Permit: T17RW04592

Parcel: 14026011A


Addresses:

6393 S CAMPBELL AV


Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Permit Number - T17RW04592

Inspection Description - TDOT-EXCAV GENERAL INSPECTION

Inspection Status - Approved

Date Description Inspector Results Comments
05/17/2018 TDOT-EXCAV GENERAL INSPECTION Approved close permit per fred and the tsmr
03/09/2018 TDOT-EXCAV GENERAL INSPECTION Continued pete and i went out and looked at the ramps they poured on 3/8/18 for the south driveway. we found some issues with workman ship and %. we called matt and he was unavailble right away so we meet back out onsite at 10:00am and walked the whole job. matt wanted to have the header curb removed due to multiple locatations being damaged - CN
02/20/2018 TDOT-EXCAV GENERAL INSPECTION Continued campbell (atlas) pete asked me to go and check to see if they had done any work on site since the last time i checked. everything was still unfinshed - pete was informed - CN
01/31/2018 TDOT-EXCAV GENERAL INSPECTION Continued - Meet with another baker forman as jay wasnt available. We talked about the driveway on the south side of the project and middle driveway being out of spec and options to fix it that were talked about before the curb and ramps were poured. He understood and said that he would get it fixed. Riley called me and said i was harassing them, i simply told him that i was following spec. he continued to try and argue with me and i hung up on him told both matt and pete - CN
01/10/2018 TDOT-EXCAV GENERAL INSPECTION Continued had a meeting with myself , pete , jay and riley to go over the driveway slope issue that had been brought to bakers attention 2 months ago, where they were informed that the approach slope would be over the 10% which is required per the detail, riley will try and submitt for a variance for the front approach from the engineer - 8am to 1030am
01/09/2018 TDOT-EXCAV GENERAL INSPECTION Continued went out and double checked the repour with items that were removed for being out of spec 4 areas were still out of spec and jay will have them do it again - CN
12/27/2017 TDOT-EXCAV GENERAL INSPECTION Continued removing area's of ramps/sidewalk that were out of spec. sent jay a text on renewing the permit as it was expired - CN
12/19/2017 TDOT-EXCAV GENERAL INSPECTION Continued went over 5 locations that were out of spec on the ramps and landing with jay so that he could get his sub to replace/fix them - CN
12/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued pete and i went out and found a few issues with the ramps that were poured. i called and let jey know he said that he would get with me next week once he got back to go over the issues - CN
12/11/2017 TDOT-EXCAV GENERAL INSPECTION Continued pete and i meet onsite to see how the ramp/curb pour went and see if they followed pete's directions. pete approved of what was poured.
12/08/2017 TDOT-EXCAV GENERAL INSPECTION Continued pete and i went out and looked at the forms for the curb/ramp opening - CN
12/05/2017 TDOT-EXCAV GENERAL INSPECTION Continued went out and looked at the curb they poured yesterday, told jay the finish was rough and that they didnt install the expansion. i called pete out to look at it and we went over what needed to be removed and replaced. jay later called me and said that they removed it all - cn
11/30/2017 TDOT-EXCAV GENERAL INSPECTION Continued - Met with jay and blanco owner and showed them how to lay the ramps out correctly - CN
11/29/2017 TDOT-EXCAV GENERAL INSPECTION Continued - went out and checked the curb cuts for the ramps, they were wrong told jay - CN
11/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued went out and told them the ramp openings they poured on wednesday were wrong and needed to be fixed - CN
11/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued - stopped by to check curb forms ramp opening wasnt at 2% and the wing was only 4ft
11/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued went over details for the ramp and curb for the concrete crew, pour curb at 1pm
11/08/2017 TDOT-EXCAV GENERAL INSPECTION Continued forming curb and planned to pour but curb subgrade wasnt compacted. i contacted jay and told him it needed to recompacted he said that he would get it done and have me back out for a reinspection
11/08/2017 TDOT-EXCAV GENERAL INSPECTION Continued - went back out and checked the curb sg a small 10ft area needs to be reworked again, jay was informed once they fix that area - cn
11/07/2017 TDOT-EXCAV GENERAL INSPECTION Continued Jay with Barker, scheduled inspection in A.M. for curb returns. Wasnt ready, waiting for contractor to compact and density tests by Terracon.
10/25/2017 TDOT-EXCAV GENERAL INSPECTION Continued precon at 8am no one was there went back by at 9am and it was the same thing i got a call at 9:30 asking me to come by
for the precon.
10/20/2017 TDOT-EXCAV GENERAL INSPECTION Continued - no work going on - CN