Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2019 | FIRE - FINAL | Approved | ||
| 04/02/2019 | FIRE - FINAL | Partial Approval | 1. Need to test new Alarm Permit. | |
| 03/04/2019 | FIRE - FINAL | Denied | Need to have the address posted 12" letters on the southside of the building reading 145 S 6th Av. Need to have the 145 posted on the exterior of the building on the west side 12" letter, Paint above the doors does not count. Need to keep 3' of clearance around the FDC and add a FDC Sign Need to add a KNOX key switch for the gate. Need to final out the fire alarm system and other open permits for this project. Pay-reisnpection fees prior to calling fire back out. |
|
| 03/01/2019 | FIRE - FINAL | Denied | nobody on site. no message. reinspection fee added to permit. shall be paid prior to final. |
|
| 02/25/2019 | FIRE - FINAL | Denied | 1. See Alarm Notes. 2. Need to install new Fire Extinguishers or Service existing ones. |