Inspection Status: Approved
Inspection History: PLUMBING - ROOF DRAINS
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2019 |
PLUMBING - ROOF DRAINS |
|
Approved |
|
| 07/20/2018 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
HYDRONIC TESTING OF SECONDARY DARAINS FROM ROOF TO LEVEL #1. |
| 06/15/2018 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
LEVEL #1, TRAUMA AREA: OVER FLOW LINES FROM ROOF DRAINS AT 6"- 12". |
| 12/05/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
ROOF DRAIN LINES IN THE AMBULANCE CORRIDOR AND THE FUTURE TRAUMA AREA (6" - 8" LINES). |
| 06/19/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
STORM DRAINS IN SHAFT #9, 12' LINE AT LEVELS 4 - 2. |
| 06/16/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
12" PRIMARY AND OVERFLOW HORIZONTALS ON LEVEL 2 TEST APPROVED. 12" IN SHAFT 9 NOT READY |
| 06/15/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
6" ROOF DRAIN LEVEL 4 TO 2 AREAS 6 AND 3 TESTED OK. |
| 06/13/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
PRIMARY AND OVER-FLOW DRAINS AT LEVELS 4 - 1; ZONES 1, 2, 3. OVER-FLOW DRAINS AT LEVELS; ZONES 1, 2, 3. |
| 06/12/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
PRIMARY AND OVER-FLOW STORM DRAINS IN ZONES 1 AND 2; LEVEL #4 - 1. AREA #3 IS NOT READY FOR INSPECTION. |
| 06/09/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
STORM DRAIN (OVER-FLOW) AT AREA 3, LEVELS 4 - 2. |
| 06/08/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
ROOF DRAINS AT LEVELS 10 - 4, SHAFT #14; PRIMARY AND OVER -FLOW DRAINS. RISERS AT LEVELS 3 - 1 (2 EACH 10" LINES) IN ZONES #5 AND #7. |
| 06/02/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
OVER FLOW DRAINS IN AREAS #8 - 10 FROM LEVELS 5 - 4 |
| 04/21/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
PRIMARY AND OVER-FLOW STORM DRAINS AT GL: B/9; LEVELS 10 - 4. |
| 04/17/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
OVER FLOW DRAINS (2) AT LEVERL 5 - 2 (SW). SHAFT #6, 12" RISERS. |
| 04/12/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
2 ROOF DRAINS AT LEVEL #4; GL: 6/I.5 - WATER TESTED. |
| 03/06/2017 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
PENTHOUSE (HIGH ROOF) |
| 02/09/2017 |
PLUMBING - ROOF DRAINS |
|
Not ready for Inspection |
WILL RESCHEDULE FOR 10 FEBRUARY |