Permit: T16CM02176

Parcel: 12310001H


Addresses:

1625 N CAMPBELL AV

Inspection Status: Approved

Inspection History: PLUMBING - ABOVE CEILING

Date Description Inspector Results Comments
02/25/2019 PLUMBING - ABOVE CEILING Approved
01/11/2019 PLUMBING - ABOVE CEILING Partial Approval Level #4; Blood Bank : Domestic Hot/Cold water lines (1/2" - 3/4"). Ok to insulate progress areas.
08/29/2018 PLUMBING - ABOVE CEILING Partial Approval LEVEL #1, PHARMACY AREA: HEATED HOT WATER LINES; CHILLED BEAM WATER LINES; INSULATED AND SECURED.
02/23/2018 PLUMBING - ABOVE CEILING Partial Approval LEVEL #1, KITCHEN AREA: DOMESTIC HOT/COLD WATER LINES (1/2" - 3") TESTED AT 160 PSI. LEVEL #1 GL: H/10, WASTE AND VENT LINES AT (2" - 4") UNDER HYDRONIC TEST.
01/09/2018 PLUMBING - ABOVE CEILING Partial Approval LEVEL #2, AREAS #4 - 5; WASTE AND VENT LINES AT 1 1/2" - 4".
01/05/2018 PLUMBING - ABOVE CEILING Partial Approval DOMESTIC HOT AND COL WATER LINES AT 3/4" - 3". LEVEL #2, AREAS 1 - 6, ALL TESTED AT 160 psi (SUPPLY AND RETURN LINES.)
12/29/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #3, AREAS #7 - 10; DOMESTIC HOT AND COLD LINES (SUPPLY ONLY), LINES AT 1/2" T0 6", SHAFT #7, LEVEL #3 DOWN TO LEVEL #1. ALL LINES TESTED AT 150 PSI. OK T O
INSULATE PROGRESS AREAS.
12/28/2017 PLUMBING - ABOVE CEILING Partial Approval LEVELS #3 - 4, CENTE SECTIONS: WASTE AND VENT LINES (2" - 4"), 10 FLOOR DRAINS AT 4".
12/27/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #4, TOWER #4; HEATED HOT WATER LINES (1" - 2"), SUPPLY AND RETURN DOWN TO LEVEL #1 AT SHAFT #7 TO GL: 10/J - L
12/18/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #8, TOWER #4, 1/2" - 4" LINES -TESTED AT 160 psi. LEVEL #3, AREAS 3, 6, 8,: WASTE AND VENT LINES (2" - 4" LINES). LEVEL #2, PCW LINES, SUPPLY AND RETURN (3" LINES) FROM SHAFT #3; 4" CHILLED WATER LINES; 2 1/2" HEATED HOT WATER LINES (SUPPLY AND RETURN LINES). SOUTH AREA, GL: L - M/4.2 - 12: 6" HEATED HOT WATER - SUPPLY AND RETURN LINES; 1 1/2" CHILLED WATER, SUPPLY AND RETURN.
12/06/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #1, AREA #6: 12" ROOF DRAIN LINE. OK TO DROP HYDRO TEST.
12/01/2017 PLUMBING - ABOVE CEILING Partial Approval LEVE #7, TOWER #4: WASTE AND VENT LINES (2" - 4"); BATHROOMS IN ROOMS #1, 2, 23, 24. DOMESTIC WATER LIES (3/4" - 2"): HOT, COLD, HOT RETURN: LEVEL #3, AREAS 4, 5, 7, 8.
11/29/2017 PLUMBING - ABOVE CEILING Partial Approval AMULANCE CORRIDOR ON LEVEL #1: DOMESTIC WATER LINES (1" - 3").
10/24/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #3, AREAS #1 - 6; HOT AND COLD SUPPLY AND RETURN LINES: 1" - 3" LINES THROUGHOUT.
09/19/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #5, TOWER #4; DOMESTIC WATER LINES (1/2" - 4") - ALL LINES TESTED AT 150psi.
09/08/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #5, AREA #10, WASTE AND VENT LINES (2" - 4") FROM LEVEL #4 TO LEVEL #5.
09/01/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #4, TOWER #4; DOMESTIC WATEER LINES TOWERS 4 - 5 (1/2" -4"). LEVEL #5, TOWER #4: MIDDLE SECTION, WASTE AND VENT LINES (2" - 6").
08/03/2017 PLUMBING - ABOVE CEILING Partial Approval DOMESTIC WATER LINES; LEVEL #6, TOWER 5; (1/2" - 3")LINES: TESTED AT 101 psi.
08/02/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #6, TOWER #4; AREAS 4, 5, 6 - HEATED HOT WATER LINES TESTED AT 150psi (3/4" - 2" LINES)
07/20/2017 PLUMBING - ABOVE CEILING Partial Approval NORTH TOWER LEVEL #9; CHILLED BEAM LINES (2" - 3"); HEATED HOT WATER LINES (1 1/2" - 3") OK TO INSULATE PROGRESS AREAS. LEVEL #7, VENT LINES (2 1/2", PATIENT ROOMS #4 - 12.
07/18/2017 PLUMBING - ABOVE CEILING Partial Approval HEATING HOT WATER LINES AND HILLED BEAM LINES (1" - 3") IN AREAS 1 - 2, SHAFT #10
07/11/2017 PLUMBING - ABOVE CEILING Partial Approval DOMESTIC WATER LINES (HOT AND COLD) IN LABOR AND DELIVERY ROOM #2 (1/2" - 2"). LINES TESTED AT 100 psi.
07/10/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #6, TOWER #5; MEDICAL GAS LINES TESTED AT 150 psi.
06/27/2017 PLUMBING - ABOVE CEILING Partial Approval LEVEL #5, TOWER #5 (DOMESTIC WATER LINES): 1/2" - 2 1/2". LEVEL #6, TOWER #5; CHILLED BEAM LINES (SUPPLY AND RETURN); HEATING HOT WATER LINES (SUPPLY AND RETURN): ALL LINES TESTED AT 150 psi (3/4" - 3" LINES).