Permit: T16CM09380

Parcel: 12404097C


Addresses:

950 N TYNDALL AV


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T16CM09380

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
09/23/2019 EXCAVATION/LAYOUT REBAR & ZON Approved Refer to permit T17CM00004.
10/31/2017 EXCAVATION/LAYOUT REBAR & ZON Cancelled
10/27/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SHOTCRETE SHORING IS COMPLETE! FOOTING FOR TOWER CRANE WILL BE READY TO POUR 10/28/17 7:00 AM. PROVIDE SPECIAL INSPECTION REPORTS.
10/26/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SHOTCRETE ONGOING
10/25/2017 EXCAVATION/LAYOUT REBAR & ZON Cancelled
10/24/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval RAMP RELOCATED TO NW CORNER. NORTH WALL FROM 11 TO 18 READY FOR SHOTCRETE TO SECOND LEVEL. EAST SIDE FROM 19 TO 24 OK TO SHOTCRETE TO THIRD LEVEL
10/13/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval INFORMATION ONLY. WILL RESCHEDULE FOR 16 OCTOBER.
10/12/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval on going soils nail on west side.
10/11/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval BOTTOM OF SITE WEST SIDE, AND WEST 1/2 OF NORTH AND SOUTH. NAILING AND EXCAVATION ONGOING ON EAST SIDE.
10/09/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING OF SOIL NAILS AND EXCAVATION CONTINUING
10/05/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval progress on soils nails on going, equipment failure on this date.
10/04/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval progress on soils nails on going.
10/03/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval progress on soils nails
10/02/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/29/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval On going soils nails on south side.
09/28/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOIL NAILS AT SOUTH EASTCORNER AT TRANSFORMER.
09/27/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval STARTING PROOF TEST ON EAST SIDE. SECOND COURSE OF SHOTCRETE ON WEST SIDE, FINAL SOIL NAILS ON NORTH AND NORTHWEST AREAS.
09/26/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOAD PROOFING WEST SIDE CONTINUES. SOIL NAILING SOUTHEAST CORNER STARTING, SHOTCRETE PREP ON SOUTHWEST AREA ONGOING.
09/25/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOAD PROOFING WEST SIDE ONGOING
09/22/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOIL NAILING ON NORTH SIDE IS ONGOING.
NAIL PROOFING IS ONGOING ON WEST SIDE.
SHOTCRETE AT SOUTHWEST CORNER IS DONE.
09/20/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOUTHWEST CORNER READY FOR SHOTCRETE, WEST SIDE READY FOR LOAD TESTING.
09/19/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PREPARING FOR PROOF TESTING OF SOIL NAILS ON WEST SIDE OF SITE. PREPARING TO PLACE SOIL NAILS AT SOUTHEAST CORNER OF PROPERTY.
09/18/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOIL NAILING AND SHOTCRETE CONTINUING.
09/13/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SETTING UP FOR PROOF TESTING WEST SIDE. EXCAVATING NORTH SIDE FOR SECOND LIFT OF SHOTCRETE.
09/12/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOIL NAILING AND SHOTCRETE CONTINUE ON WEST AND NORTH SIDE.
09/11/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SHOTCRETE ON NORTH END ONGOING. SOIL NAILS STOPPED, PUMP IS DEAD.
09/08/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOIL NAILING ONGOING ON EAST SIDE OF SITE.
09/07/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SHOT-CREAT ON EAST AND NORTH END OK TO SHOOT
09/05/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOIL NAILING COMPLETE ON WEST SIDE UPPER ROW.
09/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOIL NAILING ON WEST SIDE IS ONGOING.
08/30/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4 SOILS NAILS ON WEST SIDE NORTH TO SOUTH
08/22/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval WEST SIDE READY FOR SOIL NAILS AND GUNITE.
08/15/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval WEST SIDE OF PROPERTY PILES 1 AND 89 READY TO SET BEAM AND SLURRY
08/11/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval soldier piles #5, #7, #10, #11, and #12 ok
08/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOLDIER PILES ON WEST SIDE OF PROPERTY ARE INSTALLED EXCEPT #79 AND #89. CONFIRMATION OF LOCATION FOR #89 AND #1 IS PENDING. SOUTHERN AREA OF TIGHTER SPACING IS OFF PLAN BY 2'. WILL REQUIRE APPROVAL BY EOR.