| 02/07/2019 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Approved |
|
| 05/25/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
SHAFT AT WOUTH WEST CORNER OF OPERATING ROOM #22 ON LEVEL #3. |
| 05/24/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
STAFF AND VISITOR ELEVATORS AT LEVELS #1 - 9: FIRE CAULKED. OK TO SHEETROCK PROGRESS AREAS. |
| 05/21/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, SHAFT WALL AT WOUTH OF OPERATING ROOM #22; OK TO SHEETROCK PROGRESS AREA. |
| 05/18/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
STAIRWELL #4, LEVELS #1 - #9; TOWER #4: MONO-KOTE PATCHING ON EXPOSED BEAM FROMTS. OK TO SHEET ROCK PROGRESS AREAS. |
| 05/17/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
|
| 05/17/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
BEAM AREAS WITH TEMPORARY ELECTRIC POWER RUNNING THROUGH. POWER CABLES EMOVED, MONO-KOTE PATCHING APPLIED ON TOWER #5; LEVEL #5 THROUGH LEVEL #9. FIRRE CAULKING AROUND CLEAN/DIRTY ELEVATOR FACINGS ON LEVEL #4. |
| 05/04/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE CAULKING IN CSPD AREA - ABOVE CEILING. |
| 03/28/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, FRO MED GAS ZONE BOXES #3.25 AND 3.27. |
| 03/27/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, KNUCKLE AREA FLOOR PENETRATIONS (PLUMBING AREAS) - FIRE CAULKED. |
| 03/25/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE CAULKING OF FLOOR PENETRATIONS (PLUMBING); LEVELS #3, 7, 8, 9, AT KNUCKLE AREAS. LEVEL #8, KNUCKLE AREA, SHAFT WALLS. OK TO COVER. |
| 03/21/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
SHAFT WALLS AT STAIRWELLS #2 AND #4 - OK TO COVER PROGRESS AREAS. |
| 03/15/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #1, WEST SHAFT AT MATERIAL HANDLING AREA - NORTH AND SOUTH WALLS ARE FIRE CAULKED. OK TO COVER PROGRESS AREAS. |
| 02/21/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE CAULKING AT LEVEL #1, DEMISING WALL (GL: 14/B - D); SHAFT AT GL: 4.2/F. |
| 02/09/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
ABOVE CEILING IN PATIENT ROOMS AT LEVEL #6, TOWER #4; ROOMS 064001, 064002, 064003. |
| 02/05/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, SHAFT WALL AT GL: 14/E.2 - H; EXCEPT FOR NORTH AND SOUTH ENDS AT DECK LEVEL. |
| 01/31/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FLOOR PENETRATIONS ON LEVEL #3, LEVEL #4, LEVEL #2 IN AREAS # 3, 6, 8, 10. |
| 01/26/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, SHAFT #1A, AT STAIRWELL #4. OK TO SHEETROCK. |
| 01/23/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #1, AREA #4, SHAFT #7; FIRE CAULKED - OK TO SHEET ROCK. |
| 01/16/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
SHAFT #9 ON LEVEL #3, OK TO SHEETROCK. |
| 01/09/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #2, AREAS #1 - 6, FLOOR PENETRATIONS - FIRE CAULKED. LEVEL #1, SHAFTS #1A AND 1B FIRE CAULKED. OK TO SHEETROCK PROGRESS AREAS. |
| 01/04/2018 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
ROOMS #385, 401, 486; LEVEL #3, NEED TO COMPLETE FIRE CAULKING. |
| 12/21/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, GL: N/12; EDGE OF SLAB: FIRE CAULKED - TWO INCHES FROM TOP OF SLAB. LEVEL #3, AREAS #3, 6, 8, 10; FLOOR PENETRATIONS |
| 12/13/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #7, TOWER #4, PLUMBING FLOOR PENETRATIONS - ALL AREAS FIRE CAULKED. |
| 12/11/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #6, TOWER #4, PATIENT BATHROOMS (CEILINGS). ALL PATIENT ROOMS EXCEPT FOR ROOMS #1, 2, 13, 14, 24 - NEED TO COMPLETE FIRE CAULKING. |
| 12/05/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, QUENCH SHAFT. OK TO SHEET ROCK PROGRESS AREA. |
| 12/04/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE CAULKING AT SOUTH EAST CORNER OF PUMP ROOM; SOUTH WALL; FIRE PUMP ROOM SOUTH WALL. |
| 11/29/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, IDF ROOM, SHAFT #1A, ACCESSIBLE SHAFT. AREAS AREAS ARE FIRE CAULKED. |
| 11/22/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE CAULKING EXTERIOR WALLS OF VISITOR ELEVATORS #9, 10, 11. |
| 11/17/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
TRAUMA ELEVATORS ON LEVELS #1, 4, 5, 6, 7, 8, 9. OK TO SHEETROCK: LEVELS #2 AND 3 ARE NOT READY. |
| 11/15/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVELS 5 AND 6, SHAFT #1; LEVEL #9, SHAFT #10. PROGRESS AREAS AARE FIRE CAULKED. |
| 11/14/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #6, TOWER #4, WASTE AND VENT PENETRATIONS IN FLOORS. |
| 10/31/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, AREAS 1 - 6, GL: 4.2 - 11/C - H. PLUMBING PENETRATIONS IN FLOOR - FIRE CAULKED. |
| 10/19/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, ELEVATOR #3, CAULKED FIRST LAYER OF SHEET ROCK. |
| 10/16/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #5, TOWER #5, ROOM #530460 AT SLAB EDGE. OK TO COVER PROGRESS AREA. |
| 09/27/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVE #4 DOWN TO LEVEL #3; SHAFT #9: 12" WASTE LINE, UNDER TEST. |
| 09/27/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #10, SOUTH EAST CORNER OF ROOF AT ROOF-EDGE SLAB. LEVEL #7, TOWER #4, SHAFT #14; FIRRE CAULKED FIRST LAYER OF SHEETROCK. |
| 09/26/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, SHAFT #3, ALL AREAS EXCEPT FOR SOUTH WALL WHERE STEEL PENETRATION NEEDS TO BE PATCHED. |
| 09/20/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, SHAFT #13, FIRE CAULKED AT FIRST LAYER OF SHEETROCK. |
| 09/19/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #6, TOWER #4; SHAFT #14; LEVEL #4, HEATED HOT WATER SHAFT ON LIEVEL #4. |
| 09/14/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVELS 6, 7, 8, 9; TOWER #5: PLUMBING FLOR PENETRATIONS - FIRER CAULKED; LEVEL #5, TOWER #4. LEVEL #5, TOWER #5, SHAFT #1, LEVEL #5, TOWER #4, SHAFT #13. LEVEL #7, TOWER #4, SHAFT: NOT READY FOR INSPECTION. |
| 09/13/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #5; SHAFT #14, FIRST LAYER OF SHEETROCK HAS BEEN CAULKED. SHAFT #1 IS NOT READY FOR INSPECTION; NEEDS TO BE RECAULKED. |
| 09/11/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, SHAFT #14, FIRE CAULKED FIRST LAYER OF SHEETROCK |
| 08/23/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #6, SHAFT #12; SHAFT #1 FIRST LAYER OF SHEETROCK CAULKED. |
| 08/17/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, CURTAIN WALL AT GL: D/14 -16; N E CRNER AT LEVEL #1; GL: 14/B- E. |
| 08/10/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, N.E. CORNER OF PODIUM; GL: B.2/11 - 12; 12/B.2 - C. |
| 08/09/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #10, STAIRWELL #2, SPRAYED. SERVICE ELEVATORS AT LEVELS #4 - 9: FIRE CAULKED; OK TO INSULATE AND SHEETROCK. L-10, NORTH SIDE DOG HOUSES - NOT RREADY; NEED TO BE SPRAYED. |
| 08/08/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
SERVICE ELEVATORS ON LEVELS #9 AND #8. OK TO INSULATE AND SHEETROCK. LEVEL #10 AT STAIRWELL #2; NOT READY; NEEDS TO BE SPRAYED. |
| 07/27/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
DIRTY ELEVATOR AT GL: 10/I - J; LEVEL 4, SHAFT #8. |
| 07/26/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #9, SHAFTS #10 - 11; OK TO INSULTE AND COVER WALLS. |
| 07/24/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #5, AREAS #1, 2, 3, AND PART OF #4; FLOOR PENETRATIONS FOR LAVES (2 1/2") |
| 07/17/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
PENTHOUSE LEVEL, AREA ABOVE ELEVATORS - FIRE CAULKED. LEVEL 10 STAIRWELL #1; SOUTH AND EAST WALLS. |
| 07/14/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #2, SERVICE ELEVATOR - WALLS FIRE CAULKED. |
| 07/13/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
DIRTY ELEVATOR #04E15; ELECTRIC ROOM # 045980-1A. AREAS HAVE BEEN FIRE CAULKED; OK TO SHEET ROCK PROGRESS AREAS. |
| 07/10/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3; LINEN AND TRASH CHUTES: SERVICE ELEVATORS: LEVELS #2 AND #3 NEED OUTLETS TO BE PUDDY PACKED.. |
| 07/06/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
STAIRWELL #3; SOUTH WALL - FIRE CAULKED. |
| 06/28/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
MET WITH AK&J REPRESENTATIVES CONCERNING FLOOR PENETRATIONS. AGREED ON A WORKABLE SYSTEM. SHAFT #10, LEVEL #4 HAS BEEN FIRE CAULKED. |
| 06/26/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
INTERIOR WALLS OF SHAFT #7 AND 6B. OK TO COVER OUTSIDE WALLS |
| 06/22/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL 4.5; EXTERIOR WALL EDGE AT GL: J.5 - N/13.5: ROCK WOOL AND SPRAY INHIBITOR. |
| 05/29/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #3, WEST WALL AT GL: 4.2/G - L |
| 05/23/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVELS #5 & 6, SHAFTS # 10 & 11...FIRE CAULKED. |
| 05/15/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #7, SHAFT #10, 3 PANELS NEED TO BE CAULKED (WEST SIDE); LEVEL #6, SHAFT #10 AND #11, BOTTOM PORTION OF SHEET ROCK NEEDS TO BE CAULKED. |
| 04/28/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVELS, #5, 6; SHAFTS #10 AND 11 - INTERIOR AND EXTERIOR. LEVEL #7, SHAFTS #10 AND 11 - INTERIOR ONLY. |
| 04/12/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #5, SHAFT #11; FIRE BARRIER CAULKING IN PACE. OK TO COVER SHAFT AREA. |
| 04/06/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #5, SHAFT #10. FIRE CAULKED AT LEVEL 5 TO DECK ABOVE. |
| 04/05/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
TOWER #5, LEVELS #6 AND 7: GL: 10/G - L; TOWER #4, WEST WALLS |
| 03/29/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #5; AT SLAB EDGE (SOUTH WALL): GL: N/5 - 10. OK TO COVER. |
| 03/26/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4, SLAB EDGE AT G: N/5 -10. |
| 03/23/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE STOP PLACEMENT AT LEVEL #2 SOUTH; LEVEL #3 SOUTH SIDE. |
| 03/15/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE STOP ON LEVELS 9 - 5; PENTOUSE WEST WALLS. GL: D.7 - E.25/4 |
| 03/12/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVELS #5 - 8: GL: B/11 - 13. |
| 03/08/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
ELEVATOR #4; LEVELS 5 - 6 WALLS HAVE BEEN FIRE CAULKED. |
| 03/01/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #4; EDGE OF SLAB (ROOF) AT GL: M/6.5 - 8; 7/M - N. |
| 02/22/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
EDGE WALLS IN THE PENTHOUSE. CORRECTIONS: WEST WALL - 2 AREAS NEED ROCK WOOL PLACED; NORTH EAST AREA, MISSED PENETRATION IN WALL.. |
| 02/21/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
SOUTH WALL AT LEVELS 8, 9, 10: GL: M/5 - 10. |
| 02/12/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
PENTHOUSE PARAPET WALLS - OK TO COVER |
| 02/06/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
LEVEL #10 AT GL: G/4.2 - 9.5. |
| 01/31/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
ELECTRIC ROOMS AT LEVEL #4; EDGE OF WALLS (NORTH) LEVELS 5 AND 6 AT GL: D/5 - 9. |
| 01/26/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
EDGES OF LEVELS 6 & 7 AT GL: A/5 - 9. ROCK WOOL AND SPRAYED FIRE BARRIER. |
| 01/20/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
NORTH WALLS AT LEVELS 8 & 9: GL: D/4.2 - 10 |
| 01/17/2017 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
FIRE STOP/FIRE CAULKING IN ELECTRIC ROOMS ON LEVELS 2, 3, 4. OK TO SPRAY FIRE PROTETIVE COATING |