Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/16/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
close permit per fred and tsmr - |
| 03/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pete and i went out and looked at the ramps they poured on 3/8/18 for the south driveway. we found some issues with workman ship and %. we called matt and he was unavailble right away so we meet back out onsite at 10:00am and walked the whole job. matt wanted to have the header curb removed due to multiple locatations being damaged - CN |
| 02/20/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
campbell (atlas) pete asked me to go and check to see if they had done any work on site since the last time i checked. everything was still unfinshed - pete was informed - CN |
| 01/10/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
had a meeting with myself , pete , jay and riley to go over the driveway slope issue that had been brought to bakers attention 2 months ago, where they were informed that the approach slope would be over the 10% which is required per the detail, riley will try and submitt for a variance for the front approach from the engineer - 8am to 1030am |
| 01/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and double checked the repour with items that were removed for being out of spec 4 areas were still out of spec and jay will have them do it again - CN |