WALL/RETAINING WALL Partial Approval Stem wall at crane area, GL: 5-6/G-G.6. Ok to place concrete in progress areas.

RVI
01/31/2020 STEM WALL/RETAINING WALL Partial Approval Proceeding with first installation of auger nails at East wall southside.
01/30/2020 STEM WALL/RETAINING WALL Partial Approval Proceeding with shock Crete
01/27/2020 STEM WALL/RETAINING WALL Partial Approval Subgrade I-beam column number 114 OK
01/24/2020 STEM WALL/RETAINING WALL Partial Approval Subgrade I-beam columns 106, 108, 110 OK.
01/23/2020 STEM WALL/RETAINING WALL Partial Approval Subgrade I-beam column 102, 104, 106 OK
01/22/2020 STEM WALL/RETAINING WALL Partial Approval Subgrade I-beam columns 96 and 98 OK.
01/21/2020 STEM WALL/RETAINING WALL Partial Approval Caissons and I-beam columns 97, 99, 101, 103, 105, 107, 109, 111, 113, 115 OK.
01/17/2020 STEM WALL/RETAINING WALL Not ready for Inspection
01/16/2020 STEM WALL/RETAINING WALL Partial Approval Caisons 122, 120, 118 ok to pour
01/15/2020 STEM WALL/RETAINING WALL Partial Approval West shoring wall caissons 124 and 126 ok.
01/14/2020 STEM WALL/RETAINING WALL Partial Approval Caissons P130, P132, P134, P136 ok
01/10/2020 STEM WALL/RETAINING WALL Partial Approval West wall temporary shoring (caisson footings and cages); 4:caisson footings and cages; #19-25:
01/09/2020 STEM WALL/RETAINING WALL Partial Approval Retaining West wall; 7 each 45’ caisson footings and cages at GL: 9/A-F.5. Ok to place concrete in progress areas.
01/08/2020 STEM WALL/RETAINING WALL Partial Approval Information only. Site walk through..