Permit: T17CM00366

Parcel: 11720015A


Addresses:

111 S CHURCH AV


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T17CM00366

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
04/03/2018 EXCAVATION/LAYOUT REBAR & ZON Approved
11/28/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval level 6 columns,stemwalls ok
11/27/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection cancelled
11/22/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval level 6 ok to pour
11/14/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval level 5, shearwalls 6&7 ok, columns ok
11/09/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1005 5TH FLOOR, NORTH END
11/07/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval lower level raised curbs and misc. ok, 5th floor PT ok
11/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4th level ok
10/26/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1005 REBAR 4TH FLOOR SOUTH SIDE AND 2 SHEER WALLS
10/25/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4th level deck ok, columns north end ok
10/24/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection cancelled
10/17/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 3rd level walls ok
10/16/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 3rd level ok except elevator and stairwell
10/13/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 3rd level columns CL-6 south
10/12/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 3rd level ok to pour
10/11/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection cancelled
10/03/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 2nd level elevators walls ok
10/02/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval level 2 shear walls 7,6 ok
all 2nd level columns ok
09/28/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval level 2 ok to pour slab pending special inspection report
after hours inspection
08/31/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval retaining wall along east side ok to grout up to bond beam
08/22/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval pedistals at south stairwell west wall ok
08/21/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval retaining walls , south wall south stairwell
08/18/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval columns 1st level H/10 , I/10 , B.5/3
retaining wall west of elevator
N.W. cmu stem ok, S.E. wing retaining wall ok
08/17/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level footers H/10 , I/10 , C/3 , S.E. corner wallok
1st level shear wall 7 (CL 6/H thru I)
08/16/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level columns H/8 , I/8 ,
footers N.W. and north 1st level walls
08/14/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- 1st level N.E. corner wall
2- east stairwall retaining wall ok
08/11/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection cancelled
08/10/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval benches at C.L. F/7 , F/8 ok
spread footer H/6 , I/6 , H/7 , I/7 ok
08/10/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval southwest retaining wall ok
columns H/6 , H/7 , I/6 , I/7 , ok 1st level
08/09/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection no work
08/07/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval west planter at north end ok
08/04/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level shear wall 6 ok
North west bench ok
stem wall 5/F.G , pedistal 1.3/A.3 ok
08/03/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval planters at C.L. 1 ok
08/02/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level columns- G/10 , F/10 , E/1 ok
08/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level footers F/10 , G/10 ok
1st level columns F/8 , G/8 , ok
1st level shear walls 1 , 2 ok
07/31/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level shear walls 4 , 5 , 3 , ok
1st level columns B/1 , G/7 , F/7 , G/6 , F/6 ok
07/28/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level columns A/1.8 , A/2 , F/5 , G/5 0k
07/27/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level columns- D/2 , D/3 , C/2 , C/3 ok
1st level footers- F and G/9 , shear wall 9 , seating wall F/9
07/26/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1st level- E/4 , E/3 , D/4 , A/1 , B/1 , C/1 , D/1 , ok
footers- D/2 , D/3 , F/6 , F/7 , F/8 , G/6 , G/7 , G/8 , C/2 , C/3 , A/1.8 , A/2 ok
07/25/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection bars not tied tight/scured through out
07/21/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- elevator pit walls ok
2- footers-A/1 , B/1 , C/1 , D/1 , E/1 , A.4/1.4 ok
07/19/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval footers- E/4 , D/4 , E/3 , elevator and N.E, stairwell ok