Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T18CM09798

Parcel: 11310001A


Addresses:

1545 E COPPER ST


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T18CM09798

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
02/25/2021 EXCAVATION/LAYOUT REBAR & ZON Approved APPROVED
07/27/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Planter footings at southwest corner of gallery, room 101.
09/11/2019 EXCAVATION/LAYOUT REBAR & ZON Approved
08/27/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Footings on east side of theater wall.
08/15/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval South and west stems for cfta ok to pour.
08/13/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval South - east to west footing , from middle n to s door, west and north to existing gym south wall ok to pour.
Footings against original south wall, dowelled, ok to pour.
08/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 2 north center spread footings and footing along existing theater wall ok to pour.
08/01/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Addition - column footings on East side. Ok to place concrete when dry.
07/29/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4 northwest column footing.
07/25/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4 North canopy f-2 footings ok to pour
07/22/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Column South end.
07/19/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Six footings for columns on east side. See plans S2.0 highlighted areas.
07/18/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Work not complete enough to inspect
07/10/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection no new work
07/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Footings (F2), approximately 68', Detail #103. Column footings (7) C2-F2, column C1-F2 exterior cmu walls, detail #109. Stem wall footing at slab mid point, approximately 58'. Ok to place concrete in progress areas.
07/03/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Linear footing at SouthEast corner.
07/02/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval North and east side footings.
06/07/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement provided in footings for (4) F4 columns located in the existing Dance Hall only.
05/24/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement provided in the footing for the relocated column in the Theater is okay for concrete.