| 02/25/2019 |
ELECTRIC - ABOVE CEILING |
|
Approved |
|
| 10/17/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
Level #2, CATH corridor, canned lighting and "J" boxes |
| 10/05/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
Level #2, CATH Labs #1 & #2 - ceilings. Ok to sheetrock progress areas. |
| 10/04/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
level 5, Knuckle Area restrooms - lighting in place |
| 09/26/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
Public restrooms in Knuckle areas of Levels #6, 7, 9; ensure all penetrations are patched and fire caulked. |
| 09/20/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #1, PATIENT PHARMACY, LIGHTS AND "J"BOXES. FIRE CAULKED PENETRATIONS |
| 08/17/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #9, QUIET ROOM LIGNTING FIXTURES IN PLACE. |
| 08/14/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #3, AREA #4 (SW) CORRIDORS. AREAS ARE OK. |
| 07/26/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #7, QUITE ROOM - LIGHTING. OK TO COVER CEILING. LEVEL #9, PUBLIC RESTROOMS - HARD LID CEILINGS (CIMPLETE PENETRATION CAULKING). OK TO COVER CEILINGS. EILINGS. |
| 07/23/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #6, QUIET ROOM - CEILING LIGHTING. OK TO COVER CEILINGS. |
| 06/26/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #5, KNUCKLE AREA: QUIET ROOM, ELEVATOR AREA, CORRIDORS, STAFF SLEEPING ROOMS. |
| 06/22/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #3, OPERATING ROOMS #18 AND #21. |
| 06/07/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #3, TOWER #4, AREAS #2 AND #3; COMPLETE ABOVE CEILING IN SUBJECT AREAS. |
| 06/05/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LOADING DOCK CANOPY - 44 CANNED LIGHTS IN PLACE, FED BY 2 PANELS. OK TO COVER PROGRESS AREA. |
| 05/15/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #3, PACU, PRE-POST, PEDS: AREA IS OK. |
| 03/19/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #3, LOCKER/SHOWERS, BATHROOMS (HARD LIDS). OPERATING ROOMS #10, 11, 12, 16, 17 - LIGHTING IN PLACE. |
| 03/08/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
OPERATING ROOMS #2 - 8; SCRUB SINK AREAS IN HALLWAYS. |
| 03/05/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #2, AREAS #1 AND #2: 6 BATHROOM CEILINGS AND 1 JANITOR AREA CEILING (LIGHTING) |
| 02/21/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
POWER LINES ABOVE CEILING IN KITCHEN AREAS AT GL: G - F/3 - 7; POT SCRUB AREA #150326. |
| 02/07/2018 |
ELECTRIC - ABOVE CEILING |
|
Not ready for Inspection |
LEVEL #5, AREA #7: FOREMAN CANCELLED - WORK INCOMPLETE. |
| 01/30/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #8, TOWER #4, PATIENT RESTROOMS CEILINGS - CANNED LIGHT SYSTEM IN PATIENT BATHROOMS #3 - 24. |
| 01/16/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #3, OR #1 OVER HEAD LIGHTING. |
| 01/10/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
CANNED LIGHTING SYSTEM ON LEVEL #8, TOWER #5; LEVEL #9, TOWEER #5: ISO ROOMS AND CENTER ROOMS. |
| 01/09/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #3, ON-CALL RESTROOM CEILINGS (5 EACH); CANNED LIGHTS IN PLACE. |
| 12/27/2017 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
TRAUMA CORRIDOR; CONDUITS AND J BOXES - AWAITING LIGHTING |
| 11/28/2017 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #6, TOWER #5, REMAINING HARD LIDS (2) - OK TO SHEETROCK. |
| 10/09/2017 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #5, TOWER #4, LDR ROOMS #1 - 12, MENS LOCKER ROOM, RIAGE ROOMS #2 AND #4. |
| 09/08/2017 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #6, TOWER #5, PATIENT ROOMS (BATHROOMS): CANNED LIGHTING SYSTEM INSTALLED. NORTH AND SOUTH WINGS. |
| 05/23/2017 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #5, MOCK-UP ROOMS #10 &11 (CAN LIGHTING). OK TO COVER CEILINGS. |
| 05/19/2017 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
CONDUITS IN MAIN ELECTRIC ROOM: 5" RIDGID JUMPERS ARE COMPLETE; CONDUITS (3" - 4") TO PANELS: 4ND1A-D1, 4NBAL-D1, 4NBBL1, 4NAAH-S2, 4NAA-H1; ATS #32, 34, 35. |
| 12/28/2016 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
LEVEL #4 - 15 CONDUITS (3/4" TO 3 1/2") IN TWO RACKING SYSTEMS AT GL: 7/F - H |