Date Description Inspector Results Comments
02/25/2019 ELECTRIC - INTERMEDIATE Approved
12/10/2018 ELECTRIC - INTERMEDIATE Partial Approval Trans-vac room; disconnects, 7 blower motors (7 each 6" tubes); CSPD Room. disconnects to sterilizer units; kitchen repair shop.
11/07/2018 ELECTRIC - INTERMEDIATE Partial Approval Level 8, Knuckle Area public restrooms. Ok to cover walls.
10/17/2018 ELECTRIC - INTERMEDIATE Partial Approval Electric in-laws, Level #2, IR-2, RF-1, RF-2; lead shielding needs to be in place before insulating
09/26/2018 ELECTRIC - INTERMEDIATE Partial Approval Electric in-walls. IR #3; ok to insulate and sheetrock walls.
09/19/2018 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC AT LEVEL #2, EP1 - EP2 AND CONTROL ROOMS. OK TO COVER WALLS.
09/06/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, MRI ROOMS #1 AND #3. IN WALL ELECTRIC. OK TO COVER WALLS.
08/01/2018 ELECTRIC - INTERMEDIATE Partial Approval FIRE ALARM ROOM #802, PANEL #4SABL2; TRANSFORMER #T4SABL2. NORTH PUMP ROOM - PUMP EQUIPMENT ENERGIZED AND OPPERATIONAL; SOUTH PUMP ROOM, EQUIPMENT WIRED (NON-ENERGIZED). FIRE PUMP ROOM, PUMP WIRED/TESTED (TFD). ALL ROOMS ARE AT LEVEL #4.
07/31/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, CATH READING ROOM, CATH LOUNGE, CLEAN SUPPLY ROOM. OK TO INSULATE AND ONE SIDE SHEETROCK.
07/25/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, CATH LABS #1, 2, 3 - IN WALL ELECTRIC. OK TO COVER WALLS.
07/11/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, PHARMACY AREA (WEST AREA): ELECTRIC IN WALLS. OK TO INSULATE AND COVER WALLS.
07/05/2018 ELECTRIC - INTERMEDIATE Approved
07/05/2018 ELECTRIC - INTERMEDIATE Partial Approval IN-WALL ELECTRIC AT GL: C - F/10 - 13, H - I/7 - 10 (PHARMACY AREA). OK TO INSULATE AND COVER WALLS.
07/02/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4 - UPS ROOM (GEAR): TRANSFORMER #T-4UABL-1, SWITCH GEAR # 4VABL-S1; 4MBM1; 4MBM2; MAIN BY-PASS #UPSABH-1, BATTERY CABINETS #1-4; PANELS #4IAAH-S1, 4CAAH-S2.
07/02/2018 ELECTRIC - INTERMEDIATE Partial Approval
06/15/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, CT-1, ROOM #0250601, NORTH WALL; WOUTH CORRIDOR, EXTERIOR WALL AT GL: N/4-9. OK TO COVER PROGRESS AREAS.
06/01/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, TOWER #4, CT ROOMS #1, 2, 3: ON WALL ELECTRIC. OK TO COVER WALLS.
05/15/2018 ELECTRIC - INTERMEDIATE Partial Approval NORTHWEST DINNING AREA: IN WALL ELECTRIC AND SOFFIT CANNED LIGHTING: LEVEL #1.
05/10/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, KITCHEN/DINING AREA; OFFICES: IN-WALL ELECTRIC. OK TO COVER WALLS.
05/03/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #9, KNUCKLE AREA: IN WALL ELECTRIC; ROOMS, CORRIDORS, RESTROOOMS (HARD LIDS). OK TO COVER WALLS WHEN MECHANICAL AND PLUMBING HAVE BEEN COMPLETED.
04/24/2018 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC; AT LEVEL #3, CENTER SECTION - OK TO COVER WALLS WHEN PLUMBING INTERMEDIATE IS COMPLETE
04/18/2018 ELECTRIC - INTERMEDIATE Partial Approval STAIRWELL #4, LANDING LIGHTING AT LEVELS #1-9 AND FIRE ALARM OUTLETS (IN-WALL) IN LANDINGS AT LEVELS #1-9,
04/16/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #3, NORTH EAST KNUCKLE AREA (ON-CALL RESTROOMS OVER HEAD) - 7 BATHROOM CEILINGS.
04/13/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4, MAIN ELECTRIC ROOMS: SWITCH BOARDS: 4NBAL-S2, 4NBBL-S2; 4NAAH-S2; 4NAAH1; 4EAAH1; 4EAAH-D4: TRANSFORMERS AND DISCONNECTS: 3CABL-1; 3CAAL-1: PANELS: 4CABL1; ESS-4N
04/04/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVELS #5 AND 6; KNUCKLE AREA - RESTROOM HARD LIDS. LEVELS #7 AND #8 IN WALLS (KNUCKLE AREA). LEVEL #9 - QUIET ROOM IN WALLS.
04/03/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #3, OR'S #19, 21; EQUIPMENT SUPPORT ROOM; PROCEDURE ROOMS "A" AND "B" AND EQUIPMENT ROOM. OK TO COVER WALLS.
03/25/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #7, KNUCKLE AREA - IN WALL ELECTRIC.
03/21/2018 ELECTRIC - INTERMEDIATE Partial Approval IN-WALL ELECTRIC ON LEVEL #2 AT GL: H-L/5-7 (PRE-POST OP AREA).
03/16/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4, TUNNEL AREA: IN-WALL ELECTRIC; SWITCHES AND DATA PORTS.
03/14/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #8, KNUCKLE (NORTH) AREA - IN WALL ELECTRIC. OK TO COVER PROGRESS AREAS.
03/13/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #3, ON - CALL AREA (N.E. CORNER) - IN-WALL ELECTRIC.
03/12/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4, KNUCKLE AREA; NORTH EAST PORTION, IN WALL ELECTRIC.
03/07/2018 ELECTRIC - INTERMEDIATE Partial Approval EQUIPMENT PANELS, TRANSFORMER; LEVEL #4, MAIN ELECTRIC ROOM: PANELS: 4EABH-D1, 4EABH-D2, 4SABL1, 4SABH1. TRANSFORMER: C4SABL1.
03/02/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVELS #5 AND #6, AT KNUCKLE AREA (IN WALL ELECTRIC). OK TO COVER WALLS.
02/21/2018 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC AT E.E.G AREA.
02/20/2018 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC IN LEVEL #1, EVS (GL: G - L/10.5 - 12. KITCHEN AREA AT LEVEL #1, GL: F - G/5 - 7. OK TO COVER WALLS IN PROGRESS AREAS.
02/08/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, AREAS 2 & 3, AT GL: H-L/9 - 13. LEVEL #3 OR ZONE: 4 EQUIPMENT ROOMS, SATELLITE PHARMACY ROOMS. IN WALL ELECTRIC. OK TO COVER WALLS.
02/06/2018 ELECTRIC - INTERMEDIATE Partial Approval MATERIAL RECEIVING AREA: IN WALLS ELECTRIC; LEVEL #1, AREA #3.
01/30/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4, MAIN ELECTRIC ROOM: SWITCH GEAR #4CABL-S1, 4CAAL-S1. PANELS #4EABL-1, 4NBBL-1. BUSS DUCT #4CAAL-L
01/29/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, KITCHEN AREA: ROOMS #101502, ; MAIN ENTRY DOOR OPENER. LEVEL #3, OR AREAS AT GL: H - N/4.2 - 8 (CORRIDORS), IN WALL ELECTRIC; PACU/ISO (CEILINGS) AT GL: H - I/4.2 - 9.5.
01/26/2018 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS, LEVEL #3,#725, 726, 731A-B. LEVEL #5, (KNUCKLE AREA) GL: 11-14/A.9-F.3. OK TO COVER WALLS.
01/23/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, AREA #4; IN-WALL ELECTRIC; OK TO COVER REMAINING TOP-OUT AREAS DOWN TO FLOOR LEVEL.
01/19/2018 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN-WALLS; LEVEL #8, TOWER #4; CENTER SECTION OF ROOMS. OK TO COVER WALLS.
01/11/2018 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS ON LEVEL #2, AT GL: C - H/4.2 - 9. LEVEL #4, ELECTRIC ROOM PANELS #4EAAC1, 4EAAH1, TRANSFORMER #TEAAL1, DISCONNECT #4EABL-1, TAP BOXES #4EAB, 4CEAAH.
01/09/2018 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC AT LEVEL #4, TOWER #4; ROOMS # 310a, AND 801.
01/08/2018 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, KITCHEN AREA; ROOMS #105, 303, 305, 306, 307: WEST CORRIDOR T GL: 5/D - G; IN WALL ELECTRIC.
01/05/2018 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC ON LEVEL #8, TOWER #4 - WEST SIDE ROOMS AND WESTSIDE OF HALLWAY. LEVEL #2, GL: C - H/4.5 -9; IN WALLS: ROMS AND HALLWAYS. LEVEL #4, MAIN ELECTRIC ROOM - SWITH BOARDS: 4EAA-D1; 4EAA-D2; 4NABH-S1; TAP BOXES (4) AT TOWER #4.
01/03/2018 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC IN ROOMS #150104 AND 150309.
12/29/2017 ELECTRIC - INTERMEDIATE Partial Approval MAIN ELECTRIC ROOM: PANEL #4NBBL-S1, ATS-36; SWITCH GEAR # 4CABH-S2, S4ABH-S-1, 4CAAH-S2, 4CCAAH-S1; EMERGENCY SWITCH GEAR - ESS-4A; BUSS CDUCT AND TAP BOX AT LEVELS #4 TO LEVEL #1.
12/28/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #7, TOWER #4 - CENTER ROOMS; IN WALL ELECTRIC. OK TO COVER WALLS.
12/21/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVE #4, GL: F/5 - 11; IN WALL ELECTRIC (OK TO COVER WALL); LEVEL #7, TOWER #4, EAST AND WEST HALLWAYS. LEVEL #5: C-SECTION ROOMS #1 AND #2; BABY RESUSCITATION ROOM. OK TO COVER WALLS.
12/21/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #9, TOWER #4; IN WALLS: EAST, WEST AND CENTER ROOMS.
12/19/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #3, IN WALLS ELECTRIC AT GL: H L/10 - 14; RESTROOM HARD LIDS. OK TO COVER WALL, HARD LIDS AT GL: A - H/4 - 10.5
12/18/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #7, TOWER #4, PATIENT ROOMS #14 - 24: IN WALL ELECTRIC. OK TO COVER WALLS.
12/08/2017 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC AT LEVEL #7, TOWER #4, PATIENT ROOMS #1 - 11; LEVEL #9, TOWER #5; PATIENT ROOMS 1 - 23, 13, 14, 18. OK TO COVER WALLS
12/01/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1: IN WALLS ELECTRIC IN ROOMS #110, 111, 112, 104 (SOUTH WALL), 309 (NORTH WALL).
11/29/2017 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC - LEVEL #4: ICE MAKER ROOM, KITCHEN, FACILITY STORAGE, SHOP; CONTROL ROOM.
11/28/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4, MAIN ELECTRIC ROOM: SWITCH GEAR #4EAAH-1, ATS-35, ATS-34, 4EABH-1. TRANSFORMERS #T3CABL-1, T3CAAL-1, T4EDBL-1. PANELS: 4NAAH-1, 4NBAL-D1. AIR HANDLER DISCONNECTS: AHUB1, B2, C, D1, D2, E, F, H, J. TAP BOX 4NAAH-1.
11/21/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS ON LEVEL #6, TOWER #4. OK TO COVER WALLS.
11/17/2017 ELECTRIC - INTERMEDIATE Approved IN WALL AT IDF ROOM NEAR STAIRWELL #4 - OK TO INSULATE AND SHEETROCK.
11/09/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC ROOMS (HARDWARE), AT LEVELS #5 - 9; PANELS, DISCONNECTS, TRANSFORMERS.
11/08/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVE #3, GL: A - C/4 -10, ELACTRIC IN WALLS. OK TO COVER PROGRESS AREAS.
11/07/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #6, TOWER #4, ROUGH-IN ELECTRIC FOR WALLS: ROOMS #1 - 12.
10/30/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVELS #6 AMD #8, TOWER #4, SHAFTS #13 AND #14, ELECTRIC IN WALLS. OK TO INSULATE, FIRE CAULK AND SHEETROCK.
10/27/2017 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC AT RECOVERY BAY ON LEVEL #5, TOWER #4. OK TO COVER WALLS.
10/26/2017 ELECTRIC - INTERMEDIATE Partial Approval IN WALLS AT SHAFTS #13, 14 AT GL: 11/I - J. OK TO COVER WALLS.
10/24/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS: LEVEL #8, TOWER #5; NORTH AND SOUTH ROOMS. OK TO ONE SIDE SHEETROCK PROGRESS AREAS.
10/23/2017 ELECTRIC - INTERMEDIATE Partial Approval CORRIDOR #140600, IN WALL RECEPTACLES (POWER, FIRE PULL STATION), LEVEL #1. LEVEL #3; GL: 6 - 11/C - H, IN WALL ELECTRIC. OK TO ONE SIDE SHEETROCK IN PROGRESS AREAS.
10/19/2017 ELECTRIC - INTERMEDIATE Partial Approval CONDUITS IN STAIRWELL #3, LEVELS 1 - 5. OK TO INSULATE AND COVER WALLS.
10/18/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVELS #7 AND #8, SHAAFTS #13, AND 14. LEVEL #5, IN WALL ELECTRIC (MIDDLE SECTION), ALL ROOMS EXCEPT FOR REOOMS #021, 023, 131, 132. LEVEL #4, IDF ROOM #0449902, IN WALLS. OK TO ONE SIDE SHEET ROCK.
10/16/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS AT LEVEL #7, TOWER #5.

NOTE: BACKING FOR GRAB BARS IN STAFF RESTROOMS IS MISSING: LEVEL #7, TOWER #5 (WEST END).
10/13/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS , HALLWAY AT LEVEL #5, TOWER #4 (EAST). OK TO COVER WALLS.
10/11/2017 ELECTRIC - INTERMEDIATE Partial Approval PANEL #4NBAL-S1, TRANSFORMERS @ T-4CABL-1, T-4CAAL-1; BUSS DUCT #4NBAL-1. OK TO ENERGIZE PROGRESS AREAS.
10/06/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IIN WALLS; LEVEL #5, TOWER #4; LDR #9 - 12; TRIAGE ROOMS #2 - 4; TOWER #4 WEST SIDE: LOCKER ROOMS; HALLWAY (CARD READERS AND MAGNETIC HOLDERS).

LEVE #4 ELECTRIC IN WALLS; BREAK ROOM; NDF ROOM; ACCESSIBLE SHAFTS #A AND B. OK TO COVER WALLS.
09/29/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #7, TOWER #5, PATIENT ROOMS #13 - 24 (IN WALLS). OK TO INSULATE AND SHEETROCK PROGRESS AERAS. LEVEL #5, TOWER #4, LABR AND DELIVERY ROOMS #1 - 8; IN WALLS. OK TO COVER PROGRESS AREAS.
09/26/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECRIC ROOMS ON LEVELS #5 - 9: TOWER #5. PANELS ARE OK. NEED TO HAVE DISCONNECT BREAKERS TESTED AS PER PAT.
09/21/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #7, TOWER #5; PATIENT ROOMS #1 - 12. OK TO COVER WALLS.
09/15/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC ROOMS ON LEVELS #5 - 9; TRANSFORMERS AND BREAKERS - BREAKERS TO BE TESTED BEFORE FINAL INSTALLATION.
09/14/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, ELECTRIC ROOM AT GL: H - H.25/9, F.5/9. DANCE FLOOR/AMBULANCE AREA - CANNED LIGHTING SYSTEM..
09/05/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #6, TOWER #5 - NORTH AND SOUTH SIDES: ELECTRIC IN WALLS: OK TO COVER WALLS (EXCEPT FOR CEILINGS)
08/25/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4, ELECTRIC ROOM: SWITCH GEAR AND TRANSFORMERS: SWITCH GEAR #SWA-NHAB; SWB - USS-NHA; TRANSFORMER #NHAB (PANELS 3, 5, 6, 7, 8, 9,); TRANSFORMER # T-NHAA; SWITCH GEAR #NLBB; TRANSFORMER # T-NIBA.
08/22/2017 ELECTRIC - INTERMEDIATE Partial Approval GENERATOR ROOM - EMERGENCY (PARALLELING ROOM) PANEL D6: GROUNDING AND NEW BUSS BAR.
08/10/2017 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC IN PATIENT ROOMS #1 - 12; LEVEL #5. PATIENT ROOMS 1 - 11 ON LEVEL #6.
08/09/2017 ELECTRIC - INTERMEDIATE Partial Approval SERVICE ELEVATORS AT LEVELS 4 - 9. IDF ROOMS ON LEVELS 2 - 9; OFFICE #0540136; ON-CALL ROOM #0540408. OK TO COVER WALLS
07/25/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4, TOWER 5; ROOMS 0550111, 0550123, 0550124, 0550125. LEVEL #4, ELECTRIC ROOM #801, GL: G/10; COLUMNS (POWER OUTLETS), GL: 8 - 9/G - I.
07/20/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #4 NORTH EAST ELEVATORS AT GL: 13/D - E; ELECTRIC IN WALLS. OK TO COVER WALLS. ELECTRIC IN WALLS GL" G - L/8, OK TO INSULATE AND COVER WALS.
07/20/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, SERVICE ELEVATOR (SHAFT INTERIOR), WALL BOXES, POWERE BOXES, CONTROL LINES.
07/14/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS: GL: B - F/11 - 12; LEVEL #3.
07/10/2017 ELECTRIC - INTERMEDIATE Partial Approval POWER OUTLETS, DATA LINES, COMMUNICATIONS LINES AT SERVICE ELEVATORS ON LEVELS #2 - 3. LEVEL #3 ELEVATOR NEEDS PUTTY PACK FOR OUTLETS.
07/05/2017 ELECTRIC - INTERMEDIATE Partial Approval LABOR AND DELIVERY ROOM #2, LEVEL #5, TOWER #4. OK TO COVER THE WALLS.
06/30/2017 ELECTRIC - INTERMEDIATE Partial Approval TEP ELECTRIC VAULT: METERING CABINETS, ROUNDING SYSTEM IS COMPLETE, CURRENT TRANSFORMEERS, PARALLELING GEAR. OK TO ENERGIZE THROUGH U OF A UTILITY SYSTEM.
06/28/2017 ELECTRIC - INTERMEDIATE Prior to Final Inspectn TEP VAULT ROOM: CT'S, METER PANELING TO BE COMPLETED; 2ND LEVEL GROUNDING IS INCOMPLETE. WILL RECALL FOR 30 JUNE.
05/09/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #5, MOCK UP ROOMS #10 AND #11. IDF FOOMS ON LEVELS #5, 6, 7, 8, #0549902, 0649902, 0749902, 0849902. ELECTRIC ROOMS ON LEVEL #9, #0949803, 0949804 - OK TO OVER WALLS IN PROGRESS AREAS.
05/02/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC ROO (EMERGENCY ELECTRIC), FIRE PUMP ROOM: CONDUITS AT 2" - 5" IN PLACE. APROXIMATELY 80% COMPLETE IN ABOVE AREAS.
05/01/2017 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ROUGH-IN IN SHAFT #11, LEVELS 5 - 6. ELECTRIC ROOMS: 0849903, 0849904, 0749803, 0749804, 0649803, 0640804, 0549803, 0549804. IDF ROOMS 0849902, 0749902, 0649902.
04/24/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection STAIRWELL #1, LEVELS 4 - 1 ARE UNABLE TO ACESS. LEVELS 9 - 4 INSPECTED 20 APRIL. OK TO COVER WALLS AT LEVELS 9 - 4.
04/20/2017 ELECTRIC - INTERMEDIATE Partial Approval STAIRWELL #1, LEVELS 9 - 5 (LEVELS 4 - 1) RED TAPED OFF, UNABLE TO ACCESS THIS PORTION OF THE STAIRWELL. LEVEL 6, BOXES NEED PUTTY-PACK AT SOUTH DOOR.
04/12/2017 ELECTRIC - INTERMEDIATE Partial Approval WALL AT GL: M/4.2 - 10.5 - CONDUITS AND OUTLET BOXES IN PLACE. OK TO COVER. OVER HEAD CONDUITS (14 AT 1") IN AREA #2, ELEVATOR AREAS. CLUMNS AT GL: 13/J, K, L, M. OK TO INSULATE CONDUITS.
04/04/2017 ELECTRIC - INTERMEDIATE Partial Approval STAIRWELL #1; LEVELS 2 - 8; POWER AND FIRE ALARM BOXES IN PLACE. OK TO INSULATE AND SHEET ROCK.
03/26/2017 ELECTRIC - INTERMEDIATE Partial Approval 1.) PDU AT LEVEL 9, GL: 9.3; K/11. OK TO ENERGIZE UNIT. 2,) OVERHEAD CONDUITS (3/4" - 5") NORMAL AND EMERGENCY CONDUITS (M - N/ 7 - 10). ELECTRIC ROOM, FIRE PUMP ROOM - CONDUITS AT 2 1/2" - 5" ABOVE CEILING.
03/21/2017 ELECTRIC - INTERMEDIATE Partial Approval STAFF/PATIENT ELEVATORS - SOUTH WALLS AT LEVELS 6, 7, 8; BOXES ARE PUTTY PACKED. OK TO COVER WALLS.
03/07/2017 ELECTRIC - INTERMEDIATE Partial Approval PDU AT LEVEL #6: GL: K/11. OK TO ENERGIZE UNIT.
03/03/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #3; ELECTRIC ROOMS : 0349802, 0349803; 034804, 0359806; 0359807; 035908; 035909
03/01/2017 ELECTRIC - INTERMEDIATE Partial Approval PENTHOUSE AREA ALL WALLS EXCEPT FOR 2 HOUR RATED WALL AT STAIRS TO ELEVATOR MOTORS.
02/24/2017 ELECTRIC - INTERMEDIATE Partial Approval PDU AT LEVEL #4; GL: K/11. OK TO ENERGIZE UNIT.
02/21/2017 ELECTRIC - INTERMEDIATE Partial Approval SOUTH AREA; 10 EACH 4" STUB-UP CONDUITS. PDU AT LEVEL #2 K/11: OK TO ENERGIZE UNIT.
02/08/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #5, PDU - OK TO ENERGIZE UNIT.
02/06/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC ROOMS AT LEVELS #5 - 9 (TWO ROOMS ON EACH LEVEL) - OK TO COVER WALLS.
01/16/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #3 PDU: GL: F/7. LEVEL #4 PDU AT GL: F/7. OK TO ENERGIZE UNITS.
01/04/2017 ELECTRIC - INTERMEDIATE Partial Approval PDU AT LEVEL #2 - AREA 2.6. OK TO ENERGIZE UNIT.