Permit: T16CM02176

Parcel: 12310001H


Addresses:

1625 N CAMPBELL AV

Inspection Status: Approved

Inspection History: PLUMBING - ROOF DRAINS

Date Description Inspector Results Comments
02/07/2019 PLUMBING - ROOF DRAINS Approved
07/20/2018 PLUMBING - ROOF DRAINS Partial Approval HYDRONIC TESTING OF SECONDARY DARAINS FROM ROOF TO LEVEL #1.
06/15/2018 PLUMBING - ROOF DRAINS Partial Approval LEVEL #1, TRAUMA AREA: OVER FLOW LINES FROM ROOF DRAINS AT 6"- 12".
12/05/2017 PLUMBING - ROOF DRAINS Partial Approval ROOF DRAIN LINES IN THE AMBULANCE CORRIDOR AND THE FUTURE TRAUMA AREA (6" - 8" LINES).
06/19/2017 PLUMBING - ROOF DRAINS Partial Approval STORM DRAINS IN SHAFT #9, 12' LINE AT LEVELS 4 - 2.
06/16/2017 PLUMBING - ROOF DRAINS Partial Approval 12" PRIMARY AND OVERFLOW HORIZONTALS ON LEVEL 2 TEST APPROVED. 12" IN SHAFT 9 NOT READY
06/15/2017 PLUMBING - ROOF DRAINS Partial Approval 6" ROOF DRAIN LEVEL 4 TO 2 AREAS 6 AND 3 TESTED OK.
06/13/2017 PLUMBING - ROOF DRAINS Partial Approval PRIMARY AND OVER-FLOW DRAINS AT LEVELS 4 - 1; ZONES 1, 2, 3. OVER-FLOW DRAINS AT LEVELS; ZONES 1, 2, 3.
06/12/2017 PLUMBING - ROOF DRAINS Partial Approval PRIMARY AND OVER-FLOW STORM DRAINS IN ZONES 1 AND 2; LEVEL #4 - 1. AREA #3 IS NOT READY FOR INSPECTION.
06/09/2017 PLUMBING - ROOF DRAINS Partial Approval STORM DRAIN (OVER-FLOW) AT AREA 3, LEVELS 4 - 2.
06/08/2017 PLUMBING - ROOF DRAINS Partial Approval ROOF DRAINS AT LEVELS 10 - 4, SHAFT #14; PRIMARY AND OVER -FLOW DRAINS. RISERS AT LEVELS 3 - 1 (2 EACH 10" LINES) IN ZONES #5 AND #7.
06/02/2017 PLUMBING - ROOF DRAINS Partial Approval OVER FLOW DRAINS IN AREAS #8 - 10 FROM LEVELS 5 - 4
04/21/2017 PLUMBING - ROOF DRAINS Partial Approval PRIMARY AND OVER-FLOW STORM DRAINS AT GL: B/9; LEVELS 10 - 4.
04/17/2017 PLUMBING - ROOF DRAINS Partial Approval OVER FLOW DRAINS (2) AT LEVERL 5 - 2 (SW). SHAFT #6, 12" RISERS.
04/12/2017 PLUMBING - ROOF DRAINS Partial Approval 2 ROOF DRAINS AT LEVEL #4; GL: 6/I.5 - WATER TESTED.
03/06/2017 PLUMBING - ROOF DRAINS Partial Approval PENTHOUSE (HIGH ROOF)
02/09/2017 PLUMBING - ROOF DRAINS Not ready for Inspection WILL RESCHEDULE FOR 10 FEBRUARY