Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/17/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Final. No Issues. |
| 04/11/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pouring Driveway Apron for Chase Bank. Slopes ok. 6" 3000psi. Asphalt patch to follow. 4/13 |
| 04/07/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Driveway location is in conflict with existing fire hydrant. Met with RDI, Marcos Torres, and Gabe Rascon to discuss remedy. Will meet with Tucson Water on 4/7 to discuss location of FH. |
| 04/07/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Work complete on Park. Curb and Gutter poured on 1st st. Will return for form check on SW 4/10. |